Laserfiche WebLink
D <br />M <br />r— <br />M <br />Z <br />_ <br />NO. 1 <br />ELEVENTH ST <br />uj <br />Q <br />- - <br />w <br />m <br />_._. <br />NO. 4 <br /><. \A`' <br />Lu <br />U <br />Z_.-_- <br />CABERD <br />w <br />U <br />W <br />stip <br />> <br />Q <br />o <br />O' <br />Of <br />Q <br />u <br />Q <br />U <br />g <br />SCHULTE ROAD <br />YOSEMITE DR <br />i <br />• <br />7 <br />A • <br />TRACY <br />CITY LIMITS <br />CITY OF <br />TRACE° <br />c�oav <br />C. <br />VALPICO RD <br />N <br />--- - <br />— <br />County <br />PROJECT LOCATION MAP <br />Know what's bebw. <br />CaIIffl1 beftnyoudlg. <br />PROJECT ENGINEER <br />NO SCALE <br />F111 RD DRAWING <br />DATE <br />NO. 1 <br />CHECKED <br />2/27/23 <br />SHEET <br />gx ,. <br />DATE <br />2/27/23 <br />ACCEPTED <br />11 1 -2— / <br />COUNTY OF SAN JOAQUIN <br />DEPARTMENT OF PUBLIC WORKS <br />STOCKTON, CALIFORNIA <br />SCHULTE ROAD RESURFACING <br />(MacArthur Drive to Chrisman Road) <br />To _.Be Supplemented by Standard Plans Dated 2018 <br />and Revised Standard Plans <br />COUNTY OF SAN JOAQUIN <br />Submitted May 1 1 2023 <br />INDEX OF SHEETS <br />SHEET <br />NO. 1 <br />SHEET <br />NO. 2 <br />SHEET <br />NO. 3 <br />SHEET <br />NO. 4 <br />SHEET <br />NO. 5 <br />NAJFE Z`RIF° <br />DEPUTY DIRECTOR OF PUBLIC WORKS <br />TITLE PAGE <br />GENERAL NOTES AND TYPICAL SECTION <br />PLAN <br />CONSTRUCTION DETAILS <br />SUMMARY OF QUANTITIES <br />THE STANDARD PLANS APPLICABLE TO THIS CONTRACT <br />ARE INCLUDED IN THE PROJECT SPECIFICATIONS BOOK. <br />ABBREVIATIONS <br />(In addition to abbreviations shown on SP A3A, A313 & A3C <br />and Standard Specifications 1-1.06 Abbreviations) <br />CFNR = California Northern Railroad <br />D = District (Supervisorial) <br />SJ Co Std = Sari Joaquin County Standard <br />SP = Standard Plans <br />TE •= Tapered Edge <br />r_ d <br />10110191 <br />ESS/ <br />z <br />U-1 No. 76379 <br />��9 F <br />CIV F���\� <br />OF CAS-\ <br />C) <br />Jayna Rutz <br />RCE 76379 <br />Sheet No. <br />1 of <br />