My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2023_PS-2303001 thru PS-2303500_ - PS-2303091
PublicWorks
>
- PUBLIC SERVICES
>
PERMITS & DEVELOPMENT
>
Encroachment(EP)/Driveway(DW) Permits
>
2023
>
PS-2303001 thru PS-2303500
>
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2023_PS-2303001 thru PS-2303500_ - PS-2303091
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/19/2023 1:23:35 PM
Creation date
12/19/2023 1:20:59 PM
Metadata
Fields
Template:
Permits_Development
DocName
PS-2303091
Category07
Encroachment(EP)/Driveway(DW) Permits
Year2
2023
Notes2
E/S of Murphy Rd. S/O HWY 120
Address
7447 N. Palm Bluffs Ave., STE. 105
Application
CVIN, LLC
Type
Bore Pits, Bores
Supplemental fields
Cross Ref
PWP7110005
Type (2)
Encroachment Permit (EP)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
E <br />OUTSIDE DIAMETER: <br />1.660}0.005in <br />MINIMUM WALL: <br />0.151in <br />MAXIMUM WALL: <br />0.171in <br />INSIDE DIAMETER: <br />1.283in (min.) <br />SAFE WORKING <br />BLENDED WITH UV STABLE PLASTIC TO <br />PULL STRENGTH: <br />1,989lbs <br />WEIGHT: <br />0.319lb/ft (avg.) <br />BEND RADIUS: <br />17in <br />ORALITY: <br /><5% <br />BRITTLENESS TEMP.: —75'C <br />HIGH TENSILE PIN SDR -11 <br />HDPE HDPE CONDUIT <br />SILICORE <br />LINING <br />' WALLS ARE ASTM SPECIFICATIONS. OTHER DATA <br />MODIFIED TO INCLUDE RIBS. <br />72" <br />1.25"0 HDPE DUCT <br />NTS <br />1-1/4in HDPE DUCT <br />SEE DETAIL <br />OUTSIDE DIA: 4.500in <br />INSIDE DIA: 3.9981n <br />WEIGHT (AVG): 2.188 LB/FT <br />BEND RAD: 50in <br />SAFE WORKING <br />PULL STRENGTH: 8,700 LBS <br />WARNING SIGN — RHINO 3 RAIL <br />FIBER OPTIC CABLE MARKER <br />NTS <br />22 A•„� <br />ENCASEMENT DETAIL <br />NTS <br />4—WAY FUTURE PATH DUCT <br />SYSTEM DETAIL <br />NTS <br />AVG. WALL <br />0.251 In <br />1.347in HDPE DUCT, <br />SEE '4—WAY FUTURE <br />PATH DUCT SYSTEM' <br />DETAIL <br />16 AWG SOLID INSULATED <br />TRACER WIRE <br />(IF NOT PRESENT IN <br />FUTURE PATH CONDUIT) <br />4 MIRO—DUCTS <br />12.7/10mm <br />RODENT BARRIER TO <br />BE 6” LARGER THAN <br />OUTSIDE DIMENSIONS <br />OF HANDHOLE <br />1.25" SILICORE AND ALL FOUR FUTURE <br />PATH MICRODUCTS SHALL BE SPLICED <br />TOGETHER THROUGH THE HANDHOLE. <br />IN THE EVENT THAT THE CONDUITS ARE <br />NOT READY TO BE SPLICED TOGETHER, <br />THE CONDUIT ENDS SHALL BE CAPPED. <br />TRACE WIRE SHALL BE <br />SPLICED TOGETHER WITH WIRE <br />NUT CONNECTORS <br />SURFACE GRADE <br />CORE 2"0 HOLE THROUGH WALL <br />OF HANDHOLE. <br />CENTER CONDUITS AND SEAL WITH <br />URETHANE FOAM OR FLEX SEALANT. <br />.5"x.5"x18GA GALVANIZED <br />WWM RODENT BARRIER <br />PLACED ON TOP OF GRAVEL <br />6" WASHED <br />GRAVEL <br />NOTES: <br />4.. <br />COMPACTED TO 95%. COMPACTED MATERIAL <br />ENO VIEW <br />1. THE RHINO HYBRID 3—RAIL SPECIALLY <br />Material Requirements <br />DESIGNED REINFORCING FIBERS ARE <br />FSURFACE GRADE <br />BLENDED WITH UV STABLE PLASTIC TO <br />Requirements <br />CREATE A FLAT POST WITH THE BRIGHT <br />V Q <br />COLOR OF PLASTIC AND THE IMPACT <br />>0.940-0.947 <br />RESISTANCE OF THE COMBINED <br />R T <br />FIBERGLASS AND PLASTIC. IT'S DESIGN <br />• <br />ALLOWS THE POST TO BEND OVER WHEN <br />Flexural Madulus <br />HIT, THEN SNAP BACK INTO IT'S NORMAL <br />EI <br />UPRIGHT POSITION. <br />D`` <br />3000—<3500 psi <br />C2. <br />F <br />CONTRACTOR IS RESPONSIBLE FOR <br />A <br />POSTING OF THESE RHINO FIBER 3—RAIL <br />I <br />WARNING N U <br />BB <br />INSTALLATIONSIGNS, <br />STANDARDS, EVERY }2640 <br />ASTM D 2837 <br />FEET (1/2—MILE) IN RURAL AREAS AND IN <br />E E <br />THE URBAN AREAS EVERY ±1320 FEET <br />® R <br />(1/4—MILE), AND AT EVERY HANDHOLE <br />Elangotion <br />AND ANY CONDUIT SPLICE LOCATED <br />BEFORE DIGGING CAO <br />BETWEEN HANDHOLES (EXCEPT IN <br />CYIN <br />SIDEWALKS OR OTHER IMPRACTICAL URBAN <br />855-442-6010 <br />AREAS), TO ENSURE THE FIBER AND <br />-,-. <br />STRUCTURE CAN BE LOCATED AND 15 NOT <br />ASTM D 3350 <br />DAMAGED IN THE FUTURE. <br />3. WARNING SIGNS AND DECALS SHALL BE <br />SUPPLIED BY OWNER. CONTRACTOR SHALL <br />NOTIFY OWNER OF ALL MID—SPAN <br />CONDUIT SPLICES AS THAT QUANTITY IS <br />NOT ACCOUNTED FOR IN THE BID UNIT <br />QUANTITY SUMMARY. <br />4. WARNING SIGNS WILL NOT REQUIRE METAL <br />ANCHORS & SHALL BE PLACED AT A MIN. <br />DEPTH OF 18 INCHES BUT NOT TO <br />EXCEED 24 INCHES. <br />WARNING SIGN — RHINO 3 RAIL <br />FIBER OPTIC CABLE MARKER <br />NTS <br />22 A•„� <br />ENCASEMENT DETAIL <br />NTS <br />4—WAY FUTURE PATH DUCT <br />SYSTEM DETAIL <br />NTS <br />AVG. WALL <br />0.251 In <br />1.347in HDPE DUCT, <br />SEE '4—WAY FUTURE <br />PATH DUCT SYSTEM' <br />DETAIL <br />16 AWG SOLID INSULATED <br />TRACER WIRE <br />(IF NOT PRESENT IN <br />FUTURE PATH CONDUIT) <br />4 MIRO—DUCTS <br />12.7/10mm <br />RODENT BARRIER TO <br />BE 6” LARGER THAN <br />OUTSIDE DIMENSIONS <br />OF HANDHOLE <br />1.25" SILICORE AND ALL FOUR FUTURE <br />PATH MICRODUCTS SHALL BE SPLICED <br />TOGETHER THROUGH THE HANDHOLE. <br />IN THE EVENT THAT THE CONDUITS ARE <br />NOT READY TO BE SPLICED TOGETHER, <br />THE CONDUIT ENDS SHALL BE CAPPED. <br />TRACE WIRE SHALL BE <br />SPLICED TOGETHER WITH WIRE <br />NUT CONNECTORS <br />SURFACE GRADE <br />CORE 2"0 HOLE THROUGH WALL <br />OF HANDHOLE. <br />CENTER CONDUITS AND SEAL WITH <br />URETHANE FOAM OR FLEX SEALANT. <br />.5"x.5"x18GA GALVANIZED <br />WWM RODENT BARRIER <br />PLACED ON TOP OF GRAVEL <br />6" WASHED <br />GRAVEL <br />EXCAVATION APPROXIMATELY <br />6" DEEPER THAN OVER ALL <br />HEIGHT OF ENCLOSURE <br />WARNING MARKER DETAIL <br />OVERSHEATH SPACING: <br />0.070" ±0.010" RURAL: MARKERS AT 1/2 MILE INTERVALS <br />OVER DUCTS <br />URBAN: MARKERS AT 1/4 MILE INTERVALS <br />(WHERE APPROPRIATE) <br />MATERIALS: <br />1.1 FERMA—GUARD CONDUIT SHALL BE MADE FROM HIGH—DENSITY POLYETHYLENE (HDPE). <br />THE HDPE SHALL MEET OR EXCEED THE PROPERTIES LISTED IN ASTM D-3350 FOR <br />MINIMUM CELL CLASSIFICATION OF 335480 C (MINIMUM 2% CARBON BLACK) OR E <br />(COLOR WITH UV STABILIZER). PROPERTIES ARE LISTED BELOW IN TABLE 1.1 <br />BACKFILL AROUND THE HANDHOLE SHALL BE <br />TABLE 1-1 <br />COMPACTED TO 95%. COMPACTED MATERIAL <br />DESIGN LOAD: <br />SHALL BE LEVELED SO THE TOP OF HANDHOLE <br />Material Requirements <br />IS 1"-2" ABOVE THE SURROUNDING GRADE, <br />FSURFACE GRADE <br />WITH POSITIVE DRAINAGE AWAY FROM HANDHOLE <br />EXCAVATION APPROXIMATELY <br />6" DEEPER THAN OVER ALL <br />HEIGHT OF ENCLOSURE <br />WARNING MARKER DETAIL <br />OVERSHEATH SPACING: <br />0.070" ±0.010" RURAL: MARKERS AT 1/2 MILE INTERVALS <br />OVER DUCTS <br />URBAN: MARKERS AT 1/4 MILE INTERVALS <br />(WHERE APPROPRIATE) <br />MATERIALS: <br />1.1 FERMA—GUARD CONDUIT SHALL BE MADE FROM HIGH—DENSITY POLYETHYLENE (HDPE). <br />THE HDPE SHALL MEET OR EXCEED THE PROPERTIES LISTED IN ASTM D-3350 FOR <br />MINIMUM CELL CLASSIFICATION OF 335480 C (MINIMUM 2% CARBON BLACK) OR E <br />(COLOR WITH UV STABILIZER). PROPERTIES ARE LISTED BELOW IN TABLE 1.1 <br />CONDUIT DATA <br />HANDHOLE INSTALLATION DETAIL <br />NTS <br />CVIN STANDARD HANDHOLE <br />GRADE LEVEL BOX BULK 4 <br />ANSI/SCTE 77 TIER 22 <br />HEAVY DUTY, NON—DELIBERATE TRAFFIC, <br />LIMITED TO CLASS 7 (2-1/2 TON TRUCK). <br />GENERALLY, IN A SIDEWALK BUT NOT AT A <br />CORNER OR DRIVEWAY. <br />GVW: <br />40,0OOIbs <br />TABLE 1-1 <br />16,0001bs <br />DESIGN LOAD: <br />15,000lbs <br />Material Requirements <br />22,500lbs <br />Cell <br />Properties <br />Requirements <br />Test Method <br />3 <br />Density <br />>0.940-0.947 <br />ASTM D 792 or 1505 <br />3 <br />Melt Flow Index (190/2.160) <br /><0.4-0.15g/10 minutes max ASTM D 1238 <br />5 <br />Flexural Madulus <br />110,000 to 160,000 psi <br />ASTM D 790 <br />4 <br />Tensile Strength at Yield <br />3000—<3500 psi <br />ASTM D 638 <br />8 <br />Environmental Stress Crack <br />Resistance <br />Condition B, F Max, 10% <br />Igepal, 96hrs, minimum <br />ASTM D 1693 <br />0 <br />Hydrostatic Design Basis <br />Not Pressure Rated <br />ASTM D 2837 <br />-- <br />Brittleness Temperature <br />—75- C <br />ASTM D 746 <br />-- <br />Elangotion <br />400% minimum <br />ASTM D 638 <br />C <br />Class C <br />Minimum 2% Carbon Black <br />ASTM D 3350 <br />E <br />Class E <br />Colored with UV Stablizer <br />ASTM D 3350 <br />CONDUIT DATA <br />HANDHOLE INSTALLATION DETAIL <br />NTS <br />CVIN STANDARD HANDHOLE <br />GRADE LEVEL BOX BULK 4 <br />ANSI/SCTE 77 TIER 22 <br />HEAVY DUTY, NON—DELIBERATE TRAFFIC, <br />LIMITED TO CLASS 7 (2-1/2 TON TRUCK). <br />GENERALLY, IN A SIDEWALK BUT NOT AT A <br />CORNER OR DRIVEWAY. <br />GVW: <br />40,0OOIbs <br />MAX WHEEL LOAD: <br />16,0001bs <br />DESIGN LOAD: <br />15,000lbs <br />TEST LOAD: <br />22,500lbs <br />COMPOSITE MATERIAL LID <br />MIN. LOAD: 18,OOOlbs <br />MAX. LOAD: 33,750lbs <br />3" <br />OPEN BOTTOM <br />24x36x30 HANDHOLE <br />RODENT <br />BARRIER <br />NOTE: <br />INSTALL TRACEABLE MULE TAPE IN <br />1.25"0 HDPE DUCT CONTINUOUS <br />FROM FROM BEGINNING TO END. <br />PROVIDE 30' SLACK AT BEGINNING <br />AND END HANOHOLES. <br />DEPTH OF CONDUIT <br />AS NOTED ON PLANS <br />NTS <br />
The URL can be used to link to this page
Your browser does not support the video tag.