Laserfiche WebLink
PROJECT LENGTH: 5, 186ft <br />CALTRANS LENGTH: 2,522ft <br />CIN LENGTH: <br />RAILROAD LENGTH: <br />COUNTY LENGTH: 2,664ft <br />WATER LENGTH: <br />CONSTRUCTION TOTALS <br />MATERIAL TOTALS <br />BORE <br />2,664' <br />LF <br />1.25% HDPE CONDUIT <br />5,186' <br />LF <br />CASED BORE <br />— <br />LF <br />4 -WAY FUTURE PATH <br />5,185' <br />LF <br />TRENCH <br />LF <br />10/12mm MICRODUCT <br />LF <br />PLOW <br />-- <br />LF <br />4°0 CASING <br />-- <br />LF <br />BRIDGE ATTACHMENT <br />LF <br />3/4"0 EMT PIPE <br />LF <br />CONDUIT OVERRIDE <br />LF <br />TRACEABLE MULE TAPE <br />LF <br />AERIAL <br />-- <br />LF <br />ESTIMATED FIBER <br />5,636 <br />LF <br />AERIAL STRAND <br />LF <br />SLACK LOOPS <br />3 <br />POLE RISER <br />-- <br />24x36X24 HANDHOLES <br />2 <br />BORE PITS <br />8 <br />BARREL VAULT <br />-- <br />MARKER POST (EST.) <br />2 <br />CONTRACTOR NOTICE: <br />THE EXISTENCE AND LOCATION OF ANY UNDERGROUND UTILITY PIPES OR <br />STRUCTURES SHOWN ON THESE PLANS WERE OBTAINED BY FIELD INSPECTION AND A SEARCH OF THE <br />AVAILABLE CITY OR COUNTY RECORDS. SINCE THE ACTUAL LOCATION AND NATURE OF THE UNDERGROUND <br />FACILITIES MAY BE SOMEWHAT DIFFERENT FROM THAT SHOWN, THE CONTRACTOR IS REQUIRED TO VERIFY <br />THE INFORMATION THROUGH UNDERGROUND SERVICE ALERT (USA) OR BY CONTACTING THE UTILITY <br />COMPANIES DIRECTLY, PRIOR TO EXCAVATION. <br />GENERAL NOTES: <br />THE FOLLOWING NOTES ARE PROVIDED TO GIVE DIRECTIONS TO THE CONTRACTOR BY THE ENGINEER OF <br />WORK. THE PERMIT AGENCY'S SIGNATURE ON THESE PLANS DOES NOT CONSTITUTE APPROVAL OF THESE <br />NOTES AND THAT AGENCY WILL NOT BE RESPONSIBLE FOR THEIR ENFORCEMENT: <br />1, THE LOCATIONS OF EXISTING UTILITIES, RIGHTS-OF-WAY AND EASEMENTS SHOWN ON THESE PLANS <br />ARE BASED ON AVAILABLE RECORDS AND ARE APPROXIMATE IN NATURE. WHERE CONFLICTS EXIST <br />WITHIN THE RECORDS OR BETWEEN THE RECORDS AND FIELD OBSERVATIONS, THE ENGINEER OF <br />WORK ASSUMES NO RESPONSIBILITY FOR THE CORRECTNESS OF THAT INFORMATION AS DEPICTED. <br />2, PRIOR TO COMMENCING IMPROVEMENT OPERATIONS, THE CONTRACTOR SHALL VERIFY THE LOCATION, <br />BOTH HORIZONTALLY AND VERTICALLY, OF ALL EXISTING FACILITIES AFFECTED BY THE PROPOSED <br />WORK, WHETHER OR NOT THOSE FACILITIES ARE DEPICTED CORRECTLY ON THESE PIANS. <br />3. IF EXISTING FACILITIES VARY SIGNIFICANTLY IN LOCATION OR DEPTH FROM THESE PLANS, THE <br />ENGINEER OF WORK SHOULD BE NOTIFIED TO MAKE ANY DESIGN CHANGES REQUIRED. <br />4, THE CONTRACTOR SHALL BE TOTALLY RESPONSIBLE FOR COMPLIANCE WITH THE PROVISIONS OF THE <br />STATE OF CALIFORNIA SAFETY ORDERS. <br />5. THE CONTRACTOR AGREES THAT HE SHALL ASSUME SOLE RESPONSIBILITY FOR JOB SITE CONDITIONS <br />DURING THE COURSE OF CONSTRUCTION OF THIS PROJECT, INCLUDING SAFETY OF ALL PERSONS AND <br />PROPERTY; THAT THIS REQUIREMENT SHALL APPLY CONTINUOUSLY AND NOT BE LIMITED TO NORMAL <br />WORKING HOURS; AND THAT THE CONTRACTOR SHALL DEFEND, INDEMNIFY AND HOLO THE OWNER <br />AND THE ENGINEER OF WORK HARMLESS. <br />6. THE BORE LOCATIONS INDICATED ON THE STAKING SHEETS ARE THE ENGINEER'S BEST ESTIMATE OF <br />LOCATION AND LENGTH AS REQUIRED TO MEET JURISDICTIONAL REQUIREMENTS AND/OR TO AVOID <br />SURFACE OR OTHER DAMAGE THAT MAY BE ASSOCIATED WITH TRADITIONAL TRENCHING METHODS. <br />INSPECTOR & CONTRACTOR SHALL REVIEW ALL FIELD CONDITIONS PRIOR TO CONSTRUCTION AND <br />VERIFY THAT THE INDICATED BORE UNITS ARE ACCURATELY IDENTIFIED, APPROPRIATELY LOCATED AND <br />ACTUALLY REQUIRED (NOTIFY ENGINEER AND /OR OWNER OF ANY DISCREPANCIES). IF A BORE UNIT <br />CAN BE ELIMINATED, WITH THE APPROVAL OF THE PERMITTING AUTHORITY AND WITH AN ASSOCIATED <br />NET COST SAVINGS, THEN THE BORE UNIT SHALL BE ELIMINATED. ALSO, NOTIFY ENGINEER AND /OR <br />OWNER OF ADDITIONAL BORES THAT ARE REQUIRED, BUT ARE NOT INDICATED ON THE STAKING <br />SHEETS. <br />7. THE HANDHOLE/VAULT LOCATIONS INDICATED ON THE STAKING SHEETS ARE THE ENGINEER'S BEST <br />ESTIMATE OF LOCATION FOR PLACING THE UNIT AS REQUIRED TO MEET CVIN, JURISDICTIONAL <br />AND/OR SAFETY REQUIREMENTS AND TO PROVIDE AN APPROPRIATE LOCATION THAT WILL ALLOW FOR <br />PARKING, EASE OF ACCESS AND ADEQUATE SPACE TO PERFORM INSTALLATION AND MAINTENANCE <br />WORK. IN HIGHWAY LOCATIONS WHERE THE CONDUIT RUNNING LINE IS INDICATED TO BE IN THE <br />ROAD SHOULDER NEAR THE EDGE OF ASPHALT, THE HANDHOLES SHALL BE PLACED AT LEAST 20 <br />FEEL AWAY FROM THE FOG LINE (BEYOND THE CLEAR RECOVERY ZONE), IN A SAFE LOCATION AWAY <br />FROM ANY BIOLOGICAL OR CULTURAL AVOIDANCE AREAS. CONDUIT SHALL ENTER AND EXIT THE <br />HANDHOLE USING SEPARATE TRENCHES AT 45 -DEGREES TO THE ROADWAY TO MAINTAIN ROUTE <br />DIVERSITY. INSPECTOR & CONTRACTOR SHALL REVIEW ALL FIELD CONDITIONS PRIOR TO <br />CONSTRUCTION AND VERIFY THAT ALL INDICATED UHF UNITS ARE APPROPRIATELY LOCATED. FINAL <br />POSITION OF UHF MAY BE RELOCATED IF A MORE APPROPRIATE POSITION CAN BE IDENTIFIED <br />NEARBY. (NOTIFY ENGINEER AND/OR OWNER OF ANY DISCREPANCIES & ADJUSTMENTS). ALSO, <br />NOTIFY ENGINEER AND/OR OWNER OF ADDITIONAL HANDHOLES THAT MAY BE REQUIRED, BUT ARE NOT <br />INDICATED ON THE STAKING SHEETS. <br />8, CONTRACTOR SHALL PROVIDE COMPLETE AS -BUILT PLANS, WITH GPS COORDINATES IN NAD -83 <br />FORMAT, WITH SUB -METER ACCURACY (N000.00000000, W000.00000000) FOR ALL CONDUIT SPLICE <br />POINTS, HANDHOLES AND ROAD CROSSING LOCATIONS, PER CVIN SPECIFICATIONS. <br />9. CONTRACTOR SHALL SUPPLY AND INSTALL (1) 18AWG SOLID COPPER TRACER WIRE (RED INSULATION) <br />WITH 1.25" CONDUIT (IF NOT INCLUDED WITH FUTURE PATH CONDUIT). SPLICE AS REQUIRED WITH <br />GEL -FILLED WIRE NUTS TO ASSURE CONTINUITY. <br />CVIN, LLC <br />SAN JOAQUIN COUNTY PERMIT PLANS <br />INSTALLATION OF FIBER OPTIC FACILITIES <br />RIPON FIRE DISTRICT <br />18800 MURPHY RD., RIPON, CA <br />THE PERMITTEE IS RESPONSIBLE FOR THE PRESERVATION OF SURVEY MONUMENTS LOCATED WITHIN THE AREA OF WORK <br />HEREIN PERMITTED. PRIOR TO THE START OF CONSTRUCTION, SURVEY MONUMENTS THAT POTENTIALLY MAT BE DISTURBED <br />SHALL BE LOCATED AND REFERENCED BY A LICENSED LAND SURVERYOR, AND A CORNER RECORD FILED WITH THE <br />COUNTY SURVEYOR. ANY SURVEY MONUMENTS DISTURBED DURING THE CONSTRUCTION SHALL BE REESTABLISHED BY A <br />LICENSED LAND SURVEYOR AND ANOTHER CORNER RECORD FILED WITH THE COUNTY SURVEYOR. <br />(LAND SURVEYORS ACT SECTION 8771) <br />INlil <br />SHEET 1 <br />TITLE SHEET <br />SHEET 2 <br />HANDHOLE AND CONDUIT DETAILS <br />SHEET 3 <br />TYPICAL DETAILS <br />SHEET 4 <br />TYPICAL TRAFFIC CONTROL PLANS <br />SHEET 5-6 <br />PERMIT PLANS <br />°nb <br />o <br />Wagner <br />'E° <br />Alba <br />.1—Rd <br />EeslRHorRd <br />A <br />v <br />AD, Por fRa <br />ipon <br />Ladtl Rd <br />Latltl Rtl <br />JOB SITE <br />VICINITY MAP <br />THE PERMITTEE IS RESPONSIBLE FOR THE PRESERVATION OF SURVEY MONUMENTS LOCATED WITHIN THE AREA OF WORK <br />HEREIN PERMITTED. PRIOR TO THE START OF CONSTRUCTION, SURVEY MONUMENTS THAT POTENTIALLY MAT BE DISTURBED <br />SHALL BE LOCATED AND REFERENCED BY A LICENSED LAND SURVERYOR, AND A CORNER RECORD FILED WITH THE <br />COUNTY SURVEYOR. ANY SURVEY MONUMENTS DISTURBED DURING THE CONSTRUCTION SHALL BE REESTABLISHED BY A <br />LICENSED LAND SURVEYOR AND ANOTHER CORNER RECORD FILED WITH THE COUNTY SURVEYOR. <br />(LAND SURVEYORS ACT SECTION 8771) <br />INlil <br />SHEET 1 <br />TITLE SHEET <br />SHEET 2 <br />HANDHOLE AND CONDUIT DETAILS <br />SHEET 3 <br />TYPICAL DETAILS <br />SHEET 4 <br />TYPICAL TRAFFIC CONTROL PLANS <br />SHEET 5-6 <br />PERMIT PLANS <br />CONTRACTOR NOTICE: <br />THE EXISTENCE AND LOCATION OF ANY UNDERGROUND UTILITY PIPES OR <br />STRUCTURES SHOWN ON THESE PIANS WERE OBTAINED BY FIELD INSPECTION AND A SEARCH OF THE <br />AVAILABLE CITY OR COUNTY RECORDS. SINCE THE ACTUAL LOCATION AND NATURE OF THE UNDERGROUND <br />FACILITIES MAY BE SOMEWHAT DIFFERENT FROM THAT SHOWN, THE CONTRACTOR IS REQUIRED TO VERIFY <br />THE INFORMATION THROUGH UNDERGROUND SERVICE ALERT (USA) OR BY CONTACTING THE UTILITY <br />COMPANIES DIRECTLY, PRIOR TO EXCAVATION. <br />CVIN GENERAL CONSTRUCTION NOTES: <br />1. ALL CONDUITS, HANDHOLE/VAULTS AND WARNING SIGNS SHALL BE SUPPLIED BY CVIN. ALL OTHER <br />MATERIALS INCLUDING CASING, RISERS, ENTRANCE PIPE AND INSIDE RACEWAY SHALL BE SUPPLIED BY <br />THE CONTRACTOR. <br />2, ALL CVIN SUPPLIED MATERIAL TO BE PICKED UP BY CONTRACTOR AT CVIN STORAGE YARD AT <br />1742 W. PINE FRESNO CA 93728, CONTRACTOR TO RETURN ALL EXTRA OR UNUSED MATERIALS <br />TO CVIN YARD UPON COMPLETION OF THE PROJECT. <br />3. MATERIAL TO BE INSPECTED BY CONTRACTOR AND CVIN REPRESENTATIVE TO ENSURE QUALITY OF <br />MATERIALS. <br />4, CONTRACTOR TO WALK PROJECT AND CONFIRM TRENCH LOCATIONS, BORE LOCATIONS AND <br />HANDHOLE/MANHOLE LOCATIONS PRIOR TO THE START OF CONSTRUCTION. CONFIRM ANY PROPOSED <br />CHANGES IN WRITING WITH CVIN REPRESENTATIVE. <br />5, CONTRACTOR TO INSTALL PER CVIN SPECIFICATIONS AND DETAILS ATTACHED. <br />6. CVIN REPRESENTATIVE TO BE PRESENT TO INSPECT WORK PERFORMED FOR CVIN AT CALTRANS AND <br />RAILROAD CROSSINGS. <br />7. UPON COMPLETION OF CONSTRUCTION, CONTRACTOR TO CLEAN AND PROOF ALL DUCTS TO ENSURE <br />PROPER INSTALLATION. <br />8, CONTRACTOR SHALL COUPLE TOGETHER 1.25" SILICORE AND ALL FOUR FUTURE PATH MICRODUCTS <br />PLACED USING SUPPLIED CONDUIT COUPLERS. TRACER WIRE SHALL BE SPLICED TOGETHER WITH GEL <br />FILLED WIRE NUT CONNECTORS. SEE HANDHOLE INSTALLATION DETAIL. IN THE EVENT THAT THE <br />CONDUITS ARE NOT READY TO BE COUPLED TOGETHER, THE CONDUIT ENDS SHALL BE TEMPORARILY <br />CAPPED UNTIL SUCH TIME WHEN CONDUITS ARE READY TO BE COUPLED TOGETHER. <br />9, CONTRACTOR SHALL SUPPLY AND INSTALL (1) 16AWG SOLID COPPER TRACER WIRE (RED INSULATION) <br />WITH 1.25' CONDUIT (IF NOT INCLUDED WITH FUTURE PATH CONDUT). SPLICE AS REQUIRED WITH <br />GEL -FILLED WIRE NUTS TO ASSURE CONTINUITY. <br />10, CONTRACTOR SHALL SUPPLY AND INSTALL TRACEABLE MULE TAPE IN 1.25'0 HOPE DUCT CONTINUOUS <br />FROM FROM BEGINNING TO END. PROVIDE 30' SLACK AT BEGINNING AND END HANDHOLES. <br />11. WARNING SIGNS AND DECALS SHALL BE SUPPLIED BY OWNER. CONTRACTOR SHALL NOTIFY OWNER OF <br />ALL MID -SPAN CONDUIT SPLICES AS THAT QUANTITY IS NOT ACCOUNTED FOR IN THE BID UNIT <br />QUANTITY SUMMARY. <br />12, CONTRACTOR SHALL POST FIBER WARNING SIGNS, EVERY 22640ft IN RURAL AREAS AND 31320ft IN <br />URBAN AREAS, AT EVERY HANDHOLE, BOTH SIDES OF ROAD CROSSING AND CHANGES IN DIRECTION, <br />CONDUIT SPLICE LOCATED BETWEEN HANDHOLES (EXCEPT IN SIDEWALKS OR OTHER IMPRACTICAL <br />URBAN AREAS). MARKERS SHALL BE PLACED IN AS CLOSE PROXIMITY AS POSSIBLE TO PERMANENT <br />OBJECTS TO PROVIDE PROTECTION, WITHOUT OBSCURING THE MARKER FROM VIEW. MARKERS SHALL <br />BE ORIENTATED AND PLACED FOR MAXIMUM VISIBILITY. IN RURAL AREAS THE DECAL SHALL FACE <br />ONCOMING TRAFFIC TO BE VISIBLE TO A DRIVER. <br />13. CONTRACTOR SHALL PROVIDE COMPLETE AS -BUILT PIANS TO IDENTIFY RUNNING LINE LOCATION. <br />PROVIDE GPS COORDINATES IN NAD -83 FORMAT, WITH SUB -METER ACCURACY (N000.00000000, <br />WOGO.00000000) FOR ALL CONDUIT SPLICE POINTS, HANDHOLES, CHANGES IN DIRECTION AND ROAD <br />CROSSING LOCATIONS, PER CVIN SPECIFICATIONS. <br />14. CONTRACTOR SHALL PROVIDE CERTIFICATION LETTER STATING THAT ALL CONDUITS AND HANDHOLES <br />HAVE BEEN INSTALLED, CLEANED AND TESTED PER CVIN SPECIFICATIONS. <br />15, CONTRACTOR SHALL PROVIDE CERTIFICATION LETTER STATING THAT TRACER WIRE HAS BEEN INSTALLED <br />PER CVIN SPECIFICATIONS AND TESTED TO CONFIRM CONTINUITY FROM BEGINNING TO END. <br />