Laserfiche WebLink
Q <br />- io <br />r <br />m <br />0 <br />1' 2` <br />Conform <br />Grade existing ground to place <br />Tapered Edge 1' minimum width (Typ) <br />GENERAL NOTES: <br />1 <br />TE <br />30------------' <br />I <br />Const <br />I <br />Limits of Clearing and Grubbing and Mailbox Relocation - <br />1 <br />22'-23' <br />1 <br />w14' Geosyn�tretic Pavement Interla er (Paving Fabric) <br />ZZ' Pl1 L)n.dae 1bP44vn 1:a' <br />------I- ---------------- <br />----------------- - - <br />-�----30--J <br />0.25' HMA Overlay — Existing Roadway <br />0= <br />E�- <br />a-_x� Conform <br />Variable Depth <br />Shoulder Backing (Typ) <br />TYPICAL SECTION <br />TYPICAL <br />Lone Tree Road: Sto 10+52 to Sta 88+82 (22') _ <br />Sta 88+82 to Sta 114+82 (23')' <br />1. 0.25' HMA Overlay must be placed in two (2) layers of approximately equal thickness with Geosynthetic Pavement Interlayer (Paving Fabric) <br />placed between the layers. <br />2. Placement of HMA Overlay must not begin until the HMA used in Pavement Repair has been in place for a minimum of 18 hours. <br />3. Placement of HMA Driveways must not begin until the HMA used for Mainline Paving has been completed. <br />4. Existing highway and utility facilities must remain in place unless otherwise noted. <br />5. Existing trees, shrubs, fences, mailboxes and other frontage improvements must remain in place unless otherwise noted. <br />6. Existing drainage facilities must remain in place unless otherwise noted. The Contractor must conduct earthwork operations so as not to <br />modify or obstruct the existing drainage. <br />7. Hand grinding of Asphalt Concrete pavement will be required at locations where existing highway and utility facilities are within the Planing <br />Asphalt Concrete Pavement and Pavement Repair limits. Payment for hand grinding will be considered as included in the contract unit price <br />paid for Planing Asphalt Concrete Pavement, <br />8. All Earthwork, except for final shoulder grading, must be completed prior to placing the final layer of HMA pavement. No Shoulder Backing <br />material will be deposited or drifted on the final layer of HMA surfacing. Where the shoulder placement exceeds 0.50' in thickness, the <br />Shoulder Backing must be placed in two (2) or more fully compacted layers. <br />9. Shoulder Backing material at all intersection radii must receive Penetration Treatment at 0.25 gallon/square yard. Limits of the Penetration <br />Treatment work must be confined to intersection radii plus fifty feet (50') in each direction or to the intersection conform. <br />10. The Contractor will be responsible for adequately scheduling inspection and testing of all facilities constructed under this contract with a <br />minimum 24 hour notice to the County. All testing must conform to the Standard Specifications. All re -testing will be paid by the <br />Contractor. <br />COUNTY OF SAN JOAQUIN No SCALE <br />DRAWN BY DATE PROJECT ENGINEER DATE <br />R. gorsdorf o6i2ozs 0r <br />TYPCAL SECTION AND I LONE TREE ROAD RESURFACING <br />GENERAL NOTES (French Camp Road to Murphy Road) <br />CHEC <br />DATE <br />Sheet No. <br />2 of 5 <br />