SOIL EROSION CONTROL NOTES <br />ALL EROSION CONTROL DEVICES SHALL BE INSTALLED IN ACCORDANCE WITH ALL LOCAL, STATE, AND FEDERAL STANDARDS, A NOTICE <br />OF INTENT LETTER SHALL BE POSTED IN THE JOB TRAILER AT ALL TIMES, THIS SITE SHALL BE PROTECTED BY MEANS DESCRIBED <br />T UR 7H C ENGINEER IF THERE ARE ANY QUESTIONS REGARDING EROSION CONTROL MEASURES, E CIVIL NEE OF <br />IN THE ACCOMPANYING BE YCO PLANS. <br />RECORD MUST BE CONTACTED, <br />A COPY OF THIS SHEET AND THE EROSION CONTROL PLAN MUST BE KEPT ON-SITE THROUGH THE DURATION OF CONSTRUCTION <br />ACTMIY. ANY CHANGES MADE TO THIS PLAN MUST BE NOTED, DATED, AND NWALEO BY THE GENERAL CONTRACTOR, <br />I. GENERAL <br />THE INTENT OF THIS PUN IS TO CONTROL EROSION AND RESULTING SILT TRANSPORTATION OFF SITE, THE ITEMS INDICATED ARE <br />THE ENGINEER'S BEST ESTIMATE OF REQUIREMENTS: MORE CONTROL MAY BE NEEDED DEPENDING ON SITE CONDITIONS. SEASON, ETC. <br />CONTRACTOR SHALL INSTALL ADDITIONAL MEASURES AS NECESSARY TO COMPLY WITH THIS INTENT. <br />A BEST MANAGEMENT PRACTICES PUN, WITH ALL SEDIMENT AND EROSION CONTROL PLANS, SHALL BE KEPT ON-SITE WITH <br />COPIES OF ALL INSPECTION REPORTS. <br />B. EXISTING TOPOGRAPHY AND PROPOSED TOPOGRAPHY ARE SHOWN ON THE GRADING PUN. <br />C. SEDIMENT AND EROSION CONTROL MEASURES SHALL BE CONSTRUCTED PNOR TO MY LAND DISTURBING ACTIVITY TAKING <br />PLACE, <br />0. OTHER FEDERAL, LOCAL, OR STATE STATUTES OR REQUIREMENTS THAT WY AFFECT THE PERMIT REOUIREMENTS FOR THIS SITE: <br />1. NPDES CONSTRUCTION STORM WATER MANAGEMENT DISCHARGE CRITERION <br />2. UNITED STATES ARMY CORPS OF ENGINEERS <br />3. LOCAL SEDIMENT CONTROL ORDINANCES <br />4. HAZARDOUS WASTE CONCERNS <br />5. PROTECTED SPECIES, HISTORICAL PRESERVATION, ETC <br />E. MATERIAL NEEDS AFFECTING ENVIRONMENTAL ASPECTS OF THE SITE <br />1. HAUL -IN / HAUL -OFF <br />2. TOPSOIL SPOIL OR HAUL -IN <br />F. PLANNED POSES OF CONSTRUCTION. <br />1, FLAG ALL WORK LIMITS. <br />2, CALL THE USA UNDERGROUND SERVICE ALERT TO VERIFY LOCATION OF ANY EXISTING UTILITIES TWO (2) WORKING DAYS <br />PRIOR TO START OF CONSTRUCTION <br />3. NOTIFY SEDIMENT CONTROL INSPECTOR TWENTY-FOUR (24) HOURS PRIOR TO START OF CONSTRUCTION. <br />4, IDENTIFY AND PROTECT ALL EXISTING VEGETATION TO REMAIN, <br />S. PERFORM CLEARING AND GRADING REQUIRED FOR INSTALLATION OF PERIMETER CONTROLS, <br />6, INSTALL PERIMETER RUNOFF CONTROLS; NOTIFY SEDIMENT CONTROL INSPECTOR AND OBTAIN APPROVAL BEFORE <br />PROCEEDING FURTHER. <br />7, INSTALL STORM DRAINAGE PROTECTION, <br />B. CLEAR AND STABILIZE CONSTRUCTION ACCESS, <br />9. COMPLETE ALL REWIRED STOCKPILING, SITE CLEARING, AND GRADING. <br />10, APPLY TEMPORARY OR PERMANENT STABILIZATION MEASURES IMMEDIATELY ON ALL DISTURBED AREAS WHERE WORK <br />MAY BE DELAYED OR IS COMPLETE, DO NOT LEAVE LARGE AREAS UNPROTECTED FOR MORE THAN SEVEN (7) DAYS. <br />11.CONSTRUCT PARKING LOT BASE, BUILDING FOUNDATION, AND INSTALL SITE UTILITIES. <br />12.WEATHER-IN BUILDING. <br />13.COMPLETE PARKING LOT CONSTRUCTION, <br />14.COMPLETE FINAL GRADING, STABILIZATION, AND LANDSCAPING. <br />15.NOTIFY SEDIMENT CONTROL INSPECTOR AND OBTAIN APPROVAL TO REMOVE SEDIMENT AND EROSION CONTROL <br />MEASURES. <br />II. IMPLEMENTATION <br />PLANNED CONSTRUCTION PHASING AND SPECIFIC REQUIRED SEDIMENT AND EROSION CONTROL <br />MEASURES. <br />A PHASE 1: TOPSOIL STRIPPING AND STOCKPIU14G - THIS IS THE PHASE MER ALL DEBRIS REMOVAL TOPSOIL WILL BE <br />STRWPED AND STOCKPILED ON THE SITE AS SHOWN ON THE PUNS. THE FOLLOWING REQUIREMENTS WILL APPLY DURING <br />THIS PK45E OF CONSTRUCTION: <br />1, CONSTRUCTION OF A 'STWE' CONSTRUCTION ENTRANCE SHALL BE COMPLETED TO PREVENT SILT FROM BONG DEPOSITED <br />ON ROADWAYS. <br />1. CONTINUOUS 810 BERMS MD/OR DIVERSIONS DIRECTING RUNOFF TO TEMPORARY SEDIMENT FNSINS SHALL BE PLACED <br />ON THE DOWNHILL SIDE OF WHEREVER DIRT HIS BEEN DISTURBED BY GRADING TO PREVENT SILT FROM LEAVING THE <br />SITE, SPECIFIC ATTENTION SHOULD BE PAID TO CULVERTS AND CONSTRUCTION ENTRANCES, <br />3. ALL DEBRIS SHALL BE KEPT AWAY FROM DITCHES AND STREAMS TO PREVENT RUN-OFF ACCUMULATION WILL N07 CARRY <br />DEBRIS DOWNSTREAM, <br />4. CONTINUOUS BIO BERMS SHALL BE INSTALLED ALONG THE LOW SIDE OF THE SITE WHERE RUN-OFF FROM THE WORK <br />AREA WILL LEAVE THE SITE OR ENTER A DITCH, <br />5, SILT TRAPS AND SEDIMENT BASINS SHAD. BE INSTALLED WHERE SHOWN ON THE PLANS IN ACCORDANCE WITH DETAILS <br />SHOWN TO CATCH AND DATER RUN-OFF PRIOR TO DISCHARGE FROM THE SITE <br />6, ADDITIONAL SILT FENCING AROUND THE STOCKPILE AREA SHOULD BE INSTALLED TO PREVENT SILT WASH OFF FROM THE <br />SITE, <br />B. PHASE_2: GRADING OPERATIONS - THIS PEASE IS THAT TIME WHEN EARTH IS BEING MO,ED FROM ONE PORTION OF THE SITE <br />TO ANOTHER OR IS BEING HAULED INTO OR HAULED OFF FROM THE SITE THIS IS A CRITICAL. TIME WHEN SEDIMENT AND <br />EROSION CONTROL FACILITES MUST BE CONTINUALLY CHECKED TO ENSURE EFFECTIVENESS. MEASURES SHOULD BE CHANGED <br />OUT AS OFTEN AS REWIRED TO MEET DEMANDS OF CURRENT SITE CONDITIONS, THE FOLLOWING WILL APPLY TO THIS STAGE <br />OF CONSTRUCTION: <br />1. ALL SEDLY M CONTROL FACILITIES REQUIRED AND INSTALLED WRING PHASE 1 SKALL BE LEFT IN PUCE AND <br />MAINTAINED AS APPROPRIATE, <br />2. WHENEVER A SILT CONTROL FACILITY IS REMOVED BECAUSE OF CHANGING SBE CONDITIONS R SHALL BE IMMEDIATELY <br />REPLACED WITH ANOTHER MEASURE OF EQUAL OR GREATER EFFECTIVENESS THAT WILL CONTRIBUTE TO THE PROGRAM OF <br />SILT AND EROSION CONTROL <br />3. CUT SLOPES SHALL BE PROTECTED BY CONSTRUCTING SWALES AT THE TOP OF CUT SLOPES TO INTERCEPT RUN -OFT. <br />SWALES WILL BE CONSTRUCTED WITH RIP -RAP CHECK DANS OR SILT FENCES AS NECESSARY TO PREVENT EROSION AND <br />SILTATION. <br />4, FILL SLOPES SHALL BE PROTECTED BY THE CONSTRUCTION O BERMS AT THE TOP OF ALL FILL SLOPES TO PREVENT <br />UNCONTROLLED RUN-OFF DRAINING DOWN FACE OF SLOPES, <br />5. WHEN SHOWN W PUN, RUN-OFF DIRECTING BERMS FOR UPGRADE RUN-OFF SHALL BE CONSTRUCTED ALONG SLOPE <br />TO DRAINS THAT WILL CARRY RUN-OFF DOWN THE SLOPE. SLOPE DRAINS SHALL HAVE INLET SILT PROTECTION TYPICAL <br />OF OTHER SITE STORM INLET PROTECTION. <br />6. SILT FENCES SHALL BE IN PUCE AT THE TOE OF ALL FILL SLOPES. <br />7, TERRACES, BERMS, AND SWALES SHALL BE CONSTRUCTED AT INTERMEDIATE LOCATIONS THROUGHOUT THE SITE AS <br />NECESSARY TO CONTROL EROSION AND SEGMENT TRANSPORT, THESE DIVERSION FACIUTIES SHALL BE SUPPLEMENTED <br />AS APPROPRIATE WITH SILT FENCES AND RIP -RAP FILTER BERMS TO FILTER ACCUMULATED SEDIMENT FROM RUN-OFF <br />PRIOR TO DISCHARGE FROM THE SITE <br />8. SLOPES (CUT AND FILL) THAT ARE CONSTRUCTED IN THE FINAL CONFIGURATION SKLLL BE COVERED WITH FOUR INCHES <br />(47 OF TOPSOIL AND GRASSED AND MULCHED AS SOON AS GRADING IS COMPLETED. THIS GROWING VEGETATION WILL <br />GIVE ADDED PROTECTION TO THE SLOPE <br />9, PORTIONS OF THE SITE THAT ARE GRADED TO FINAL OWE MO ARE NOT TO RECEIVE PAVEMENT OR BUILDINGS SHOULD <br />HAVE FOUR INCHES (47 OF TOPSOIL SPREAD OVER THE SURFACE AND GRASSED AS SOON AS POSSIBLE IN <br />CONSTRUCTION PROCESS THIS PHASE OF CONSTRUCTION IS CRITICAL IN THE EROSION AND SEDIMENT CONTROL <br />PROCESS, <br />IO.STORM SEWERS SHOULD BE INSTALLED AS SOON AS POSSIBLE IN THE CONSTRUCTION PROCESS AND CONCURRENT <br />TO GRADING OPERATIONS WHENEVER POSSIBLE TO ENSURE A SUCCESSFUL PROGRAM, CONSTRUCTION RUN-OFF SHALL <br />BE DIRECTED TO STORM SEWER SYSTEM AS SOON AS POSSIBLE, <br />MOL TION AND EROSION CONTROL PLAN <br />ARCO C®STORE AND FUEL CANOPY <br />3443 CHEROKEE ROAD, SAN JOAQUIN COUNTY CA <br />C. P I j: STORM STORM <br />ANO S SHALL <br />11AnAL PLAN -THIS PHASE WILL BE COMPLETED MER OR CONCURRENT POSSIBLE, <br />THE , THE <br />PHASE, PHASE 2. STORM SEWERS SHALL C INSTALLED AND PUT INTO SERVICE AS EARLY IN THE GRADING PROCESS AS POSSIBLE. THE <br />FOLLOWING WILL APPLY TO THIS PHASE OF CONSTRUCTION: <br />I. ALL ASPECTS OF THE PREVIOUS PHASES SHALL BE MAINTAINED AS APPLICABLE <br />2, STORM SEWERS THAT ARE INSTALLED SHALL BE PUT INTO SERVICE IMMEDIATELY, THE INLETS OF ALL STORM SEWERS SHALL BE <br />PROTECTED WITH SILT TRAPS THAT PREVENT SEDIMENT FROM ENTERING PIPE, TNS PROTECTION CAN BE SILT FENCE OR RIP -RAP FILTER <br />BERMS AS APPLICABLE AND SHOWN ON THE PLANS. <br />3. RIP -RAP AS SHOWN ON THE PLANS AND AS REQUIRED ON THE SITE WILL BE INSTALLED AT EMERGENCY SPILLWAYS TO PREVENT <br />EROSION DUE TO OUTFLOW WATER VELOCITY. RIP -RAP SHALL BE EXTENDED DOWNSTREAM AS NEEDED TO PREVENT EROSION. <br />4, ADDITIONAL SILT FENCING SHALL BE INSTALLED AS NECESSARY TO PREVENT EROSION AND SILTATION RESULTING FROM STOCKPILED <br />EXCAVATION MATERIAL FROM UTILITY INSTALLATION OPERATIONS. <br />D. PHNSE 4: FINISH CPADINC, CURB MO PAVEMENT INSTALLATION, LANDSCAPING THIS <br />IS THE WRAPSTAGE WHEN ALL TEMPORARY <br />SEDIMENT MD EROSION CONIIROL MEASURES WILL BE PMASEO OUT. 71$ FOI.IOWWTO WnL APPLY TO THIS PHASE; <br />1. ALL FACILITIES FROM PHASE I THROUGH PHASE 4 WILL BE MAINTAINAO, MODIFIED, DR REMOVED WHEN APPROPRIATE, <br />2, SILT TRAPS AROUND DRAINAGE INLETS WILL BE MAINTAINED, MODIFIED AS NECESSARY, AND REMOVED WHEN APPROPRIATE. <br />3. ALL AREAS NOT RECEMNG PAVEMENT OR BUILDINGS SHALL HAVE FOUR INCHES (41 OF TOPSOIL SPREAD OVER THE AREA AND GRASSED, <br />OR HAVE LANDSCAPING, MULCHING MD/GR SOD INSTALLED PER THE PLANS. <br />4, CONTRACTOR MAY TEMPORARILY COVER SOME AREAS WITH 2A ' THICK GRADED AGGREGATE IN UEU OF GRASSING FOR TEMPORARY <br />EROSION CONTROL <br />E LWDSCAPING / SEEDING <br />REFER TO LANDSCAPING PIAN FOR ACTUAL REQUIREMENTS FOR THE INSTALLATION OF LIME FERTILIZER, SEED, AND MULCH. GRASSING <br />OPERATIONS SHALL BE COMPLETED THROUGHOUT CONSTRUCTION PROCESS AT THOSE TIMES WHEN PORT06 OF THE SITE ARE FINISHED AND <br />RE DY FOR PERMANENT GROUND COVER, THIS WILL REQUIRE MULTIPLE EFFORTS BY THE GRASSING SUBCONTRACTOR TO STABILIZE ALL <br />IMPACTED AREAS OF THE SITE IN AN ORDERLY FASHION, ND AREA OF THE SITE THAT RECEIVES FINAL GRADE SHALL BE LEFT FOR MORE <br />THIN SEVEN (7) DAYS WITHOUT THE APPLICATION OF SEED AND MULCH. <br />f. INSPECTION AND MAINTENANCE INSTRUCTIONS: <br />THE FOLLOWING WILL APPLY TO MAINTAINING EROSION AND SEDIMENT CONTROL FAC Un ES <br />I. ALL EROSION AND SEDIMENT CONTROL FACILITIES SHALL BE INSPECTED REGULARLY TO ENSURE THEY ARE EFFECTIVE IN THE EVENT OF <br />RAINFALL. MEASURES SHALL BE INSPECTED ONCE A WEEK (MINIMUM) AND WITHIN TWENTY-FOUR (24) HOURS AFTER EACH RAINFALL <br />EVENT, ANY DAMAGED OR NONFUNCTIONAL FACILITY SHALL BE REPAREO OR REPLACED IMMEDIATELY. WEEKLY INSPECTION REPORTS <br />SHUT BE KEPT ON FILE IN THE CONSTRUCTION TRAILER, <br />2. SEDIMENT TRAPS SHALL BE CHECKED REGULARLY FOR SEDIMENT CLEANOUT. SEOUENT SHALL BE REMOVED AND THE TRAP RESTORED <br />TO ITS ORIGINAL DIMENSIONS WHEN THE SEDIMENT HAS ACCUMULATED 10 ONE -MWF (I4 THE DESIGN VOLUME OF THE WET STORAGE <br />SEDIMENT REMOVED FROM THE TRAP SHALL BE DEPOSITED IN SUITABLE AREAS ANS IN $UCH A MANNER THAT IT WILL NOT ERODE AND <br />CAUSE CONTINUED SEDIMENTATION PROBLEMS, <br />3. GRAVEL OUTLETS AND CHECK DAMS SHALL BE INSPECTED REGULARLY FOR SEDIMENT BUILDUP WHICH WILL PREVENT DRAINAGE, IF THE <br />GRAVEL IS OBSTRUCTED BY SEDIMENT, IT SHALL BE REMOVED AND CLEANED OR REPLACED. <br />4. SILT FENCE BARRIERS BALL BE CHECKED REGULARLY FOR UNDERMINING OR DEERORATKON OF THE FABRIC. SEDIMENT SHALL BE <br />REMOVED MIEN THE LEVEL OF DEPOSITION REACHES ONE-THIRD THE HEIGHT OF THE DARKER. <br />5, SEEDED AREAS SHALL BE CHECKED REGULARLY TO ENSURE A GOOD STAND IS MAINTAINED. AREAS SHOULD BE FERTILIZED AND <br />RE -SEEDED AS NECESSARY, <br />6, IF ANY FACILITY IS DAMAGED DURING MAINTENANCE, OR OTHERWISE, THE DAMAGED PORTION SHALL BE REMOVED AND REPLACED <br />ACCORDING TO THE ASSOCIATED DETAIL <br />7, IF SILT HAS OBSTRUCTED THE SEDIMENT CONTROL FACILITY TO THE POINT OF EUMNATWG ALL FILTERING EFFECTIVENESS, THE STRUCTURE <br />SHALL BE REMOVED AND REPLACED WITH A NEW STRUCTURE IN ACCORDANCE WITH THE ASSOCIATED DETAIL <br />8. CONSTRUCTION STAGING AREA SHALL HAVE ADDITIONAL STONE ADDED AS MUD COVERS STONE. UNDER WET SOIL CONDITIONS, TIRES <br />SHALL BE WASHED PRIOR TO ENTERING A PAVED ROADWAY, <br />G. 1WNTAINNG EFFECTIVENESS: <br />CONTR/uCTOR SHALL INSPECT OVERALL PERFORMANCE O EROSION AND SEDIMENT CONTFOL FAC0.JTIE5 AND AREAS DOWNSTREAM. IF SILT IS <br />APPARENT DOWNSTREAM FROM STRUCTURES, SOME FAILURE HAS OCCURRED, IF SEDIM[NT 5 OBSERVED DOWNSTREAM, NOTI <br />FY THE CML <br />ENGINEER. TIA CML ENfANEER W0.L INSPECT THE CONDITION ARD MER INSPECTIW, ORSHA THE REMOVAL E A MENDED SOLUTIONS <br />7 <br />DOWNSTREAM AS ADD ADDITIONAL STRUCTURAL MEASURES AS NECESSARY. CONTRACTOR SMALL IMPLEMENT RECOMMENDED SOlRIONS TO <br />PROBLEM AREAS AS RECOMMENDED. <br />III. COMPLETION <br />A PROJECT O.OSE SHIT: <br />THE <br />FOLLOWING SHALL BE DONE AT THE ENO OF THE PROJECT <br />1. <br />INSPECT SITE TO ENSURE THAT GROUND COVER IS COMPLETE AND ADEQUATE. ALL AREAS SHOULD BE EITHER PAVED OR RAVE <br />SUFFICIENT GROUND COVER (MINIMUM BOX VEGETATIVE COVER) WITH NO APPARENT EROSION. <br />2. <br />WHEN GROUND COVER INSPECTION IS MADE AND APPROVED, ALL STRUCTURAL ERCSION CONTROL FACILITIES MAY BE REMOVED ALONG <br />WITH ANY ACCUMULATED SILT AND DEBRIS. AREAS DISTURBED BY STRUCTURE REM.NAL SHALL BE FINE GRADED, GRASSED, AND <br />MULCHED AS REQUIRED. <br />3, <br />IF GROUND COVER INSPECTION IS MADE AND PROBLEMS DISCOVERED, PERFORM APPROPRIATE REPAIR MEASURES AND RE -INSPECT PRIOR <br />TO STRUCTURE REMOVAL <br />4. <br />ALL CONSTRICTED AND EXISTING STORM SEWERS SHALL BE INSPECTED UPON REYCYAL OF INLET PROTECTION, STRUCTURES CONTAINING <br />SEDIMENT AND / OR CONSTRICTION DEBRIS SHALL BE VACUUM CLEANED PRIOR TO FIUNG NOTICE OF TERMINATION WITH ENVIRONMENTAL <br />PROTECTION AGENCY. <br />B. 4ISCELIANEOUS ISSUES <br />I. <br />NO FUEL OR O0. SHALL BE STORED ON SITE WITHOUT PROPER CONTAINMENT. <br />2, <br />NO OILS OR GAS SHAU BE DUMPED W SITE. <br />3, <br />LOCATION OF TRAILER AND PORTABLE RESTROOM FACILITY SHALL BE FIELD-DETERwHEO TO AVOD CONSTRUCTION ACOOTIES. LOCATION <br />SHALL CHANGE DURING CONSTRUCTION AS NECESSARY, <br />4, <br />DE -WATERING OPERATIONS ARE NOT REQUIRED ON THIS PROJECT, IF REQUIRED, P;MPED GROUND WATER SPALL BE ROUTED THROUGH <br />SILT CONTROL FACILITY TO FILTER WATER PRIOR TO DISCHARGE <br />S. <br />PROJECT SITE SPALL BE KEPT CLEAR OF ALL TRASH AND CONSTRUCTION DEBRIS CONTRACTOR SHALL HAVE TRASH COLLECTED WEEKLY <br />AND PLACED IN DUMPSTER TO BE HAULED OFF-SITE, <br />6. <br />ALL WATER SUPPLY WILL BE PROVIDED FROM PUBLIC WATER SUPPLY, <br />7, <br />ALL HUMAN WASTE SHALL BE IN PORTABLE RESTROOM FACILITY OR IN TOILET CONIF.CTED TO PUBLIC SEWER SYSTEM. WASTES SHALL <br />BE DISPOSED OF BY A UCENSED VENDOR OR IN A PUBLIC SANITARY SEWER SYSTEM, <br />e. <br />ANY SPILLED OIL, GAS, ETC, RESULTING FROM CONSTRUCTION ACTIVITIES SHALL BE CONTAINED AND CLEANED IMMEDIATELY, <br />CONTAMINATED SOILS SHALL BE DISPOSED OF W M APPROVED MANNER AT A UCCISED LANDFILL <br />9, <br />DUST SUPPRESSION OPERATIONS SHALL BE PERFORMED BY MEANS OF A WATER TICK DISTRIBUTING A FINE MIST OF WATER W THE <br />SITE SURFACE, CONCENTRATED STREAMS OF WATER SPRAY SHOULD BE AVOIDED. <br />IO.A DESIGNATED CONCRETE SPOILS AREA SHALL BE IDENTIFIED ON THE SITE, ALL AFTECTED SOILS AND CONCRETE SPOILS IN THIS <br />AREA SHALL BE REMOVED FROM THE STE UPON COMPLETION OF CONCRETE PLACEMENT ACTIVITIES, <br />I <br />LANY NON -STORM DISCHARGES SUCH AS, BUT NOT LIMITED TO, FIRE HYDRANT FLUSHINGS, WASH WATERS, DUST CONTROL <br />IRRIGATION DRAINAGE, ETC., THAT DO NOT CONTAIN HAZARDOUS MATERIALS SHALL X PREVENTED FROM ALLOWING SEDIMENT TRANSPORT <br />INTO STORM SEWERS. FLUSHINGS THAT CONTAIN HAZARDOUS MATERIALS SHALL BE PREVENTED FROM ENTERING THE STORM SEWERS AND <br />SHALL BE COLLECTED AND DISPOSED OF IN AN APPROVED MANNER. <br />STOCK PILES <br />1 INSTALL BD BERM OR SEDIMENT FENCING/BARRIERS AT TOE OF SLOPE. <br />2 STOCK PILES ON SITE DURING COLD WET WEATHER SEASON (NOVEMBER 15 THROUGH APRIL 30) SHALL BE COVERED WITH <br />POLYETHYLENE PLASTIC SHEETING 5 MIL MINIMUM THICKNESS, <br />3 COVERING SHALL BE INSTALLED N AILED AND LSEAMSMAINTAINED TIGHTLY M PLACE BY USING SANDBAGS L ROPES WITH A E SIAL 108 <br />B <br />GRD SPACING IN ALL DIRECTIONS, ALL SEAMS SHALL BE TAPED OR WEIGHTED DOWN ilAl LENGTH AND THERE SHALL BE AT <br />LEAST A 12' OVERLAP OF ALL SEAMS FOR SEAMS PARALLEL TO THE SLOPE CONTOUR, THE UPHILL SHEET SEW1 OVERLAP <br />THE DOWNHILL SHEET. NO RUNOFF SHALL BE ALLOWED TO RUN UNDER THE PLASTIC COVERING. <br />4 CONSTRUCTION MATERIALS CONTAINING TOXIC CONTAMINANTS SHALL NOT BE STORED WITHIN 25 FEET OF ANY STORM DRAIN <br />INLET STRUCTURE OR DESIGNATED PROTECTED AREA. <br />5 DEERS, WASTE AND GARBAGE PILES SHALL NOT BE PLACED WITHIN 25 FEET DF ANY STORM DRAW INLET STRUCTURE OR <br />DESIGNATED PROTECTED AREA <br />6 LOCATION OF CONSTRUCTION MATERIAL STORAGE MEAS AND DEBRIS, WASTE AND GARBAGE RLE MEAS SHIN. BE PROVIDED <br />HY THE CONTRACTOR AT THE TIME OF THE INITIAL ESC CONTROL INSPECTION, <br />GENERAL EROSION CONTROL NOTES: <br />t. THE IMPLEMENTATION OF THE EROSION CONTROL PLAN AND THE CONSTRUCTION, MAINTENANCE, REPLACEMENT AND <br />UPGRADING OF THE EROSION CONTROL FACILITIES IS THE RESPONSIBILITY OF THE APPUCART/CGNTRACTGR UNTIL ALL <br />CONSTRUCTION IS APPROVED. <br />Z. THE EROSION CONTROL FACILITIES SHOWN ON THIS PLM MUST BE CONSTRUCTED PRIOR TO ALL CLEARING AND GRADING <br />ACTMTIES, MO IN SUCH A MANNER AS TO ENSURE THAT SEDIMENT UDEN WATER DOES NOT ENTER THE DRAINAGE SYSTEM OR <br />VIOLATE APPLICABLE <br />WATER STANDARDS. <br />EROSION CONTROL FACILITIES SHOWN ON THIS PLM ARE THE MINIMUM REQUIREMENTS FOR ANTICIPATED SITE <br />LONORONS DURING THE CONSTRUCTION PERIOD, THE EROSION CONTROL FACILITES SMALL BE UPGRADED (EG., ADDITIONAL <br />SUMPS, RELOCATION OF DITCHES AND <br />STRAIN WADDLES, ETC.) AS NEEDED FOR UNEXPECTED STORM EVENTS AND AS THE CRY REWIRES, <br />4. THE EROSION CONTROL FACILITIES SHALL BE INSPECTED BY APPLICANT/CONTRACTOR AND MAINTAINED AS NECESSARY TO <br />ENSURE THEIR CONTINUED FUNCTIONING AND OPERATION. INSPECTIONS SHALI, BE PERFORMED DAILY AS WELL AS IMMEDIATELY <br />FOLLOWING A STORM EVENT, <br />5. AT NO TINE SHALL MORE THAN I FOOT OF SEDIMENT BE ALLOWED TO ACCUMULATE WITIVN A CATCH BASIN. ALL CATCH <br />BASINS MD CONVEYANCE LINES SHALL BE CLEANED PRIOR TO PAVING. THE CLEARING OPERATION SHALL NOT FLUSH SEDIMENT <br />LADEN WATER INTO <br />THE DOWNSTREAM SYSTEM. <br />CONSTRUCTION PROGRESSES AND UNEXPECTED SEASONAL CONDITIONS DICTATE, AND AS THE STATE OR FEDERAL <br />REWIRE$, THE PERMITTEE SHOULD ANTICIPATE THAT MORE EROSION CONTROL MEASURES WILL BE NECESSARY TO PROTECT <br />ADJACENT PROPERTIES AND ENSURE MINIMUM WATER QUALITY FOR SITE RUNOFF. R SHALL BE THE RESPONSIBILITY OF <br />THE PERMITTEE TO ADDRESS DEFICIENT EROSION CONTROL CONDITIONS AND PROVIDE ADDITIONAL FACILITIES, OVER AND <br />ABOVE MINIMUM REQUIREMENTS OUTLINED W THE APPROVED PUNS. <br />7. UPON COMPLETION OF THE PROJECT, IT SHALL BE THE RESPONSIBUTY OF THE STORE MANAGER TO MAINTAIN THE SITE <br />MD FACILITY AS 70 MINIMIZE POTENTIAL FOR EROSION RUNOFF. <br />WATTLE <br />ANCHOR WEIG'1TS WITH STAPES <br />00. BERM <br />� STRAW BALES <br />BURY SHEETING INA W. X 6 IN, TRENCH <br />A MINIMUM OF' 8 FT. SETBACK FROM TOP <br />OF SLOPE. DACNFlLL WITH WASHED ROCK. <br />PROVIOE ENERGY DISSIPATION <br />AT TOE WHEN NEEDED. <br />TOE IN SHEETING IN 1 IN. X 6 IN. <br />1RENLH A MINIMUM OF } R. SETBACK <br />FROM BOTTOM OF SLOPE. BACKFIL <br />L WITH <br />WASHED ROCK. <br />CONVEY RUNOFF TO APPROVED LOCATION. <br />�ANCHOR WEIGHTS WITH STAPES <br />CONVEY RUNOFF TO <br />APPROVED LOCATION. <br />1 Too MAX. <br />• \ <br />\ 3' NW. <br />CUT SLOPES. <br />ALl<AHA l0 PAD/IK WIYEMAR 1EwOWMY FFOPW F.O1ECIpN i0 YlR3 AND <br />L6111W(ED MALS lwT cuoaP Is mFAm w MAo-m t wrrNc <br />PLASTIC COVERING DETAIL <br />V NOT TO SCALE <br />7 1 TEMPORARY 'V' DITCH <br />\ - / NOT TO BC'AlE <br />CLIENT: <br />by <br />ARC® <br />ISP IiAT CC.LPI PTCWCIFLLC <br />mP�G, H q US�Z <br />I <br />o ( _ <br />(Y U <br />O _ <br />2� <br />GX TVIVC ENG\NF'�Ph <br />18215 72ND AVENUE SOUTH <br />KENT, WA 98032 <br />(125)251-6222 <br />(125)251-8782 FAX <br />fPAI ENGW4ERNG, LAND PLANNING, <br />SUFMYPC, EAVRONMENIAL SERIKFS <br />N0. DAII ISWV IN rcS Tmk <br />I J -u -Te NrT oozes <br />x 6-xF-le IpAf A[SWRMTAN <br />e <br />0 <br />0 <br />�=y�C QWOFESS/q\.�fyc <br />4 v <br />K-tid8 r <br />ITE, CIV IE �� <br />OF CAl\F <br />oE`nrouDNr IxxdA,APIGTe <br />ARCO NTI <br />AM <br />/PM <br />FUEL CANOPY <br />WITH 8 MPD's <br />rz AOGWEs <br />NWC CHEROKEE ROAD <br />®NEWTON ROAD <br />SM JOAW IN COUNTY, CALIFORNIA <br />FACILITY # TBD <br />C[SIDm R PB IAYR <br />DAbO R TW <br />Muw "' vB Tu <br />IasWN n MIX <br />18068 <br />diAMRIG BILL <br />EROSION <br />CONTROL NOTES <br />AND DETAILS <br />scn Na <br />C3.1 <br />