My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SP4872- SP4878
PublicWorks
>
VAULT MAPS
>
Small Plans - SP
>
SP4710 - SP6054
>
SP4872- SP4878
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/9/2024 3:31:09 PM
Creation date
8/28/2023 2:25:02 PM
Metadata
Fields
Template:
Small Plans - SP
Project
Avena Road Resurfacing
Limits
Murphy Road to Van Allen Road
Year
2011
Project Engineer
D. Wong
Roads Worked
Avena Rd.
Red Lines
Yes
Supplemental fields
Classification
Record Drawings
Cross Ref
SP4872 - SP4878
Type
Resurfacing
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
D <br />0 <br />n <br />I <br />0.15' AC Overlay <br />I <br />+, <br />50' <br />z <br />Var Depth AC Leveling <br />50' <br />n <br />0 <br />A <br />° <br />AC Trans <br />—� <br />_ <br />Pavement Reinforcing Fabric <br />AC Trans <br />0 <br />z <br />3 <br />W <br />Q <br />n25' <br />� <br />� <br />' 13 <br />25 - <br />A <br />3 <br />n-o� <br />rs� <br />Q <br />cn! <br />Q <br />o <br />o.i <br />o�, �, <br />o <br />+ <br />lol <br />loo�j, <br />oo <br />Const <br />' I <br />I C! <br />o <br />+ <br />�o <br />P <br />J <br />cn I <br />D ` <br />� <br />-u! <br />R <br />EPS <br />o°i <br />R <br />N' <br />00 <br />o <br />AVENA ROAD i� <br />zo <br />�' <br />D <br />I 1 <br />n <br />I <br />D <br />I <br />I <br />z <br />� <br />o <br />> <br />A <br />I � <br />R <br />BEGINNING OF PROJECT <br />I LEGEND 1 <br />0.08 Depth of Asphalt Concrete Pavement Planning <br />Variable Depth Asphalt Concrete Overlay <br />■ Limits of Asphalt Concrete Pavement Planning <br />R Conform to Existing Radii <br />1�- Monument Frame and Cover <br />COUNTY OF SAN JOAQUIN <br />DRAWN BY DATE PROJECT ENGINEER DATE <br />J. Clary/T. Callahan 03/11 D. Wang 03/11 <br />EP - <br />0 20 40 60 <br />HORIZ. SCALE IN FEET <br />CHECKED DATE <br />D. Wang 03/11 <br />0 <br />0 <br />0 50' <br />11 <br />C Tr ns <br />o' <br />31'2" <br />U)01 <br />I" <br />Q ;0 61 <br />+i <br />7t4/-.'-///1 <br />0.15' AC Overlay <br />Var Depth AC Levelin( <br />Pavement Reinforcing <br />Fabric <br />I <br />I� <br />Const <br />0) <br />I cin EP \ <br />F� AVENA ROAD <br />117 <br />RECORD DRAWING <br />Corrections 6yNo Ghenge . Fiv <br />Oate _;o �►_ m <br />�rl�/ i�'plCilr� � ✓ISS`"a ifiW1/11, .Y�rN �Irj Vf�f��p <br />All !r'i. , .: , ._ 9Ctinn. The Site Of V ' <br />0.15' AC Overlay <br />Var Depth AC Leveling <br />Pavement Reinforcing Fabric `' <br />Remove Concrete Headwalls <br />and place 36" Dia Class III RCP <br />See Culvert Detail Sheet 6 <br />124 125 1 6 <br />PLAN AVENA ROAD RESURFACING Sheet No. <br />(Murphy Road to Van Allen Road) 3 of 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.