My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2023_PS-2302501 thru PS-2303000_ - PS-2302966
PublicWorks
>
- PUBLIC SERVICES
>
PERMITS & DEVELOPMENT
>
Encroachment(EP)/Driveway(DW) Permits
>
2023
>
PS-2302501 thru PS-2303000
>
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2023_PS-2302501 thru PS-2303000_ - PS-2302966
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/2/2024 7:45:56 AM
Creation date
10/3/2023 9:38:19 AM
Metadata
Fields
Template:
Permits_Development
DocName
PS-2302966
Category07
Encroachment(EP)/Driveway(DW) Permits
Year2
2023
Notes2
SS Lincoln Rd. 750' WO Gettysburg Pl.
Address
3043 Gold Canal Dr. STE 201
Application
Geosyntec Consultants, Inc/Tim Davis
Type
Bore (over 12 inch Dia)
Supplemental fields
Cross Ref
PWP7110005
Type (2)
Encroachment Permit (EP)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
50
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Geosynteco' <br />consultants <br />zone is where ISCO has been or is proposed to be applied. If the well is located <br />within the remedy footprint it must satisfy at least one of the criteria listed under <br />Criteria 1 (a, b, or c) to continue being evaluated for destruction. <br />4. Is the well needed to evaluate remedy performance? - This criterion evaluates <br />whether the well allows for assessment of remedial performance for COCs and/or <br />hexavalent chromium. <br />5. Does the well provide groundwater flow information relevant to the remedy? - <br />This criterion evaluates whether the data from the well allows evaluation of <br />groundwater flow direction and gradients within the treatment zone, and overall <br />Site background as part of the remedial performance assessment process. <br />6. Will destruction of the well impact nearby well(s) used for remedy assessment? — <br />This criterion evaluates whether the well destruction activities could potentially <br />damage nearby wells (i.e., nested or co -located well pairs). <br />Based on the Decision Tree, 40 wells have been identified and are being proposed for <br />destruction at this time (Table 2 and Figure 2). Well construction specifications for these <br />wells are provided in Table 1. In the future, as the remedy progresses and additional wells <br />satisfy the aforementioned criteria, the Trust plans to propose additional wells for <br />destruction. The following sections describe the pre -field and field activities for well <br />destruction. <br />1� W 1 3111 MIATI) 9 "WIT8110IN I I I <br />5.1 Pre -field activities <br />Prior to the start of field activities, Geosyntec will perform the following: <br />• Geosyntec will contact Underground Service Alert (USA) a minimum of 48 hours <br />prior to commencement of digging or drilling activities; <br />Geosyntec will obtain well destruction permits from the San Joaquin County <br />Environmental Health Department (SJCEHD). If destruction via shot perforation <br />will be implemented, explosive use permits will be acquired by the contractor; <br />• Geosyntec will obtain encroachment permits from San Joaquin County or the City <br />of Stockton if working in the public right of way is required; <br />Well Destruction Work Am 4 June 27, 2023 <br />
The URL can be used to link to this page
Your browser does not support the video tag.