Laserfiche WebLink
EXCAVATION DATA <br />OWNER <br />I CONCRETE <br />ASPHALT <br />I DIRT <br />COUNTY OF SAN JUAQUIN <br />I N/A <br />N/A <br />I 18'X1' (18 SQ. FT.) <br />TO REMOVE OLD POLE, PLACE NEW GROUND BED & TRANSFER FACILITIES <br />200' <br />YOSEMITE AVE <br />LEGEND <br />m <br />PL <br />PROPERTY LINE <br />® <br />SAI CABINET <br />® <br />JOINT POLE <br />ROW <br />RIGHT OFWAY <br />CJ /p � C <br />VRAD CABINET <br />® <br />MANHOLE <br />FOC <br />FACE OF CURB <br />EN <br />SUB BOX <br />v <br />ROAD SIGN <br />LOG <br />LIP OF GUTTER <br />STREETLIGHT <br />• <br />BOLLARD <br />FOW <br />FRONT OF WALK <br />2. THE CONTRACTOR IS RESPONSIBLE FOR DETERMINING THE EXACT LOCATION OF <br />TRAFFIC LIGHT <br />POTHOLE <br />BOW <br />BACK OFWALK <br />-0 <br />(STANDALONE) <br />FENCELINE <br />PUE <br />mucunurvens�Rr <br />THEM. CONTACT UNDERGROUND SERVICE ALERT (811) 48 HOURS PRIOR TO BEGINNING <br />TRAFFIC LIGHT#' <br />`ry, <br />TREE <br />SW <br />SIDEWALK <br />(OVERHEAD) <br />'� 5° <br />3. THE CONTRACTOR SHALL COMPLY WITH LOCAL ADMINISTRATIVE AND TECHNICAL <br />o <br />-O- GAS <br />48 HRS PRIOR TO DIGGING <br />COUNTY <br />PS <br />PARKSTRIP <br />]O <br />MONUMENT <br />o <br />KIER <br />HEDGE <br />DW <br />DRIVEWAY <br />DRIVEWAY <br />.a <br />FIRE HYDRANT <br />CSL <br />CENTERLINE <br />EXISTING POLE#121071409 <br />REMOVE OLD POLE <br />PLACE GROUND BED (IN DIRT) <br />TRANSFER FACILITIES <br />F- <br />s <br />F- <br />0 <br />PREPARED FOR <br />et&t <br />5j <br />K—W <br />m <br />1 /) <br />W K <br />- <br />PREPARED BY <br />BYERS <br />cw: ESCLCAII-UG 18 <br />CJ /p � C <br />1 ALL PROPOSED UNDERGROUND FACILITIES MUST MAINTAIN A MINIMUM FIVE- FOOT <br />cw O lcrcM o0 <br />UTILITIES <br />GINEERING <br />HORIZONTAL SEPARATION AND ONE -FOOT VERTICAL SEPARATION (AT CROSSINGS) <br />—W— WATER <br />OTHER UTILITIES THAT ARE NOT <br />FROM ALL DOU FACILITIES, MEASURED EDGE OF FACILITY TO EDGE OF FACILITY. <br />COMPANY <br />—T— TELEPHONE <br />SHOWN MAY EXIST IN WORK AREA. <br />2. THE CONTRACTOR IS RESPONSIBLE FOR DETERMINING THE EXACT LOCATION OF <br />4730cJABOT DRIVE, SUITE 104 <br />PLC O'NTOR CA945M <br />Q <br />LOCATION &DEPTH OF EXISTING <br />ALL EXISTING UTILITIES AND FOR THE PROTECTION OF AND REPAIR OF DAMAGE TO <br />DEET TITLE. <br />ELECTRIC <br />PFone: RAP 3%60W <br />THEM. CONTACT UNDERGROUND SERVICE ALERT (811) 48 HOURS PRIOR TO BEGINNING <br />PERMIT <br />-SS- SANITARY SEWER <br />CALL TOLL Uff FREE <br />ANY WORK. <br />APPLICATION <br />-SD- STORM DRAIN <br />3. THE CONTRACTOR SHALL COMPLY WITH LOCAL ADMINISTRATIVE AND TECHNICAL <br />o <br />-O- GAS <br />48 HRS PRIOR TO DIGGING <br />COUNTY <br />Q <br />o <br />KIER <br />NUMBER <br />OF <br />SAN JUAQUIN <br />00 <br />RED <br />WINTER MONTHS PRIOR TO OCTOBER 1ST AND MUST ENSURE THAT THE CONSTRUCTION <br />[HEET <br />301`6 <br />800-227-2600 or 811 <br />0 <br />SITE IS PREPARED FOR THE ONSET OF ANY STORM <br />� <br />� <br />� <br />a <br />a <br />00 <br />� <br />SCALE: NTS <br />I I II \\�A\ I I A02DE7N <br />- <br />cw: ESCLCAII-UG 18 <br />CJ /p � C <br />1 ALL PROPOSED UNDERGROUND FACILITIES MUST MAINTAIN A MINIMUM FIVE- FOOT <br />cw O lcrcM o0 <br />UTILITIES <br />�� ��T1 <br />JAl� � N <br />HORIZONTAL SEPARATION AND ONE -FOOT VERTICAL SEPARATION (AT CROSSINGS) <br />—W— WATER <br />OTHER UTILITIES THAT ARE NOT <br />FROM ALL DOU FACILITIES, MEASURED EDGE OF FACILITY TO EDGE OF FACILITY. <br />TucanoNe: ISYSI aYa-vasa <br />—T— TELEPHONE <br />SHOWN MAY EXIST IN WORK AREA. <br />2. THE CONTRACTOR IS RESPONSIBLE FOR DETERMINING THE EXACT LOCATION OF <br />-E- <br />LOCATION &DEPTH OF EXISTING <br />ALL EXISTING UTILITIES AND FOR THE PROTECTION OF AND REPAIR OF DAMAGE TO <br />DEET TITLE. <br />ELECTRIC <br />SUBSTRUCTURE NOT GUARANTEED. <br />THEM. CONTACT UNDERGROUND SERVICE ALERT (811) 48 HOURS PRIOR TO BEGINNING <br />PERMIT <br />-SS- SANITARY SEWER <br />CALL TOLL Uff FREE <br />ANY WORK. <br />APPLICATION <br />-SD- STORM DRAIN <br />3. THE CONTRACTOR SHALL COMPLY WITH LOCAL ADMINISTRATIVE AND TECHNICAL <br />-O- GAS <br />48 HRS PRIOR TO DIGGING <br />MANUAL FOR GRADING/EROSION AND SEDIMENT CONTROL. CONTRACTOR SHALL HAVE <br />FOR ALL SUBSTRUCTURE <br />ALL APPROPRIATE EROSION AND SEDIMENT CONTROL MEASURES IN PLACE FOR THE <br />NUMBER <br />LOCATIONS <br />WINTER MONTHS PRIOR TO OCTOBER 1ST AND MUST ENSURE THAT THE CONSTRUCTION <br />[HEET <br />301`6 <br />800-227-2600 or 811 <br />SITE IS PREPARED FOR THE ONSET OF ANY STORM <br />