Laserfiche WebLink
Conform @ E.P. <br />�. CC) <br />Existing Width <br />12' Min. <br />0.30' Asphalt Concrete over shaped <br />and compacted native material. <br />Conform @ E.P.-- <br />TYPE D <br />Sta. 215+20 Lt. <br />Saw cut @ joint (� to Joint, 18't). <br />Remove concrete from edge of pavement to joint. <br />The costs for removing concrete (Approx. 30 S.Y.) <br />is to be included in other items of work. <br />Variable depth Asphalt Concrete <br />over existing paved driveway. <br />TYPE E <br />R=Conform to existing radius <br />TYPICAL DRIVEWAYS <br />N / <br />O f20'—f -- ---- - Pipe Length <br />(TYP-) <br />PIPE DETAIL <br />Stc- 254+51 (20' Rt.) <br />Sta. 261+44 (20' Rt.) <br />Sta. 268+00 (20' Rt.) <br />COUNTY OF SAN JOAQUIN <br />DRAWN BY DATE ,P�ROJECT ENGINEER D E( <br />/ATE CHECK <br />�7%auns"o � arna 6/99 19",�_ 6`399 A I. <br />20'—i <br />(Typ.) <br />00 <br />A.C. Overlay - <br />Exist. Roadway— <br />Structure ,.,,,, <br />(95% Relative <br />Compaction) <br />12" Standard frame and <br />Dia. or Sq. cover assembly <br />6" (Refer to SJCO Std. <br />Dwg. CW -M1.) <br />i <br />.V _V V8 4" <br />P.C.C. : �L' I <br />i <br />a <br />Undisturbed ----Survey monuments <br />basement soil 3/4"0 x 30" iron pin <br />with identification marks <br />(TO BE INSTALLED BY OTHERS) <br />SURVEY MONUMENT <br />*Asphalt Concrete <br />(Miscellaneous Areas) <br />_-_ n r -n' n n <br />-xisting <br />surface <br />NO SCALE CONSTRUCTION DETAILS <br />DATE SUBMITTED DATE APPROVAL OMMENDED <br />6 3ha) <br />DATE <br />1 0.D1'i•- <br />- 0.D+2' <br />Sta. 261+44 (20' Rt.) <br />* Sta. 254+51 (20' Rt.) <br />Sta. 268+00 (20' Rt.) <br />ALPINE ROAD RESURFACING Sheet No. <br />(Live Oak Road to Harney Lane) 1 6 of 7 <br />i0*01 <br />-Q0 <br />DPipe <br />Inv. Elev.---- <br />v <br />A <br />Refer to Sheet 5 <br />for actual Inv. Elev. <br />m <br />0 <br />PIPE DETAIL <br />Stc- 254+51 (20' Rt.) <br />Sta. 261+44 (20' Rt.) <br />Sta. 268+00 (20' Rt.) <br />COUNTY OF SAN JOAQUIN <br />DRAWN BY DATE ,P�ROJECT ENGINEER D E( <br />/ATE CHECK <br />�7%auns"o � arna 6/99 19",�_ 6`399 A I. <br />20'—i <br />(Typ.) <br />00 <br />A.C. Overlay - <br />Exist. Roadway— <br />Structure ,.,,,, <br />(95% Relative <br />Compaction) <br />12" Standard frame and <br />Dia. or Sq. cover assembly <br />6" (Refer to SJCO Std. <br />Dwg. CW -M1.) <br />i <br />.V _V V8 4" <br />P.C.C. : �L' I <br />i <br />a <br />Undisturbed ----Survey monuments <br />basement soil 3/4"0 x 30" iron pin <br />with identification marks <br />(TO BE INSTALLED BY OTHERS) <br />SURVEY MONUMENT <br />*Asphalt Concrete <br />(Miscellaneous Areas) <br />_-_ n r -n' n n <br />-xisting <br />surface <br />NO SCALE CONSTRUCTION DETAILS <br />DATE SUBMITTED DATE APPROVAL OMMENDED <br />6 3ha) <br />DATE <br />1 0.D1'i•- <br />- 0.D+2' <br />Sta. 261+44 (20' Rt.) <br />* Sta. 254+51 (20' Rt.) <br />Sta. 268+00 (20' Rt.) <br />ALPINE ROAD RESURFACING Sheet No. <br />(Live Oak Road to Harney Lane) 1 6 of 7 <br />