My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SP7775 - SP7782
PublicWorks
>
VAULT MAPS
>
Small Plans - SP
>
SP7508 -
>
SP7775 - SP7782
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/23/2025 3:44:05 PM
Creation date
5/14/2024 10:27:09 AM
Metadata
Fields
Template:
Small Plans - SP
Project
Morada Area Streets Resurfacing 2024
Limits
Broughton Drive: Springfield Way to Madeline Drive; Camden Court: West End to Springfield Way; Hickory Avenue: Morada Lane to Northeast End; Madeline Lane: Morada Lane to Broughton Drive; West End to Plum Avenue; Springfield Way: Broughton Drive to Ashley Lane Morada Lane: CCTC Railroad to Michelle Lane
Year
2023
Project Engineer
Ger Lee
Roads Worked
Broughton Dr., Camden Ct., Hickory Ave., Madeline Ln.
Springfield Wy., Morada Ln.
Red Lines
Yes
Project #
222313
Districts
District 4
Supplemental fields
Classification
Record Drawings
Cross Ref
SP7775 - SP7782
Type
Resurfacing
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
The URL can be used to link to this page
Your browser does not support the video tag.