My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SP6477 - SP6487
PublicWorks
>
VAULT MAPS
>
Small Plans - SP
>
SP6055 - SP6717
>
SP6477 - SP6487
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/8/2024 12:18:42 PM
Creation date
8/18/2023 8:55:38 AM
Metadata
Fields
Template:
Small Plans - SP
Project
Peltier Road Improvements
Limits
300' west of Bender Road to Lower Sacramento Road
Year
2015
Roads Worked
Peltier Rd.
Red Lines
Yes
Project #
220077
Federal #
HSIPL-5929(253)
Supplemental fields
Classification
Record Drawings
Cross Ref
SP6477 - SP6487
Type
Improvements
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
COLLIER RD <br />IPA <br />CALIMYRNA RD <br />OOO 0 <br />z SoN G <br />b <br />Z <br />JAHANT RD AHANT RD <br />PROJECT <br />LOCATION <br />0 <br />s'• <br />a <br />0 T, <br />z <br />m <br />I 1 { 1 <br />TADDEI RD p <br />RINE Z A <br />0 CO <br />A W <br />z <br />0 <br />a <br />`S RODE RD w <br />z 3 0 <br />Z ACAMPO RD <br />PROJECT LOCATION MAP <br />NO SCALE <br />� DIGyA,,�RT <br />F <br />1 Ir'�li► \Y )I;711 Know what's below. <br />COUNTY OF SAN JOAQUIN <br />DEPARTMENT OF PUBLIC WORKS <br />STOCKTON, CALIFORNIA <br />PELTIER ROAD IMPROVEMENTS <br />(300' west of Bender Road to Lower Sacramento Road) <br />Federal Project No. HSIPL-5929 (253) <br />To Be Supplemented by Standard Plans Dated 2010 <br />COUNTY OF SAN JOAQUIN <br />Submitted <br />MICHAEL <br />DEPUTY DIRECTOR <br />INDEX OF SHEETS <br />2015 <br />Sheet No. 1 TITLE PAGE t _c <br />Sheet No. 2 GENERAL NOTES & <br />TYPICAL SECTION <br />Sheet No. 3 SHOULDER DETAILS QESSFoy� <br />Sheet No. 4 PATTERNED MARKINGS DETAILS 1�� �° MENo �4 <br />Sheet No. 5-7 PLAN N 42581 <br />Sheet No. 8 CONSTRUCTION DETAILS <br />Sheet No. 9 EARTHWORK SCHEDULE <br />Sheet No. 10-11 SUMMARY OF QUANTITIES <br />THE STANDARD PLANS APPLICABLE TO THIS CONTRACT <br />ARE INCLUDED IN THE PROJECT SPECIFICATIONS BOOK. <br />R-27, R -28A Sc R -28B <br />ABBREVIATIONS <br />(in addition to abbreviations shown on Standard Plans A10A and <br />RSP <br />Al OB and Standard Specifications 1-1.06 Abbreviations) <br />GP = Guy Pole <br />SE = Safety Edge <br />SJC0 Std = San Joaquin County Standard <br />PROJECT ENGINEER DATE CHECKED DATE APPROVE DATE Sheet No. <br />121 � I(2� IS° 2 �Q 1 of 11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.