Laserfiche WebLink
Work Address: "Encroachment Map" French Camp, CA. <br />Work Description: Comcast To Splice On (29) Existing <br />Locations. <br />• Splice & Activation On Existing Wires Only (No <br />New Wire/Cables To Be Installed Or Replaced). <br />• Traffic Control = 5 Days. <br />• EXISTING POLE(S) 27 <br />• EXISTING VAULT(S) 02 <br />SHEETINDEX <br />• Cover -Title #1 <br />• Symbology & Abbreviations #2 <br />• Traffic Control Plans #3-31 <br />• Underground Details #32 <br />1 -Total Taper Footage= (32,838') <br />2- P12 Pages are <br />3- (P4 = 32,838' - 300') = 32,538'. <br />THIS IS AN COMCAST DOCUMENT, PROPRIETARY & CONFIDENTIAL <br />DESIGN: N.PE REV DESCRIPTION DATE <br />DRAWN BY: SL/RZ 0 ISSUE FOR PERMIT 04/08/2 <br />APPROVED: <br />APPROVED: <br />APPROVED: <br />COMICAST <br />VICINITY MAP <br />WORK AREAS SHOWN AS( �) <br />PROD#: JB1313351 <br />CONSTRUCTION TYPE: SPLICING <br />SYSTEM: SJ COUNTY <br />NODE: <br />Will Ayers <br />CA. RTTG Permit Manager <br />SEFNCO/MASTEC <br />Cell 925-315-2492 <br />wayers@sefnco.com <br />8615 Elder Creek Rd <br />Sacramento, CA 95828 <br />JT#: JB1313351 <br />SCALE: NONE <br />PlannENGF-mlannang®gmail.com I <br />SHEET: 1 OF 32 <br />Eagle Roofing Products o'msy <br />J <br />Pan PatlCor <br />Fetich Camp <br />Truck Termlrral� APLEogk <br />- French <br />Flench, <br />G^ <br />_ TreeHouse F <br />�mFer � <br />Family Dollar9 <br />c Distribution Center <br />nww xo <br />Cella Truck end9, <br />f� <br />San General <br />Car Drlvtng Schaal <br />He pi,n <br />Hospital Helipad© <br />Stockton <br />$ <br />Hoy�rttl Pe <br />San Joaquin <br />San JoanNn© <br />General Hos I <br />Livestock Auc(le n <br />Qd <br />Haven PeaceQ 1 <br />ORench Camp School <br />County <br />Coroner® <br />, <br />aup.ia, <br />Poly P�cesslog9 S,g <br />imop� <br />San Joaquin County Jail <br />® <br />n•aY^ <br />Cone9eln <br />z, <br />Health Plan of9 <br />lied Stat <br />Poses® <br />tel S"", <br />Couniv Jail® <br />5 AResiit Montessou <br />5 San Joaquin <br />p <br />Wkrrfth w WMetllgrapi <br />STUNTOOG <br />ACADEMY Q� <br />' <br />99 <br />2 <br />Diamond care, meg <br />\o <br />1IlG <br />Vetla Morsa yQ <br />RI <br />ASIgnc1,lphi[sv <br />P <br />n� <br />1 <br />Blue son Trucking <br />I1 <br />SGEStorog <br />I I`iI es <br />2 <br />PionA� <br />Conslmd onB Fe cetrt Z <br />.sAara <br />..ea. <br />w,atw <br />CpJral///C.rtQmla <br />Track and Trail Psoles <br />EMYman Rtl <br />R ­ n] <br />�Total roofing � <br />µrba.e KUSalakar� Centerl <br />PROD#: JB1313351 <br />CONSTRUCTION TYPE: SPLICING <br />SYSTEM: SJ COUNTY <br />NODE: <br />Will Ayers <br />CA. RTTG Permit Manager <br />SEFNCO/MASTEC <br />Cell 925-315-2492 <br />wayers@sefnco.com <br />8615 Elder Creek Rd <br />Sacramento, CA 95828 <br />JT#: JB1313351 <br />SCALE: NONE <br />PlannENGF-mlannang®gmail.com I <br />SHEET: 1 OF 32 <br />