My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SP4097 - SP4108
PublicWorks
>
VAULT MAPS
>
Small Plans - SP
>
SP2851 - SP4195
>
SP4097 - SP4108
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/12/2024 8:52:37 AM
Creation date
9/28/2023 11:25:36 AM
Metadata
Fields
Template:
Small Plans - SP
Project
Mathews, Watters and Priest Roads Resurfacing
Limits
Mathews Rd: Wolfe Rd to Howard Rd Watters Rd: McKinley Ave to East End Priest Rd: Watters Rd to French Camp Rd
Year
2006
Project Engineer
Vincent Li
Roads Worked
Mathews Rd., Watters Rd., Priest Rd.
Red Lines
Yes
Supplemental fields
Classification
Record Drawings
Cross Ref
SP4097 - SP4108
Type
Resurfacing
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Iz <br />O <br />9 - <br />Const. <br />I <br />Limits of Clearing and Grubbing and Mailbox Relocation <br />Var Var. <br />See See Plans for Width See Plans for Width See <br />Shoulder Details 1' Var. Width 1' Shoulder Details <br />Sheet No. 3 Pavement Reinforcing Fabric II Sheet No. 3 <br />Var. I Var. <br />�----- ----- — — — <br />—I <br />Existing Roadway 0.17' Asphalt <br />Concrete Overlay <br />GENERAL NOTES: <br />1. Contractor shall scarify native soil adjacent to pavement at <br />intersection radii to a depth of 6" and blend Shoulder Backing <br />material prior to compaction. Limits of this work shall be <br />confined to intersection radii plus 50 feet in each direction. <br />Payment for blending shall be considered as included in the <br />price for Shoulder Backing. <br />2. All earthwork (except for final shoulder grading) shall be <br />completed prior to placing final lift of asphalt concrete. <br />No Shoulder Backing shall be deposited or drifted on the final <br />lift of asphalt concrete surfacing. Where the Shoulder Backing <br />placement exceeds 0.30' in thickness, the Shoulder Backing <br />shall be placed in two fully compacted layers. <br />3. Asphalt Concrete shall be placed in one (1) layer with <br />pavement reinforcing fabric placed on the existing pavement. <br />4. All existing trees, shrubs, fences and other frontage improvements <br />are to remain in place unless otherwise noted. <br />5. 2' wide pavement planing at raised transverse block cracks <br />shall be done as directed by the Engineer. <br />COUNTY OF SAN JOAQUIN I NO SCALE <br />DRAWN BY DATE <br />L421 Caw <br />ENGINEER I DATE <br />TYPICAL SECTION <br />6. Miscellaneous Asphalt Concrete Leveling to be provided by <br />Force Account at Watters Road, Sta. 13+75 to Sta. 14+50 (Rt.) <br />7. Existing drainage facilities shall remain in place unless otherwise <br />noted. The Contractor shall conduct earthwork operations so as <br />not to modify or obstruct the existing drainage. <br />8. Placement of asphalt concrete overlay shall not begin until the <br />asphalt concrete used in pavement repair has been in place <br />for 12 hours. <br />9. Removal of Asphalt Concrete Dike shall be paid for under the <br />Clearing and Grubbing Item. <br />10. Existing utilities frames and covers to be adjusted to final grade <br />by others after roadway resurfacing. <br />tiECOR D DRAWING <br />Corrections By <br />No Changes By t <br />Date /V //2/0& <br />Any Person Using This Drawing Should Verily <br />All information By inspecting The Site Of Work <br />TYPICAL SECTION AND I MATHEWS, WATTERS AND PRIEST ROADS RESURFACING Sheet No. <br />GENERAL NOTES (Mathews Rd: Wolfe Rd to Howard Rd; Watters Rd: McKinley Rd to East End; Priest Rd: Watters Rd to French Camp Rd) 2 of 12 <br />DATE I APPROVAL RECOMMENDED I DATE <br />
The URL can be used to link to this page
Your browser does not support the video tag.