My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
San Joaquin General Hospital Replacement Project Phase 1A
PublicWorks
>
VAULT MAPS
>
References
>
San Joaquin General Hospital Replacement Project Phase 1A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/28/2025 3:38:50 PM
Creation date
4/19/2024 9:46:32 AM
Metadata
Fields
Template:
Reference
Ref Doc Name
San Joaquin General Hospital Replacement Project Phase 1A
Non-Public Works
Yes
Division Submitted By
Utilities
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
95
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
0 <br />0 <br />14'x 19" RECTANGULAR <br />12" TYPICAL <br />EDGE OF LAWN, WALK, FENCE, CURB, ETC..—/ <br />TOP VIEW <br />1. CENTER VALVE BOX OVER REMOTE CONTROL VALVE TO FACILITATE SERVICING VALVE. <br />2. SET BOXES 1' ABOVE FINISH GRADE OR MULCH COVER IN GROUND COVER/SHRUB AREA <br />AND FLUSH WITH FINISH GRADE IN TURF AREA. <br />3. SET RCV AND VALVE BOX ASSEMBLY IN GROUND COVER/SHRUB AREA WHERE POSSIBLE. <br />INSTALL IN LAWN ONLY IF GROUND COVER DOES NOT EXIST ADJACENT TO LAWN. <br />4. SET BOXES PARALLEL TO EACH OTHER AND PERPENDICULAR TO EDGE OF LAWN, WALK, <br />FENCE, CURB, ETC. <br />5. AVOID HEAVILY COMPACTING SOIL AROUND VALVE BOXES TO PREVENT COLLAPSE AND <br />DEFORMATION OF VALVE BOX SIDES. <br />6. INSTALL EXTENSION BY VALVE BOX MANUFACTURER AS REQUIRED TO COMPLETELY <br />ENCLOSE ASSEMBLY FOR EASY ACCESS. <br />,4„ VALVE BOX INSTALLATION 1 <br />-1 <br />12" POP-UP SHRUB <br />ROTARY SPRINKLER <br />FINISH GRADE 4" K :WALL, WA <br />URB OR <br />REFER TO IRRIGATION BUILDING <br />LEGEND <br />PVC LATERAL LINE <br />UPC APPROVED SCHEDULE <br />40 PVC TEE OR ELBOW <br />MARLEX 900 STREET <br />3/4" SCHEDULE 40 PVC — ELL (2 TOTAL) <br />STREET ELL <br />3/4" KING BROS. FLEX RISER <br />MODEL FR -750-6 OR EQUAL <br />12" POP-UP SPRINKLER <br />51 RISER DETAIL 12 <br />CAP PERFORATED PIPE. DO NOT <br />GLUE TO ENABLE ACCESS TO BUBBLER <br />WRAP TOP 6" OF PERFORATED PIPE <br />WITH FILTER X MATERIAL TO PREVENT <br />DEBRIS FROM CLOGGING BUBBLER —i <br />12" <br />PVC LATERAL LINE <br />4'X 36" PERFORATED DRAIN <br />PIPE. LOCATE AbJACENT TO <br />ROOTBALL FILL TO 2' BELOW <br />BUBBLER WITH 3/4" DRAIN ROCK <br />0 <br />BUBBLER - INSTALL 1" BELOW CAP <br />FINISH GRADE <br />SCH. 80 PVC THREADED COUPLING OR <br />CHECK VALVE (WHERE APPROPRIATE) <br />12' SCH. 80 PVC NIPPLE <br />LENGTH AS REQUIRED <br />ROOTBALL <br />TREE BUBBLER DETAIL <br />irrigation cmsurtant: <br />Russell D. Mitchell & Associates, Inc. -� <br />2760 Camino biablb <br />Walnut Creek, CA 94596 <br />(510) 939-3985 <br />(510) 932-5671 FAX <br />NOTE: <br />1. SET SPRINKLER 2" ABOVE FINISH GRADE AT TIME OF <br />INSTALLATION - LOWER TO FINISH GRADE WHEN TURF <br />IS WELL ESTABLISHED. <br />2. SET SPRINKLER 6" FROM CURB WHEN ADJACENT TO PARKING <br />STALLS. <br />3. NIPPLES AND FITTINGS TO BE SAME IPT SIZE AS ROTARY <br />SPRINKLER IPT INLET THREAD SIZE. ' <br />WALL, WALK, CURB POP-UP ROTARY <br />OR BUILDING SPRINKLER <br />FINISH GRADE <br />uu= <br />REFER TO IRRIGATION _ SCHEDULE 80 PVC THREADED <br />LE END NIPPLE (LENGTH AS REQUIRED) <br />10"LONG SCHEDULE 80 PVC <br />THREADED NIPPLE <br />SIDE VIEW UPC APPROVED SCHEDULE <br />PVC LATERAL LINE 40 PVC TEE OR ELBOW <br />3" LONG SCHEDULE 80 _ <br />PVC THREADED NIPPLE <br />FINISH GRADE <br />POP-UP LAWN SPRAY <br />SPRINKLER <br />1 1/2" <br />go <br />•:' .- o' <br />WALL, WALK, CURB IIII IIII <br />OR BUILDING <br />REFER TO LJ <br />IRRIGATION <br />LEGEND <br />r- SCHEDULE 80 PVC <br />THREADED 900 ELL <br />IOP VIEW <br />1 1/2" <br />�� = I►I II`� I I I �I I,lI <br />L <br />POP-UP SHRUB SPRAY <br />SPRINKLER <br />ELL <br />rvr-Ur %2r <br />RISER DET <br />1/2" SCHEDULE 80 PVC <br />THREADED NIPPLE <br />(LENGTH AS REQUIRED - <br />TYPICAL) <br />1/2" SCHEDULE 40 PVC ' <br />THREADED 900 ELL <br />Stone <br />Marraccini <br />Patterson <br />Architecture <br />Planning <br />Interior Architecture <br />One Market Plaza <br />Spear Street Tower <br />Suite 400 <br />San Francisco <br />CA 94105 <br />415 227-0100 <br />Architect,AIA <br />Tech. Checked Tech. <br />Coord. Arch. <br />RUTHERFORD & CHEKENE <br />303 Second St. Suite 800 N. <br />San Francisco, CA 94107 <br />Structural Engineer <br />GUTMANN & MacRITCHIE <br />1300 Sutter Street <br />San Francisco, CA 94109 <br />Mechanical Engineer <br />THE ENGINEERING' ENTERPRISE <br />1305 Marina Vllloge Parkway <br />Alameda, CA 94501 <br />Electrical Engineer <br />MPA DESIGN <br />562 Mission Street <br />San Francisco, CA 94105 <br />Landscape Architect <br />Approvals <br />Revisions <br />Date <br />1/2" KING BROS. FLEX 901ic REV1FW <br />RISER MODEL FR -500-6 <br />OR EQUAL <br />.g <br />r � <br />E s <br />CONCRETE THRUST BLOCK <br />(TYPICAL)-7� <br />J2 <br />,M <br />INSTALL MAIN LINE AS PER MANUFACTURER'S <br />INSTALLATION GUIDE. SIZE OF CONCRETE THRUST <br />BLOCKS SHALL BE PER PIPE MANUFACTURER'S <br />INSTALLATION GUIDE. <br />3 TYPICAL THRUST BLOCK DETAIL <br />SAN JOAQUIN <br />GENERAL HOSPITAL <br />REPLACEMENT PROJECT, <br />PHASE 1A <br />IRRIGATION DETAILS <br />Scale: NONE <br />Project No. <br />53000.09 <br />Date <br />a, <br />r�l <br />Drawing No. <br />L4. 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.