Laserfiche WebLink
/ <br />1� <br />1w <br />I <br />0 <br />PLANING ASPHALT <br />CONCRETE PAVEMENT <br />Location Quantit <br />Sta. 203+00 to Sta. 203+50 133 S.Y. <br />Sta. 280+10 to Sta. 280+35 67 S.Y. <br />Total 200 S.Y. <br />EARTWORK <br />(Misc. Areas) <br />Location Quantit <br />Shoulder Detail 3 <br />Sta. 253+91 to Sta. 280+35 Rt. 26.44 Sta. <br />PLACE ASPHALT CONCRETE <br />(Misc. Areas) <br />Location Quantity <br />Sta. 254+51 (20' Rt. @ Pipe) 27 S.Y. <br />Sta. 268+00 (20' Rt. 4 Pipe) 24 S.Y. <br />Totai 51 S.Y <br />SHOULDER BACKING <br />Location Quantity <br />Sta. 203+00 to Sta. 280+35 2,418 Tons <br />COUNTY <br />DRAWN BY DATE <br />.7Jalc�nas� <br />e. 6199 <br />OF SAN <br />PROJECT ENGINEER <br />JOAQUIN <br />DATE CHECKED <br />DRIVEWAYS (Type D) <br />Quantity Area <br />2 Locations 59 S.Y. <br />DRIVEWAYS (Type E) <br />Quantity Area <br />9 Locations 355 S.Y. <br />ASPHALT CONCRETE <br />(Type A) <br />Location Quantity <br />A.C. (TXQe . A) <br />Mainline (Resurfacing) <br />Sta. 203+00 to Sta. 280+35 4,078 Tons <br />A C, (IyQ B) <br />Handel Road Intersection <br />254+50 Rt. 47 Tons <br />Driveways Types D & E) 54 Tons <br />Asphalt Concrete (Misc. Areas) 18 Tons <br />Total 4,197 Tons <br />NO SCALE I SUMMARY OF QUANTITIES <br />DAT/E SUBMITTED DATE APPROVAL OSEOM MENDED DATE <br />12" DIA. REINFORCED <br />CONCRETE PIPE (CLASS V) <br />Location Quantity <br />Sta. <br />254+51 <br />(20' <br />Rt. <br />@ <br />Handel Rd.) <br />80 <br />L.F. <br />Sta. <br />261 +44 <br />(20' <br />Rt. <br />@ <br />Field Ent.) <br />72 <br />L.F. <br />Sta. <br />268+00 <br />(20' <br />Rt. <br />6) <br />Dwy.) <br />56 <br />L.F. <br />Total 208 L.F. <br />MONUMENT <br />FRAMES AND COVERS <br />Location Quantity <br />Sta. 228+13± 1 Each <br />Sta. 254+51± 1 Each <br />Total 2 Each <br />(04 t-vc` <br />ALPINE ROAD RESURFACING Sheet No. <br />(Live Oak Road to Harney Lane) 1 7 of 7 <br />