Laserfiche WebLink
M <br />CO <br />D <br />rMO <br />I <br />W <br />m <br />r <br />r <br />O o� <br />D <br />cRFFk <br />STATE HIGHWAY ROUTE 4 <br />7—IT I CD <br />FM m <br />co 0o <br />_ o <br />m --i <br />m <br />mi <br />ELM S REET <br />O <br />O <br />.h <br />y; <br />4 <br />U <br />Zh <br />s <br />Road District 4 —Farmington <br />O Foreman Court O Staples Way 17 Di Carlo Drive Granada Lane <br />O2 Arrigone Way 10 David Court 18 Grace Street 26 Varene Court <br />O3 Giovanni Court 11 Flor Court 19 Market Street 27 Bentley Court <br />® Catherine Lane 12 Ione Street 20 Mill Street 28 Risso Court <br />O5 Brovelli Lane n 13 Harrison Street 21 Bonham Street <br />D <br />Louie Lane z 14 Knox Drive Alfalfa Street <br />O7 Tommy Way 15 Daniel Street 23 Cady Street 0 <br />® Laurin Drive 16 Ryburn Way ® Granada Court <br />BAKER ROAD <br />A <br />O <br />DAVIS O <br />D <br />ROAD MONTE VISTA DRIVE <br />® ©� 9 10 11D 16 <br />D O O ON( STREET <br />20 j <br />2 <br />FRONT STREET 21 <br />0 <br />FRONT STREET 19 <br />® 26 zo Q <br />o 00�� <br />> <br />P� <br />N�ON� NOTES: <br />S� PSE <br />1❑ All necessary precautions must be taken by the Contractor to Prevent <br />any damage to the PCC driveways. In the event that such damage should <br />occur from Contractors operations, the Contractor shall repair or replace or <br />bring to original condition the damaged PCC driveway(s) at the Contractor's <br />expense. (Front Street: Archerdale Road to Duncan Road). <br />❑2 Existing raised transverse block cracks shall be planed down to existing <br />pavement. Cracks in existing pavement concrete surfacing shall be prepared <br />and sealed. (Front Street: Market Street to State Highway Route 26). <br />COUNTY OF SAN JOAQUIN NO SCALE PROJECT LOCATION MAPS <br />Road District 4 Linden <br />DRAWN BY DATE PROJECT ENGINEER DATE CHECKED DATE <br />Juan Acevedo 09/12 it, &J,0, &J,0, <br />— <br />SLURRY SEAL 2013 <br />(Road Districts 1, 2, and 4) <br />Sheet No. <br />6 of 11 <br />