My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2023_PS-2301501 thru PS-2302000_ - PS-2301938
PublicWorks
>
- PUBLIC SERVICES
>
PERMITS & DEVELOPMENT
>
Encroachment(EP)/Driveway(DW) Permits
>
2023
>
PS-2301501 thru PS-2302000
>
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2023_PS-2301501 thru PS-2302000_ - PS-2301938
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/29/2023 10:04:57 AM
Creation date
8/29/2023 10:02:13 AM
Metadata
Fields
Template:
Permits_Development
DocName
PS-2301938
Category07
Encroachment(EP)/Driveway(DW) Permits
Year2
2023
Notes2
El Dorado St. & Mathews Rd.
Address
3011 Triad Pl., Livermore,CA 94551
Application
Comcast
Type
TCP
Supplemental fields
Cross Ref
PWP7110005
Type (2)
Encroachment Permit (EP)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
LINETYPES <br />GENERAL NOTES: <br />FIBER PLACEMENT NOTES: <br />PROPOSED BORE ROUTE <br />PROPOSED TRENCH ROUTE <br />1. <br />ALL VAULTS/ HANDHOLES TO BE EQUIPPED WITH SECURITY LIDS WITH LOCKING BOLTS. <br />1. <br />CONTRACTOR IS RESPONSIBLE FOR LOCATING ALL UTILITIES 48 <br />CATV <br />NEW AERIAL ROUTE <br />HOURS PRIOR TO CONSTRUCTION ACTIVITY <br />TV <br />OVERPULL/EXISTING COMCAST CONDUIT <br />2. <br />GROUND RESTORATION/RIGHT-OF-WAY SHALL BE RESTORED TO ORIGINAL OR BETTER CONDITION. <br />SEE LOCAL DIRECTORY FOR CONTACT TELEPHONE NUMBER OF <br />T <br />EXISTING TELEPHONE SYSTEM <br />LOCAL CALL BEFORE YOU DIG AGENCY. <br />3. <br />ALL 90 DEGREE BENDS IN CONDUIT CONSTRUCTION WILL BE A MINIMUM OF 36'' RADIUS UNLESS <br />E <br />EXISTING ELECTRICAL SYSTEM <br />SPECIFIED OTHERWISE. <br />2. <br />CONTRACTOR SHALL RECORD SEQUENCE# OF FIBER CABLE AT <br />G <br />EXISTING GAS SYSTEM <br />EVERY WORK POLE, MANHOLE, FIBRE STORAGE LOOP <br />4. <br />BURIED FIBER OPTIC WARNING SIGNS SHALL BE PLACED AT EACH SIDE OF ALL ROAD CROSSINGS, <br />AND TAIL LOCATION. CONTRACTOR TO PROVIDE PROJECT <br />Tv <br />EXISTING TV SYSTEM <br />AT CULVERTS, DITCHESAND IN A STRAIGHT LINE OF SIGHT SPACING OFAPPROXIMATELY 500 FEET. <br />MANAGER WITH SEQUENCE NUMBERS AT PROJECT <br />IRR <br />EXISTING IRRIGATION SYSTEM <br />COMPLETION. <br />5. <br />DEVIATIONS FROM THE ENGINEERED ROUTE REQUIRESA PROJECT MANAGER AND RIGHT-OF-WAY <br />JT <br />EXISTING JOINT TRENCH <br />OWNER OF CARETAKER APPROVAL PRIOR TO CONSTRUCTION. <br />3. <br />SLACK LOOP AND SNOWSHOE STORAGE LOCATIONS SHALL BE <br />DETERMINED ON CONSTRUCTION DRAWINGS, HOWEVER, <br />ss <br />EXISTING SANITARY SEWER <br />6. <br />WHERE PERMITS FROM STATE, COUNTY, CITY, RAILROAD OR GOVERNMENT AGENCIES ARE <br />REEL LENGTHS OF FIVE HUNDRED FEET (500') OR LESSON LARGE <br />SD <br />EXISTING STORM DRAIN <br />REQUIRED, ALL WORK PERFORMED WILL COMPLY WITH THESE AGENCIES STANDARD <br />COUNT FIBER OR THREE HUNDRED (300') OR LESS <br />SPECIFICATIONS. <br />ON SMALL COUNT FIBER ARE DIFFICULT TO USE AND SHOULD BE <br />W <br />EXISTING WATER LINE <br />PLACED AS FSUS, NOT CUTAND RETURNED. <br />x x x <br />EXISTING FENCELINE <br />7. <br />THE PROJECT MANAGER WILL NOTIFY BUILDING MANAGEMENT WHEN WORK WILLBEGIN ON <br />BUILDING. CONTRACTOR TO COORDINATE ROOM ACCESSAND WORKSTARTAND STOP TIMES <br />4. <br />FIBEROPTIC IDENTIFICATION TAGS SHALL BE PLACEDAT EVERY <br />ROADWAY CENTER LINE <br />WITH BUILDING MANAGEMENT. <br />WORK POLE, MANHOLE, FIBER, STORAGE LOOPS, SPLICE <br />PE <br />PROPERTY LINE <br />CASESAND WHERE INDICATED BY PROJECT MANAGER. TAGS <br />S. <br />THE PROJECT MANAGER IS TO BE NOTIFIED BY THE CONTRACTOR 24 HOURS PRIOR TO <br />NEED TO BE PLACED SO AS TO BE READ FROM THE GROUND. <br />PG&E <br />PG&E LINE <br />CONSTRUCTION. SEE COMPANY CONTACT LIST FOR CONTACT NAME(s) AND TELEPHONE <br />NUMBER(s). <br />5. <br />CABLE LUBRICATION SHALL BE USED TO REDUCE PULLING <br />cornu <br />COMMUNICATION LINE <br />TENSION. LUBRICANTS MUST NOT CONTAIN ANY PETROLEUM <br />ABBREVIATIONS <br />9. <br />THE PROJECT MANAGER WILL RESERVE THE RIGHTTO INSPECT AT ANYTIME THE WORK BEING <br />PRODUCTS. <br />PERFORMED BYTHE CONTRACTOR. IF PROJECT MANAGER DETERMINES THAT THE WORK IS NOT <br />COMCAST COMCAST <br />PL <br />PROPERTY LINE <br />BEING PERFORMED TO MINIMUM QUALITY STANDARDS, THEN THE CONTRACTOR SHALL PROVIDE <br />6. <br />A 100 FOOT FIBER COIL MUST REMAIN IN ALLVAULTS UNLESS <br />CL CENTER LINE <br />PUE <br />PUBLIC UTILITY EASEMENT <br />REWORKAT HIS OWN COST. <br />OTHERWISE NOTED. <br />(E) EXISTING <br />R/W <br />RIGHT OF WAY <br />(N) NEW <br />BOW <br />BACK OF WALK <br />10. <br />ANY CHANGE IN PROJECT SCOPE, INCLUDING BUT NOT LIMITED TO, CONDUIT LENGTH, CONDUIT <br />7. <br />ALL BURIED INFRASTRUCTURE MUST BE ACCOMPANIED WITH <br />FOC FACE OF CURB <br />SD <br />EXISTING STORM DRAIN <br />PATH, AERIAL PATH ETC. MUST BE APPROVED BY THE PROJECT MANAGER. <br />WARNING TAPE AND A TRACER WIRE, AT RISER POLES THE <br />MIN MINIMUM <br />SS <br />EXISTING SANITARY SEWER <br />LOCATE WIRE SHALL BE ACCESSIBLE AT THE BASE OF THE RISER. <br />MAX MAXIMUM <br />T <br />EXISTING TELEPHONE <br />11. <br />ALL CORI NG/CONSTRUCTION THAT WILL CAUSE NOISE AND/OR VIBRATION SHALL BE DONE WITHIN <br />D/W DRIVEWAY <br />W <br />EXISTING WATER <br />ALLOWED(9AM-3PM) BUSINESS HOURS. <br />8. <br />ALL RISERS WILL BE CAPPED ATALL TIMES. <br />O/S OFFSET <br />R/R <br />REMOVAL/REPAIR <br />12. <br />ANY AND ALL UNDERGROUND UTILITIES ENCOUNTERED ARE THE RESPONSIBILITY OF THE <br />9. <br />ALL FIBER SHALL BE MARKED AS TO DIRECTION IN EACH VAULT. <br />SYMBOLS <br />CONTRACTOR TO LOCATE, PROTECT. AND REPAIR, IF DAMAGED. <br />RED-NORTH, GREEN-SOUTH, YELLOW-EAST, AND <br />BLUE-WEST, DO NOT TAPE FIBER CABLES TOGETHER IN RISER. <br />NEW COMCAST POWER SUPPLY <br />Q TRANSFORMER <br />13. <br />ALL FOOTAGESARE BASED ON FIELD GATHERED MEASUREMENTS, AS SUCH SOME VARIANCE <br />® <br />NEW COMCAST LOW PROFILE <br />SHOULD BE ANTICIPATED. ADJUST AS NEEDED. <br />m 8 <br />STREET LIGHT <br />14. <br />ALL BURIED CONDUIT/CABLE WILL BE PLACED AT 36" MINIMUM COVER. SITE HAS POTENTIAL FOR <br />POWER SUPPLY W/ METER <br />ROCK THAT WOULD PREVENT THE ABILITY TO PROVIDE THE MINIMUM COVER, IN CASES WHERE <br />DISCLAIMER: <br />TRAFFIC SIGNAL COMBINATION <br />THE MINIMUM COVER CANNOT BE ACHIEVED, THE CONDUIT SHALL BE PLACED IN ASCH 40 EMT SLEEVE <br />D <br />NEW COMCAST VAULT <br />OR APPROVED EQUIVALENT. <br />FIRE HYDRANT <br />1. <br />IT IS THE RESPONSIBILITY OF THE CONSTRUCTION CONSTRUCTOR <br />m0 <br />NEW COMCAST PEDESTAL <br />15. <br />WATER,SEWER, STORM SEWER AND EASEMENT LOCATIONS ARE BASED OFF OF CITY MAPS, <br />TO VERIFY ALL RIGHT OF WAY BEFORE CONSTRUCTION IS TO <br />& MONUMENT <br />NOT FIELD VERIFIED. <br />BEGIN. NO UNDERGROUND INSTALLATION REPRESENTED WITHIN <br />® <br />THESE PLAN SHEETS IS PROPOSED OUTSIDE OF THE RIGHT OF <br />BORE PIT <br />16. <br />BORING OFAC PAVING IS REQUIREDATALL LOCATIONSAS INDICATED ON PLANS. <br />WAY. <br />® CATCH BASIN <br />®' <br />NEW RISERATTACHED TO POLE <br />17. <br />AT NO TIMES SHALL CURBS, GUTTERSOR HANDICAP BE DISTURBED. <br />2. <br />THE UNDERGROUND ROUTE DEPICTED IS PRELIMINARYAND <br />STORM DRAIN MANHOLE <br />WILL/MAY VARY ONCE UTILITIES HAVE <br />® <br />EXISTING POLE <br />18. <br />DOOR HANGERS ARE TO BE PLACED A MINIMUM OF 72 HOURS PRIOR TO START OF CONSTRUCTION. <br />BEEN FIELD LOCATED. <br />Ow WATER MANHOLE <br />(� <br />EXISTING COMCAST VAULT <br />19, <br />PRIOR TO START OF CONSTRUCTION, CONTRACTOR SHALL PLACE MESSAGE BOARDS STATING <br />3. <br />ANCHORING FOR THE AERIAL CONSTRUCTION IS TYPICALLY <br />LANE CLOSURES, AND DELAYSA WEEK IN ADVANCE, LOCATION OF THE MESSAGE BOARD SHALL BE <br />DETERMINED DURING CONSTRUCTION AND IS COLLECTED IN THE <br />© SANITARY SEWER MANHOLE <br />COORDINATE WITH THE CITY INSPECTORAT THE PRE-CONSTRUCTION MEETING. <br />AS-BUILT PHASE. <br />® <br />EXISTING COMCAST PEDESTAL <br />co SEWER CLEAN OUT <br />20. <br />LANE CLOSURES CANNOT EXCEED MORE THAN 300 FT. ATA TIME. FOR SAFETY PURPOSES THERE <br />0 <br />EXISTING IRRIGATION VAULT <br />SHALL BE ONLY ONE CLOSURE ATA TIME ALONG S EL DORADO ST & E MATHEWS RD. MORE FLAGGERS <br />OE ELECTRIC MANHOLE <br />WILL BE NECESSARY TO HELP VEHICLES AND PEDESTRIANS IN THE WORK ZONES DURING <br />ED <br />EXISTING UTILITY VAULT/PEDESTAL <br />THE LANE CLOSURES. <br />D UNIDENTIFIED MANHOLE <br />D� <br />GAS/WATER VALVE <br />WATER METER <br />® <br />TREE/BUSHES <br />© GAS METER <br />THIS IS AN <br />COMCAST DOCUMENT, PROPRIETARY & CONFIDENTIALmm <br />IMPORTANT NOTICE <br />SEFNCO <br />a.0on Pa, <br />con.om,CA,1021 <br />ENG 8(121)40:410 <br />DESIGN: N.PE <br />REV DESCRIPTION <br />DATE <br />Section # 4216/4217 of the Government Code requires a <br />COmmuwCwnoxS <br />�Plann <br />o-'d pimwn.pi n®ng.:0M m Lc m <br />DRAWN BY: SL/RZ <br />0 ISSUE FOR PERMIT <br />04/08/2023 <br />Dig Alert Identification Number to be issued before a <br />"Permit to Excavate" will be valid For your Dig Alert I.D. <br />PROJ # : JB1313351 <br />APPROVED: <br />CALL TOLL FREE <br />CONSTRUCTION TYPE: SPLICING <br />APPROVED: <br />48 HOURS BEFORE YOU DIG <br />UNDERGROUND SERVICE ALERT <br />SYSTEM: SJ COUNTY <br />APPROVED: <br />1-800-227-2600 <br />NODE: <br />SHEET: <br />2 0F 32 <br />
The URL can be used to link to this page
Your browser does not support the video tag.