My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SP6713 - SP6717
PublicWorks
>
VAULT MAPS
>
Small Plans - SP
>
SP6055 - SP6717
>
SP6713 - SP6717
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/8/2024 1:16:00 PM
Creation date
8/11/2023 4:15:02 PM
Metadata
Fields
Template:
Small Plans - SP
Project
Lone Tree Road Resurfacing
Limits
French Camp Road to Murphy Road
Year
2016
Project Engineer
Hadi Tabatabaee
Roads Worked
Lone Tree Rd.
Red Lines
Yes
Project #
220117
Supplemental fields
Classification
Record Drawings
Cross Ref
SP6713 - SP6717
Type
Resurfacing
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
D U <br />FMo <br />Z2 <br />26 <br />Oz <br />,m <br />n 0 D <br />0 0 <br />A r <br />M <br />n <br />z <br />D <br />M <br />M <br />z <br />z <br />M <br />0 <br />0 <br />r� <br />m <br />o <br />100' HMA Tra <br />X50' 1 <br />I:� �Cl� i►1�11►[!��) � i:���lj ��I II <br />O \ `,p <br />FN <br />rl <br />o I ,-- <br />D I <br />D � <br />i <br />I I <br />LEGEND: <br />Variable Depth HMA Overlay <br />0.12 Depth of Planing Asphalt Concrete Pavement <br />IN Limits of Planing Asphalt Concrete Pavement <br />R Conform to Existing Radii <br />0 Adjust Monument Frame and Cover <br />0 Adjust Water Valve Frame and Cover <br />Adjust Utility Vault Frame and Cover <br />a Adjust CPT Test Frame and Cover <br />Not all Frames and Covers shown on plan, <br />see Sheet No. 5 for quantities and locations <br />46 <br />COUNTY OF -SAN JOAQUIN No SCALE <br />DRAWN BY DATE PROJECT ENGINEER DATE <br />mz. govsdov f oc,/2ozs #P4 ?40'A, f,,4,AA--� /IZ/1/L <br />PLAN <br />CHECKED <br />0.25" HMA Overlay <br />EP <br />L 0 N E T R E E <br />13 <br />0.25' HMA Overlav <br />Const <br />EP ebmw lZ_19-16 <br />111�R <br />100' HMA Trans <br />m <br />TREE <br />ROAD <br />RESURFACING <br />0 <br />0 <br />0 <br />o <br />- <br />Road <br />10 <br />+t <br />+ <br />01 <br />Ut <br />Ni <br />° <br />N <br />I:� �Cl� i►1�11►[!��) � i:���lj ��I II <br />O \ `,p <br />FN <br />rl <br />o I ,-- <br />D I <br />D � <br />i <br />I I <br />LEGEND: <br />Variable Depth HMA Overlay <br />0.12 Depth of Planing Asphalt Concrete Pavement <br />IN Limits of Planing Asphalt Concrete Pavement <br />R Conform to Existing Radii <br />0 Adjust Monument Frame and Cover <br />0 Adjust Water Valve Frame and Cover <br />Adjust Utility Vault Frame and Cover <br />a Adjust CPT Test Frame and Cover <br />Not all Frames and Covers shown on plan, <br />see Sheet No. 5 for quantities and locations <br />46 <br />COUNTY OF -SAN JOAQUIN No SCALE <br />DRAWN BY DATE PROJECT ENGINEER DATE <br />mz. govsdov f oc,/2ozs #P4 ?40'A, f,,4,AA--� /IZ/1/L <br />PLAN <br />CHECKED <br />0.25" HMA Overlay <br />EP <br />L 0 N E T R E E <br />13 <br />0.25' HMA Overlav <br />Const <br />EP ebmw lZ_19-16 <br />111�R <br />100' HMA Trans <br />m <br />Conform <br />C Sta 9+38 <br />i m i <br />O <br />D <br />DATE <br />trtErc <br />EP END OF PROJECT <br />Note: <br />Remove existing asphalt concrete driveway at Sta <br />14+88 (Lt), Sta 77+00 (Lt), Sta 80+85 (Rt) and <br />Sta 84+10 (Rt). Removal of driveways will be paid <br />by the Clearing and Grubbing item of work. <br />LONE <br />TREE <br />ROAD <br />RESURFACING <br />(French <br />Camp <br />Road <br />to <br />Murphy <br />0 <br />0 <br />° <br />o <br />o <br />+OD <br />Lone Tree Rd <br />Sta <br />88+53 <br />+ <br />+ <br />3 <br />= Due Road <br />Sta 10+00 <br />N <br />N <br />N <br />C <br />1 <br />I <br />� <br />Const <br />� <br />T R E E <br />R 0 <br />A D rr11L5 <br />114 <br />89 E113 <br />in <br />in <br />v! <br />Conform <br />C Sta 9+38 <br />i m i <br />O <br />D <br />DATE <br />trtErc <br />EP END OF PROJECT <br />Note: <br />Remove existing asphalt concrete driveway at Sta <br />14+88 (Lt), Sta 77+00 (Lt), Sta 80+85 (Rt) and <br />Sta 84+10 (Rt). Removal of driveways will be paid <br />by the Clearing and Grubbing item of work. <br />LONE <br />TREE <br />ROAD <br />RESURFACING <br />(French <br />Camp <br />Road <br />to <br />Murphy <br />Road) <br />D/ <br />I <br />01 <br />I I <br />I I <br />I I I <br />I I <br />I I <br />1 <br />Sheet No. <br />3 of 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.