My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SP4872- SP4878
PublicWorks
>
VAULT MAPS
>
Small Plans - SP
>
SP4710 - SP6054
>
SP4872- SP4878
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/9/2024 3:31:09 PM
Creation date
8/28/2023 2:25:02 PM
Metadata
Fields
Template:
Small Plans - SP
Project
Avena Road Resurfacing
Limits
Murphy Road to Van Allen Road
Year
2011
Project Engineer
D. Wong
Roads Worked
Avena Rd.
Red Lines
Yes
Supplemental fields
Classification
Record Drawings
Cross Ref
SP4872 - SP4878
Type
Resurfacing
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Gmm,-reel Notes: <br />1. All pavement repair must be completed 18 hours prior to the placement of <br />asphalt concrete. <br />2. Material generated from planing may be thoroughly blended with native material <br />and compacted to 90% relative compaction in shoulder backing area. Planed <br />material shall be capped with a minimum of 0.10' shoulder backing. <br />3. All earthwork (except for final lift of shoulder backing) shall be completed prior to <br />placing final layer of asphalt concrete. No shoulder backing material shall be <br />deposited or drifted on the final lift of asphalt concrete surfacing. <br />4. The contractor shall conduct the shoulder backing operations so as not to disturb <br />or obstruct any existing drainage. <br />n <br />° See Shoulder <br />o Details <br />Const <br />I <br />Limits of Clearing and Grubbing <br />and Mailbox Relocation <br />20' Pavement Reinforcing Fabric <br />0.15' AC Overlay <br />2% ' 27.- <br />5. <br />%_ <br />I <br />L________________ _______ _*---------- <br />n <br />See Shoulder <br />Details o <br />1 <br />3 <br />5. Shoulder backing material at all intersection radii shall receive penetration Exist Roadway I Variable Depth AC Leveling Course <br />COUNTY OF SAN JOAQUIN I No SCALE <br />DRAWN BY I DATE I PROJECT ENGINEER I DATE I CHECKED I DATE <br />. Clary/T. Callahan 03/11 D. Wang 103/111 D. Wang 03/11 <br />Datey3VV F I __ _ <br />Anv Person Using `pus ,,rawin(A 11H \Vp <br />� Inrmation By incnprtwno 1 he Rite Of Vv -f <br />Const Var Depth <br />1 11' , Shld Backing <br />2' 4' o <br />I � <br />0 <br />i q, V_` '� <br />3 <br />--tII7Existing Ground <br />Existing Roadway <br />SHOULDER DETAIL 2 <br />Sta 26+50 to Sta 35+00 (Lt & Rt) <br />Sta 57+00 to Sta 133+25 (Rt) <br />Sta 81+50 to Sta 98+00 (Lt) <br />Sta 107+50 to Sta 133+25 (Lt) <br />Sta 137+42 to Sta 168+00 (Lt & Rt) <br />TYPICAL SECTION, SHOULDER <br />DETAILS, & GENERAL NOTES <br />en <br />n <br />2' 4' —12' ° <br />8%a o <br />3 <br />— Jr� <br />--- - <br />I Var Depth <br />Shld Backing <br />Import Borrow <br />Existing Ground <br />Existing Roadway <br />* Minor ditch grading where necessary <br />to maintain flowline elevation. <br />SHOULDER DETAIL 3 <br />Sta 133+25 to Sta 137+42 (Lt & Rt) <br />AVENA ROAD RESURFACING Sheet No. <br />(Murphy Road to Van Allen Road) 1 2 of 7 <br />treatment at 0.25 gallon/square yard. Limits of the penetration treatment shall <br />8. The Contractor shall be responsible for adequately scheduling inspection and <br />*(0.10' <br />depth at Centerline) <br />D <br />be confined to the intersection <br />radii plus fifty feet (50') in each direction or to <br />to the Standard Specifications. All re—testing shall be paid by the Contractor. <br />N <br />D <br />the intersection <br />conform. <br />Co st 11' Shld Backing <br />TYPICAL SECTION <br />n <br />1 4' <br />0 <br />I O <br />�_: �r �.. <br />Sto 10+00 to Sta 133+25 Lt <br />& Rt <br />F= <br />6. Ditch grading at <br />vertical curve <br />to be paid under Force Account. <br />RECO *Sto 133+251 <br />{.o Sto 131x-42 (Lt & Rt) (Variable Depth at Centerline) <br />7. Portland Cement <br />Concrete used <br />for the Culvert Extension shall be either Type III <br />Corrections By <br />Sta 137+42 to Sta 168+00 (Lt <br />& Rt) <br />m <br />Cement or Type <br />I Cement with <br />Acceleration Agent added. <br />No Changes B-, <br />Sta 10+00 to Sta 26+50 (Lt & Rt) <br />COUNTY OF SAN JOAQUIN I No SCALE <br />DRAWN BY I DATE I PROJECT ENGINEER I DATE I CHECKED I DATE <br />. Clary/T. Callahan 03/11 D. Wang 103/111 D. Wang 03/11 <br />Datey3VV F I __ _ <br />Anv Person Using `pus ,,rawin(A 11H \Vp <br />� Inrmation By incnprtwno 1 he Rite Of Vv -f <br />Const Var Depth <br />1 11' , Shld Backing <br />2' 4' o <br />I � <br />0 <br />i q, V_` '� <br />3 <br />--tII7Existing Ground <br />Existing Roadway <br />SHOULDER DETAIL 2 <br />Sta 26+50 to Sta 35+00 (Lt & Rt) <br />Sta 57+00 to Sta 133+25 (Rt) <br />Sta 81+50 to Sta 98+00 (Lt) <br />Sta 107+50 to Sta 133+25 (Lt) <br />Sta 137+42 to Sta 168+00 (Lt & Rt) <br />TYPICAL SECTION, SHOULDER <br />DETAILS, & GENERAL NOTES <br />en <br />n <br />2' 4' —12' ° <br />8%a o <br />3 <br />— Jr� <br />--- - <br />I Var Depth <br />Shld Backing <br />Import Borrow <br />Existing Ground <br />Existing Roadway <br />* Minor ditch grading where necessary <br />to maintain flowline elevation. <br />SHOULDER DETAIL 3 <br />Sta 133+25 to Sta 137+42 (Lt & Rt) <br />AVENA ROAD RESURFACING Sheet No. <br />(Murphy Road to Van Allen Road) 1 2 of 7 <br />8. The Contractor shall be responsible for adequately scheduling inspection and <br />testing of all facilities constructed under this contract. All testing shall conform <br />o <br />n <br />to the Standard Specifications. All re—testing shall be paid by the Contractor. <br />N <br />Var Depth <br />o <br />y <br />Co st 11' Shld Backing <br />n <br />1 4' <br />0 <br />I O <br />Existing Ground <br />--LExisting <br />Roadway <br />D <br />SHOULDER DETAIL 1 <br />Sta 10+00 to Sta 26+50 (Lt & Rt) <br />M <br />Sta 35+00 to Sta 57+00 (Rt) <br />Sta 35+00 to Sta 81+50 (Lt) <br />P <br />Sta 98+00 to Sta 107+50 (Lt) <br />COUNTY OF SAN JOAQUIN I No SCALE <br />DRAWN BY I DATE I PROJECT ENGINEER I DATE I CHECKED I DATE <br />. Clary/T. Callahan 03/11 D. Wang 103/111 D. Wang 03/11 <br />Datey3VV F I __ _ <br />Anv Person Using `pus ,,rawin(A 11H \Vp <br />� Inrmation By incnprtwno 1 he Rite Of Vv -f <br />Const Var Depth <br />1 11' , Shld Backing <br />2' 4' o <br />I � <br />0 <br />i q, V_` '� <br />3 <br />--tII7Existing Ground <br />Existing Roadway <br />SHOULDER DETAIL 2 <br />Sta 26+50 to Sta 35+00 (Lt & Rt) <br />Sta 57+00 to Sta 133+25 (Rt) <br />Sta 81+50 to Sta 98+00 (Lt) <br />Sta 107+50 to Sta 133+25 (Lt) <br />Sta 137+42 to Sta 168+00 (Lt & Rt) <br />TYPICAL SECTION, SHOULDER <br />DETAILS, & GENERAL NOTES <br />en <br />n <br />2' 4' —12' ° <br />8%a o <br />3 <br />— Jr� <br />--- - <br />I Var Depth <br />Shld Backing <br />Import Borrow <br />Existing Ground <br />Existing Roadway <br />* Minor ditch grading where necessary <br />to maintain flowline elevation. <br />SHOULDER DETAIL 3 <br />Sta 133+25 to Sta 137+42 (Lt & Rt) <br />AVENA ROAD RESURFACING Sheet No. <br />(Murphy Road to Van Allen Road) 1 2 of 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.