Laserfiche WebLink
Cf1 <br />�N <br />1n <br />1 <br />14 <br />✓r "� ,..�04DMCAl JEN RD <br />105. NEWTONRD )) <br />- <br />ly RD 4 _ <br />11. HARVEST RD <br />12. COOPER RD <br />13. BRANDYWINE RD <br />;i. 14. DAVIS RD EIS <br />]: 15. ALPINE RD <br />RD <br />RDOSEPH RD RD 1: 16. COPPEROPOLIS RD <br />06. J _. <br />0T. O JOSEPH R RD 01. EL DORADO ST 17. MAIN ST <br />08. MITCHELL RD 02. ASH ST 18. CYPRESS POINT DR <br />09, DAVIS RD W/S <br />10. JACK TONE RD W/S 0]. FOURTH ST 19. INDIAN WELLS CT <br />20. SPRING CREEK DRIVE <br />Oi 21. PEBBLE BEACH LN <br />03 22. JACK TONE RD EIS <br />12 <br />y <br />;i os oB - I <br />22 <br />r <br />07 Ik <br />t <br />`CJI .1 <br />1 <br />RDS 18 <br />• / �" \. — <br />'1 id,J 23. AIRPORT WY1 21 �" Y <br />Ll 24. DURHAM FERRY RD120 rl %*1y�Lr <br />304 <br />23 ;.` CN i <br />r h <br />23 L <br />STANISLAUS COUNTY I <br />PROJECT LOCATION MAP <br />NO SCALE <br />�/II N I UNDERGROUND <br />SGRVICR ALERT <br />6' F <br />m <br />J m <br />F <br />Z <br />COUNTY OF SAN JOAQUIN <br />DEPARTMENT OF PUBLIC WORKS <br />STOCKTON, CALIFORNIA <br />RACK <br />RD 1: EL DORADO STREET, STREET SEAAND FOURTH STR1�To � I <br />RD 2: McALLEN ROAD AND NEWTON ROAD <br />RD 3: JOSEPH ROAD, MITCHELL ROAD, KOFTINOW COURT, DAVIS ROAD W/S AND <br />JACK TONE ROAD W/S <br />RD 4: COOPER ROAD, HARVEST ROAD, BRANDYWINE ROAD, CYPRESS POINT DRIVE, <br />INDIAN WELLS COURT, SPRING CREEK DRIVE, PEBBLE BEACH LANE, ALPINE ROAD, <br />MAIN STREET, COPPEROPOLIS ROAD, DAVIS ROAD E/S AND JACK TONE ROAD E/S <br />RD 5: DURHAM FERRY ROAD AND AIRPORT WAY <br />To Be Supplemented <br />INDEX <br />OF <br />by <br />Standard <br />Plans <br />Dated 2010 <br />Sheet No. 1 <br />TITLE PAGE <br />Sheet No. 2 <br />TYPICAL SECTION, GENERAL <br />NOTES AND <br />PROJECT LOCATION <br />MAP — <br />RD1 <br />Sheet No. 3 <br />PROJECT LOCATION <br />MAPS — <br />RD2 AND RD3 <br />Sheet No. 4 <br />and <br />MAPS — <br />RD4 <br />Revised <br />PROJECT LOCATION <br />MAP — <br />Standard <br />SUMMARY OF QUANTITIES <br />Plans <br />PLANS APPLICABLE TO <br />THIS CONTRACT <br />ARE INCLUDED IN THE <br />PROJECT SPECIFICATIONS <br />BOOK. <br />COUNTY OF SAN JOAQUIN <br />Submitted �'�r 15 2016 <br />KRIS BALAJI <br />DIRECTOR OF PUBLIC WORKS <br />ABBREVIATIONS <br />(In addition to abbreviations shown on SP A10A, RSP A10B <br />and Standard Specifications 1-1.06 Abbreviations) <br />RD Road District SP Standard Plans <br />W/S West Side E/S East Side <br />David MendQ&a <br />RCE 42581 <br />PROJECT ENGINEER DATE CHECKED DATE APPROV D DATE Sheet No. <br />INDEX <br />OF <br />SHEETS <br />Sheet No. 1 <br />TITLE PAGE <br />Sheet No. 2 <br />TYPICAL SECTION, GENERAL <br />NOTES AND <br />PROJECT LOCATION <br />MAP — <br />RD1 <br />Sheet No. 3 <br />PROJECT LOCATION <br />MAPS — <br />RD2 AND RD3 <br />Sheet No. 4 <br />PROJECT LOCATION <br />MAPS — <br />RD4 <br />Sheet No. 5 <br />PROJECT LOCATION <br />MAP — <br />RD5 AND <br />SUMMARY OF QUANTITIES <br />THE STANDARD <br />PLANS APPLICABLE TO <br />THIS CONTRACT <br />ARE INCLUDED IN THE <br />PROJECT SPECIFICATIONS <br />BOOK. <br />ABBREVIATIONS <br />(In addition to abbreviations shown on SP A10A, RSP A10B <br />and Standard Specifications 1-1.06 Abbreviations) <br />RD Road District SP Standard Plans <br />W/S West Side E/S East Side <br />David MendQ&a <br />RCE 42581 <br />PROJECT ENGINEER DATE CHECKED DATE APPROV D DATE Sheet No. <br />