Laserfiche WebLink
Coi st ROAD DISTRICT 1 <br />Lip/EP Limits of Clearing and Grubbing EP <br />Existing Limits of Crack Treatment (Type 3) <br />PCC Curb, °Rcy i•' <br />♦ Fi f,o, <br />Gutter & <br />Sidewalk Existing Existing" <br />r <br />Roadway Surface ,'r� • Z LWl <br />`�— <br />---- — — ———————— — — — — — —°rya m CITY OF <br />C<o STOCKTON� <br />SHOULDER DETAIL SHOULDER DETAIL • �� <br />with Curb & Gutter without Curb & Gutter ��Zco♦. <br />TYPICAL SECTION <br />GENERAL NOTES: <br />1. Existing highway and utility facilities must remain in place unless otherwise noted. z� <br />2. Existing trees, shrubs, fences, mailboxes and other frontage improvements must remain in N i <br />place unless otherwise noted. STOCKTON CITY �'• '' <br />3. The Contractor will be responsible for adequately scheduling inspection and testing of all \\ LIMITS <br />A <br />facilities constructed under this contract with a minimum 24 hour notice to the County.°oy. <br />All testing must conform to the Standard Specifications. All re—testing will be paid by the <br />COUNTY HOSPITAL a �,.f <br />Contractor. <br />4. The Contractor must obtain an Encroachment Permit from Caltrans, City of Stockton, City a111 0 <br />of Manteca, City of Ripon and other agencies necessary for traffic control or any work 9 <br />a ■ <br />outside of the County's Jurisdiction. Payment for this will be considered to be included in o o Pg� sFa� spm : +. <br />the various items of work. <br />5. The Contractor must enter into an Agreement with the Union Pacific Railroad and the MATHEWS 2Tti o5P <br />Stockton Terminal and Eastern Railroad for any work within the Railroads right—of—way. See <br />section 5-1.20C, "Railroad Relations" of the Specifications for further details. e <br />6. The Contractor must obtain all permits and licenses required for the construction and <br />completion of the project, and must perform all work in accordance with the requirements HURD <br />and conditions of all permits and approvals applicable to the project. w w <br />7. The Contractor must exercise due caution and carefully preserve survey bench marks, NNS. 0 LYNN <br />control points, reference points and all survey stakes, and must bear all expenses for Coun <br />it, s <br />replacement and/or errors caused by their unnecessary loss or disturbance. <br />8. Areas in County right—of—way used by Contractor for staging and/or storage of materials =moo <br />will be approved by the Engineer. The areas utilized by the Contractor for staging and/or <br />storage area must be restored to their original condition. Any damages or unclean EL DORADO STREET: Interstate 5 to Stockton City Limits <br />conditions to staging or storage areas must be repaired at the Contractor's own expense. ASH STREET: McKinley Avenue to Fourth Street <br />N It will be the Contractor's responsibility to obtain permission from the property owner to FOURTH STREET: Ash Street to Elm Street <br />o stage equipment or store materials on private property. The Contractor must provide a <br />RECO9 <br />letter of release from the property owner of the areas utilized for staging and/or storage Corrections F, <br />w mJ m � of materials. No Cha <br />r�r,o <br />9. Placement of "No Parking" signs/barricades must be placed no less than 72 hours prior to <br />M <br />work. <br />COUNTY OF SAN JOAQUIN NO SCALE TYPICAL SECTION, GENERAL NOTES CRACK SEAL 2016-2017 Sheet No. <br />AND PROJECT LOCATION MAP RD1 (Various Roads in Road Districts 1-5) 2 of 5 <br />DRAWN BY DATE PROJECT ENGINEER DATE CHECKED DATE <br />,Jonathan Curry o8/16 q/z/ito a 4/�3 e <br />