GENERAL NOTES (Continued) <br />8. Asphalt Concrete (Miscellaneous Areas) shall be placed in two layers. See <br />Sheet No. 9 for Asphalt Concrete (Miscellaneous Areas) Detail. The cost of <br />placing Asphalt Concrete (Miscellaneous Areas) is to be included in the Minor <br />Concrete (Curb, Gutter and Sidewalk) item of work. <br />9. Minor Concrete Work (Curb, Gutter and Sidewalk) that is to be removed shall be <br />saw cut to the limits shown on the plans. The cost of the saw cutting, including <br />into driveways where sidewalk width requires widening, shall be considered as <br />included in the various contract items of work and no additional compensation will <br />be allowed therefor. <br />10. Contractor shall place detectable warning surfaces at locations within the project <br />limits where Curb Ramps exist without detectable warning surfaces. The cost for this <br />item is to be included in the Retrofit Curb Ramp Detectable Warning Surface item of <br />work. <br />11. Part Circle Culverts and Steel Plating at driveways are to remain in place <br />unless otherwise directed by the Engineer. Steel Plating at driveways are to be <br />removed prior to planing and reinstalled after paving completion. The cost of <br />removing and reinstalling Steel Plating shall be considered as included in the <br />voric ,� Mems of work and no additional : i.,pensation will be allowed theref( <br />12. At Curb, Gutter and Sidewalk replacement locations 15 LF or less, match existing <br />Curb, Gutter and Sidewalk cross sections. At locations longer than 15 LF, match <br />existing Sidewalk width (unless otherwise noted on the plans) and use current Curb <br />and Gutter standard with 3' transitions on each end. <br />13. The Contractor shall be responsible for adequately scheduling Inspection and <br />Quality Assurance Testing of all facilities constructed under this contract. All testing <br />shall conform to the Standard Specifications. All re—testing shall be paid by the <br />Contractor. <br />COUNTY OF SAN JOAQUIN <br />DRAWN BY DATE PROJECT ENGINEER DATE CHECKED <br />'Felipe Rodriguez 08/08 • - \ .� � 4(2� <br />R WING <br />Corrections <br />No C h r <br />A <br />Al. <br />NO SCALE GENERAL CALHOUN WAY, CLARKSBURG PLACE, AND PORTER WAY RESURFACING <br />NOTES <br />DATE APPROVAL RECOMMENDED DATE <br />�''�:� 9�ia�►ulG`.,,r°" 4 3009 <br />Sheet No. <br />3 of 11 <br />