Laserfiche WebLink
STANDARD EROSION CONTROL NOTES <br />i. WHEN RAINFALL AND RUNOFF OCCURS DAILY INSPECTIONS OF THE <br />EROSION AND SEDIMENT CONTROLS AND DISCHARGE OUTFALLS MUST BE <br />PROVIDED BY SOME ONE KNOWLEDGEABLE AND EXPERIENCED IN THE <br />PRINCIPLES, PRACTICES. INSTALLATION, AND MAINTENANCE OF EROSION <br />AND SEDIMENT CONTROLS WHO WORKS FOR THE PERMITTEE, <br />2. CONSTRUCTION ACTIVITIES MUST AVOID OR MINIMIZE EXCAVATION AND <br />CREATION OF BARE GROUND FROM OCTOBER 1 THROUGH MAY 31 EACH <br />YEAR, <br />3. DURING WET WEATHER PERIOD. TEMPORARY STABILIZATION OF THE SITE <br />MUST OCCUR AT THE END OF EACH WORK DAY, <br />4. SEDIMENT CONTROLS MUST BE INSTALLED AND MAINTAINED ON ALL <br />DOWN GRADIENT SIDES OF THE CONSTRUCTION SITE AT ALL TIMES <br />DURING CONSTRUCTION. THEY MUST REMAIN IN PLACE UNTIL PERMANENT <br />VEGETATION OR OTHER PERMANENT COVERING OF EXPOSED SOIL IS <br />ESTABLISHED. <br />5. ALL ACTIVE INLETS MUST HAVE SEDIMENT CONTROLS INSTALLED AND <br />MAINTAINED AT ALL TIMES DURING CONSTRUCTION, UNLESS OTHERWISE <br />APPROVED, A SURFACE MOUNTED AND ATTACHABLE, U -SHAPED FILTER <br />BAG IS REWIRED FOR ALL CURB INLET CATCH BASINS, <br />6. SIGNIFR?WT AMOUNTS OF SEDIMENT WHICH LEAVES THE SITE MUST BE <br />CLEANED UP WITHIN 24 HOURS AND PLACED BACK ON THE SITE AND <br />STABILIZED OR PROPERLY DISPOSED, THE CAUSE OF THE SEDIMENT <br />RELEASE MUST BE FOUND AND PREVENTED FROM CAUSING A <br />RECURRENCE OF THE DISCHARGE WITHIN 714E SAME 24 HOURS. <br />7. SEDIMENT MUST NOT BE INTENTIONALLY WASHED INTO STORM SEWERS, <br />DRAINAGE WAYS, OR WATER BODIES, <br />8. SEDIMENT MUST BE REMOVED FROM BEHIND ALL SEDIMENT CONTROL <br />MEASURES WHEN IT HAS REACHED A HEIGHT OF 1/3RD THE BARRIER <br />HEIGHT, AND PRIOR TO THE CONTROL MEASURES REMOVAL, <br />9. CLEANING OF ALL STRUCTURES WITH SUMPS MUST OCCUR WHEN THE <br />SEDIMENT RETENTION CAPACITY HAS BEEN REDUCED BY 513R AND AT <br />COMPLETION OF PROJECT. <br />10, ANY USE OF TOXIC OR OTHER HAZARDOUS MATERIALS MUST INCLUDE <br />PROPER STORAGE, APPLICATION, AND DISPOSAL. <br />11, THE PERMITTEE MUST PROPERLY MANAGE HAZARDOUS WASTES, USED <br />OILS, CONTAMINATED SOILS, CONCRETE WASTE, SANITARY WASTE, LIQUID <br />WASTE, OR OTHER TOXIC SUBSTANCES DISCOVERED OR GENERATED <br />DURING CONSTRUCTION. <br />12, THE APPLICATION RATE OF ANY FERTILIZERS USED TO REESTABLISH <br />VEGETATION MUST FOLLOW MANUFACTURERS RECOMMENDATIONS, <br />NUTRIENT RELEASES FROM FERTILIZERS TO SURFACE WATERS MUST BE <br />MINIMIZED. TIME RELEASE FERTILIZERS SHOULD BE USED AND CARE <br />TAKEN IN APPUCATION OF FERTILIZERS WITHIN ANY WATER WAY RIPARIAN <br />ZONE <br />13. OWNER OR DESIGNATED PERSON SHALL BE RESPONSIBLE FOR PROPER <br />INSTALLATION AND MAINTENANCE OF ALL EROSION AND SEDIMENT <br />CONTROL MEASURES, IN ACCORDANCE WITH CURRENT CITY, COUNTY AND <br />STATE STANDARDS, AND FEDERAL REGULATIONS, <br />14, PRIOR TO ANY LAND DISTURBING ACTIVITIES, THE BOUNDARIES OF THE <br />CLEARING LIMITS, SHOWN ON THIS PIAN SHALL BE CLEARLY DELINEATED <br />IN THE FIELD. UNLESS OTHERWISE APPROVED, NO DISTURBANCE IS <br />PERMITTED BEYOND THE CLEARING LIMITS. <br />15. PRIOR TO ANY LAND DISTURBING ACTIVITIES, THE BMPS THAT MUST BE <br />INSTALLED ARE PERIMETER SEDIMENT CONTROL, AND INLET PROTECTION, <br />THESE BMPS MUST BE MAINTAINED FOR THE DURATION OF THE <br />PROJECT. <br />16. IF VEGETATIVE SEED MIXES ARE SPECIFIED, SEEDING MUST TAKE PLACE <br />NO LATER THAN SEPTEMBER 1ST; THE TYPE AND PERCENTAGES OF <br />SEED IN THE MIX ARE AS IDENTIFIED ON THE PLANS OR AS SPECIFIED <br />BY THE DESIGN ENGINEER, <br />17. WATER -TIGHT TRUCKS MUST BE USED TO TRANSPORT SATURATED SOILS <br />FROM THE CONSTRUCTION SITE, AN APPROVED EQUIVALENT IS TO BRAIN <br />THE SOIL ON SITE AT A DESIGNATED LOCATION USING APPROPRIATE <br />BMPS; SOIL MUST BE DRAINED SUFFICIENTLY FOR MINIMAL. SPILLAGE. <br />IB. ALL PUMPING OF SEDIMENT LADEN WATER MUST BE DISCHARGED OVER <br />AN UNDISTURBED, PREFERABLY VEGETATED AREA, AND THROUGH A <br />SEDIMENT CONTROL BMP (LE. FILTER BAG). <br />19, THE ESC PLAN MUST BE KEPT ONSITE, ALL MEASURES SHOWN ON THE <br />PLAN MUST BE INSTALLED PROPERLY TO ENSURE THAT SEDIMENT LADEN <br />WATER DOES NOT ENTER A SURFACE WATER SYSTEM, ROADWAY, OR <br />OTHER PROPERTIES, <br />20. THE ESC MEASURES SHOWN ON THIS PLAN ARE THE MINIMUM <br />REQUIREMENTS FOR ANTICIPATED SITE CONDITIONS DURING THE <br />CONSTRUCTION PERIOD, THESE MEASURES SHALL BE UPGRADED AS <br />NEEDED TO MAINTAIN COMPLIANCE WITH ALL REGULATIONS, <br />21. WRITTEN ESC LOGS ARE SUGGESTED TO BE MAINTAINED ONSITE AND <br />AVAILABLE TO DISTRICT INSPECTORS UPON REQUEST, <br />22, IN AREAS SUBJECT TO WIND EROSION, APPROPRIATE BMPS MUST BE <br />USED WHICH MAY INCLUDE THE APPLICATION OF FINE WATER SPRAYING, <br />PLASTIC SHEETING, MULCHING, OR OTHER APPROVED MEASURES, <br />23. ALL EXPOSED SOILS MUST BE COVERED DURING WET WEATHER PERIOD, <br />BMP MAINTENANCE NOTES( <br />I. AREAS TO BE CLEARED, GRUBBED, AND E%POSED AT ONE RUE SHALL <br />BE KEPT TO THE SMALLEST AREA POSSIBLE. <br />2. TEMPORARY GROUND COVER SHALL BE PLANTED OR A FILL TACKIFIER <br />SPREAD OVER EXPOSED AREAS NOT BEING WORKED ON FOR 14 DAYS, <br />3. TEMPORARY EROSION CONTROLS SHOULD NOT BE REMOVED BEFORE <br />PERMANENT EROSION CONTROLS ARE IN-PLACE AND ESTABLISHED, <br />4. ALL MEASURES TO CONTROL EROSION AND OTHER POLLUTANTS SHALL <br />BE IN PLACE BEFORE ANY SAFETY MOVING OPERATIONS ARE INITIATED, <br />5. <br />T RES L BE ALL TEMPORARY EROSION CONTROL MEASURES SHALL CHECKED <br />AND UPDATED, AS NEEDED, AT THE END OF EACH WORK WEEK AND <br />IMMEDIATELY FOLLOWING EACH RAIN EVENT. <br />6. DEWATERING OF EXCAVATIONS MAY BE NECESSARY, CONTRACTOR SHALL <br />INCLUDE ALL PROVISIONS FOR DEWATERING OF EXCAVATIONS IN HIS <br />BID, <br />El <br />\ PIPE 1 <br />�l <br />FOR OTEC EXIST <br />UTILITIES <br />E-A <br />ARCO C -STORE AND FUEL CANOPY <br />3443 CHEROKEE ROA®, SAN JOAOUIN COUNTY CA <br />V -DITCH <br />i\ <br />1 <br />Z yii <br />111 O� <br />\I O <br />NOTES( \ EX. ST D N- <br />1. GEOTECHNICA` ENGINEER SHALL BE ON-SITE Y PIPE 7 RE <br />DURING ALL STRIPPING AND GRUBBING OPERA N$ <br />TO VERIFY CONDITION OF SUBGRADE AND REM ALi <br />OF ALL ORGANIC MATERIAL, STUMPS, ETC, <br />2. GEOTECHNICAL ENGINEER SHALL OBSERVE AND kitI <br />TEST FILL MATERIAL AS REQUIRED TO CERTIFY TH <br />COMPLETED FILLS.' <br />3. ALL STRIPPING AND OTHER DEBRIS SHALL BE \ 1 <br />DISPOSED OF OFF-SITE. %tit IF <br />TEMPORARY DUST CONTROL MEASUR SX <br />1. THE CONTRACTOR SHALL MAINTAIN A SUFFICIENT NUMBER F WAT (� <br />TRUCKS AT THE SHE AND THE GRADED OR GRUBBED SITE ITH WA <br />AS REWIRED TO CONTROL DUST, <br />2. THE CONTRACTOR SHALL CONDUCT HISOPERATIONS SO THATLL <br />EXCAVATION, EMBANKMENT, AND IMPORTED <br />KLRTED MATERIAL IS SPR( KLED <br />WITH WATER DURING HIS GRADING OPERATIONS, \ �`•:,,� <br />3. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL DUST CONTROL <br />DURING CONSTRUCTION AND SHALL FOLLOW THE CONSTRUCTION �'�• <br />METHODS ESTABLISHED BY SAN JOAQUIN COUNTY. <br />t <br />V <br />3 CONSTRUCTION <br />ENTRANCE <br />��PIPE <br />O O CLEARINo \ <br />4 \ <br />LIMITS <br />OOTECT POLE <br />4 STAGING D GUY <br />AREA /di <br />CATf, <br />i•.1 / }T / PROs <br />I <br />CANOPY PAD <br />SEDIMENT <br />POND <br />T BASIN <br />Are, cn <br />44 it* <br />(A7 <br />• <br />SIDEWALK) <br />EXISTNG <br />BUILDING <br />1 (i0 REMAIN) l�y�� / OF it/ <br />A �. I <br />P/1CCTION / <br />%, PRO CTE (STING <br />8144% 4 <br />B ® /000 ECTOOW�' / <br />Q/ <br />IF qr <br />0/ <br />APPROXIMATE `//'P <br />FXCAVAtK)N uyn5 `V <br />VI��t <br />BASIN,, <br />2 P ECTION0. 0 Y? , <br />o / 0 Ott <br />/ ; <br />oo <br />t Ottit v <br />do � <br />TESL LEGEND: <br />CATCH BASIN PROTECTION <br />• • • PERIMETER PROTECTION <br />CLEARING LIMITS <br />SAWCUT LINE <br />CONSTRUCTION FENCE <br />-�.•. �...- TEMPORARY V -DITCH <br />f- DRAINAGE FLOWPATH <br />DEMOLITION CALLOUTSL <br />OSAWCUT PAVEMENT IN SMOOTH, CONTINUOUS LINE AND REMOVE <br />EXISTING PAVEMENT AS NECESSARY' FOR NEW IMPROVEMENTS. <br />ODEMOLISH EXISTING ASPHALT AND CURB FOR NEW IMPROVEMENTS, <br />DISPOSE OF OFFSITE. <br />ODEMOLISH EXISTING SEPTIC SYSTEM (TANKS AND SEPTIC FIELD LINES), <br />DISPOSE OF OFFSITE. <br />OTEMPORARY CONSTRUCTION FENCE (6' HIGH CHAIN LINK), FIELD <br />VERIFY AND CONFIRM EXACT LOCATION WITH ARCHITECT/OWNER, <br />5 TEMPORARY SITE ACCESS CATE (6' HIGH CHAIN LINK WITH LOCKING <br />DEVICE). FIELD VERIFY AND CONFIRM EXACT LOCATION WITH <br />ARCHITECT/OWNER. <br />OEXISTING STORMWATER POND TO BE FILLED. COORDINATE EXCAVATION <br />UMITS AND DEPTH WITH GEOTECHNICAL ENGINEER. <br />O DEMOLISH EXISTING SIGN AND DISPOSE OF OFFSITE. <br />O DEMOLISH EXISTING FENCE AND DISPOSE OF OFFSITE <br />DEMOLISH EXISTING ;PQUEj <br />ENCLOSURE AND CONCRETE PAD, <br />S E F <br />10 REMOVE AHD PROTETING BOUARDS AND CONCRETE <br />WHEELSTOPS FROM . SEE SITE PIAN FOR RE -USE <br />11 DEMO EXISTING LOT AND UTILITY SERVICE. <br />12 REMOVE TREES) AND VEGETATION SOIRM OF NEW DRIVEWAY FOR <br />REWIRED SIGHT DISTANCE). <br />EROSION CONTROL CALLOUTS� <br />O CONTRACTOR TO INSTALL PERIMETER PROTECTION (TEMPORARY SILT <br />FENCE (MIRAFI 100X, OR EQUIVALENT), STRAW WADDLES OR <br />SWDBAGS AROUND PERIMETER OF SITE AS REQUIRED TO PREVENT <br />SILT -LADEN RUNOFF FROM LEAVING SITE, AND AS DIRECTED BY <br />COUNTY INSPECTOR <br />O CONTRACTOR TO INSTALL TEMPORARY CATCH BASIN PROTECTION AT <br />ALL LASTING AND PROPOSED CATCH BASINS AS REQUIRED TO <br />PREVENT SILT -LADEN WATER FROM ENTERING STORM DRAINAGE <br />SYSTEM, AND AS DIRECTED BY CITY INSPECTOR <br />O CONTRACTOR TO INSTALL TEMPORARY STABILIZED CONSTRUCTION <br />ENTRANCE. ADJUST AS NECESSARY WRING CONSTRUCTION. <br />Q CONSTRUCTION STAGING AREA. CONTRACTOR TO USE THIS AREA <br />FOR TEMPORARY STOCKPILE STORAGE AND CONCRETE WASHOUT. <br />ADJUST SIZE AND LOCATION OF AREA AS NEEDED DURING <br />CONSTRUCTION <br />O TEMPORARY V -DITCH. ADJUST AS NEEDED DURING CONSTRUCTION <br />TO CONTAIN CONSTRUCTION PHASE STORMWATER RUNOFF. SEE <br />DETAIL ON SHEET C3.1. <br />© TEMPORARY SEDIMENT POND TO CONTAIN CONSTRUCTION PHASE <br />STORMWATER RUNOFF, <br />0 IEMPoRARY STORM DRAIN PIPE TO CONNECT V -DITCH UNDER <br />CONSTRUCTION ENTRANCE, <br />CONSTRUCTION SEQUENCE <br />1. ATTEND PRECONSTRUCTION MEETING IMTH SAN JOAQUIN COUNTY. <br />2 FLAG QEARING LIMITS <br />3. INSTALL PERIMETER PROTECTION BMPS AS SHOWN ON PLANS <br />4. INSTAL(, STORM DRAIN INLET PROTECTION AS SHOWN ON PLANS <br />5. CLEAR AND GRUB SITE, COMPLETE DEMOLITION AND PERFORM ROUGH GRADING. <br />6 CONSTRUCT SITE IMPROVEMENTS. <br />7. REMOVE PERIMETER PROTECTION BMPS AND STORM DRAW INLET PROTECTION. <br />& CALL SAN JOADUIN COUNTY FOR FINAL INSPECTION, <br />KnowwhaCsbBIOW. <br />p CaII before you dig. <br />Dial 811 <br />THE CONTRACTOR SHAD 1A RESPONSIBLE FOR VERIFYING INE LOCATION, DIMENSION, AND DEPTH OF ALL <br />E%6TINC UTILITIES WHETHER SHOYW ON THESE PUNS OR NOT BY POTHOLING THE UTILITIES <br />AND <br />SIANVEYING 114E NORQONTAL AND VERTICAL LIOCATION PRIOR TO CONSiRUC1gN. THIS SWNl INCLUDE <br />kRIATIO <br />CALLING U1NIY LOGTE O 611 ANO THEN POTHOLING ALL OF THE EzSTING UTNTIFS Af LOCATIONS OF <br />NEW UTILITY CROSSINGS i0 PHYSICALLY VERFY WHETHER OR NOT CONFLICTS E%6T. LOGTIDNS OF SMD <br />UIIITIES AS SHOWN ON THESE PUNS ME BASED UPON INE UNVERIFIED PUBLIC INFORMATION ANO ARE <br />SUBJECT TO VNGINEE .IF CONFLICTS SHOULD OCCUR, THE CONTRACTOR SHALL NOTIFY SAACHAUSEN <br />CONSULTING ENGINEERS INC. TO RESOLVE ALL PROBLEMS PRIOR TO PROCEEDING WITH CON5TRUCTK)N, <br />�a <br />4JP�G, <br />n U <br />Z = <br />mG�r <br />/APC ENGINE <br />16215 72ND AVENUE SOUTH <br />KENT, WA 98032 <br />(425)251-6222 <br />(425)251-8782 FA% <br />CNL DICI[pAG. LIVID PLWXAIG, <br />SULYEYNO. DAWl1MR1PIAt SERMCES <br />n oArt A[vma ocscaena <br />I t -u -M PtaPr wE.sP <br />t F -x -Is Poen sae�mu. <br />NAL <br />ARCO INTI <br />AM/PM <br />FUEL CANOPY <br />WITH 8 MOD's <br />NWC CHEROKEE AOAD <br />NEWTON ROAD <br />SAN JOAOUIN COUNTY,CAIJF'OflN41 <br />FaauTv #Teo <br />oAn on Pe Awwz2 non <br />CON <br />nnc nna <br />DEMOLITION <br />AND EROSION <br />CONTROL PLAN <br />C3.0 <br />