Laserfiche WebLink
SECTION 01400 -QUALITY CONTROL/GENERAL REQUIREMENTS <br />PART 1 GENERAL <br />A SECURE AND PAY FOR ALL LICENSES, GOVERNMENT FEES AND PERMITS REQUIRED FOR PROPER <br />EXECUTION AND COMPLETION OF WORK, COMPLY WITH ARPUCABLE CODES, RULES, ORDINANCES AND <br />OTHER LEGAL REOUIREMENTS. BUILDING PERMIT PROVIDED BY OWNER, <br />B. TAKE RESPONSIBILITY FOR RENEWING CONTRACT DOCUMENTS FOR PROCEDURES, SPACE REQUIREMENTS, <br />MATERIALS, INSTALLATION SEQUENCE AND COORDINATION WITH BP. THE LATEST EDITION IS TO BE USED <br />WHERE REFERENCE IS MADE TO PUBLISHED STANDARDS. <br />C. CONFINE OPERATIONS TO AREAS PERMITTED BY TAW, ORDINANCES, PERMITS AND CONTRACT DOCUMENTS. <br />00 NOT UNREASONABLY ENCUMBER SITE WITH IMTERIALS OR EQUIPMENT, ASSUME FULL RESPONSIBILITY <br />FOR PROTECTION OF PRODUCTS STORED ON PREMISES WITHIN CONTRACT LIMITS, <br />D. <br />IMMEDIATELY LOCATE ALL REFERENCE POINTS, LAYOUT WORK AND BE RESPONSIBLE FOR ALL <br />MEASUREMENTS AND OTHER WORK TO BE EXECUTED UNDER THE CONTRACT, VERIFY ALL FIGURES <br />SHOWN ON THE DRAWINGS. VERIFY ALL DIMENSIONS OF ANY EXISTING AND NEW WORK AND BE <br />RESPONSIBLE FOR THEIR ACCURACY, SUBMIT ANY DIFFERENCES FOUND TO SP BEFORE PROCEEDING <br />WITH THE WORK. NO EXTRA COMPENSATION WILL BE PERMITTED BECAUSE OF DIFFERENCES BETWEEN <br />ACTUAL DIMENSIONS AND MEASUREMENTS INDICATED ON THE DRAWINGS, <br />E. BE RESPONSIBLE FOR KEEPING SITE CLEAN AT ALL TIMES, PROVIDE METAL CONTAINERS FOR WASTE AND <br />SCRAP MATERLAS. REMOVE FROM SITE WHEN FULL TAKE RESPONSIBUIY FOR FINAL CLEANING, <br />REMOVE ALL TOOLS, SCAFFOLDING, AND SURPLUS MATERIALS FROM THE SITE AT COMPLETION OF <br />WORK, <br />F. BE RESPONSIBLE FOR PREVENTING AIR AND WATER POLLUTION THROUGH DUST AND DIRT CONTROL IN <br />THE FOLLOWING: <br />F.1, IN THE STREET, SIDEWALKS AND DRIVES WITHIN THE LIMITS OF THE CONTRACT. <br />F,2, ANY HAUL ROADS LEADING TO OR AWAY FROM THE PROJECT THAT ARE USED BY THE CONTRACTOR. <br />F,3, TAKE ALL NECESSARY STEPS TO PREVENT SOIL ERODING ONTO ALL PAVED AREAS AND INTO ALL <br />NATURAL WATER -COURSES, DITCHES AND THE PUBLIC SEWER SYSTEM. <br />C. BP MAY EMPLOY AND PAY FOR AN INDEPENDENT TESTING LABORATORY TO PERFORM ANY TEST OR <br />INSPECTION TO SHOW COMPLIANCE WITH THESE SPECIFICATIONS, IF TESTS INDICATE WORK DOES NOT <br />MEET SPECIFIED REQUIREMENTS, REMOVE WORK, REPLACE, AND RETEST WITHOUT ADDITIONAL COST TO <br />BP. <br />SECTION 02100 - SITE PREPARATION <br />PART 1 GENERAL <br />1.1 DESCRIPTION <br />A SECTION INCLUDES: <br />A1, CLEANING SITE OF DEBRIS, GRASS, TREES AND OTHER PLANT LIFE IN PREPARATION FOR SITE OR <br />BUILDING EXCAVATION WORK, <br />A2. PROTECTION OF EXISTING STRUCTURES, TREES OR VEGETATION INDICATED TO REMAIN, <br />A.3, STRIPPING TOPSOIL FROM AREAS INDICATED. <br />B. B. RELATED DOCUMENTS: THE CONTRACT DOCUMENTS, AS DEFINED IN THE GENERAL CONDITIONS, APPLY <br />TO THE WORK OF THIS SECTION, ADDITIONAL REQUIREMENTS AND INFORMATION NECESSARY 70 <br />COMPLETE THE WORK OF THIS SECTION MAY BE FOUND IN OTHER DOCUMENTS, <br />B,1, 1, SECTION 02200 - EARTHWORK: CUTTING, FILLING, AND GRADING FOR PROPOSED SITE <br />IMPROVEMENTS. <br />12 QUALITY ASSURANCE <br />A. A REGULATORY REGUIREMENTS: <br />A.1, PROVIDE TEMPORARY EROSION CONTROL SYSTEMS AS INDICATED ON DRAWINGS OR AS DIRECTED BY <br />OWNER'S REPRESENTATIVE TO PROTECT ADJACENT PROPERTIES AND WATER RESOURCES FROM <br />EROSION AND SEDIMENTATION. <br />13 PROJECT CONDITIONS OR SITE CONDITIONS <br />A EXISTING CONDITIONS: <br />A1, CONDITIONS EXISTING AT TIME OF INSPECTION DURING BIDDING WILL BE MAINTAINED BY OWNER IN <br />SO FAR AS PRACTICAL <br />A2, NOTIFY OWNER OF VARIATIONS TO CONDITIONS OR DISCREPANCIES IN ACTUAL SITE CONDITIONS PRIOR <br />TO START OF SITE PREPARATION WORK, <br />A3. TRAFFIC: CONDUCT OPERATIONS AND REMOVAL OF DEBRIS WITH MINIMUM INTERFERENCE TO ROADS. <br />STREETS, WALKS, AND OTHER ADJACENT FACILITIES. DO NOT CLOSE OR OBSTRUCT STREETS, WALKS <br />OR 07HER FACILITIES WITHOUT PERMISSION FROM AUTHORITIES HAVING JURISDICTION. <br />A.4. PROTECTIONS: PROVIDE PROTECTION FOR SAFE PASSAGE OF PERSONS AROUND AREA OF SITE <br />PREPARATION, TAKE PRECAUTIONS AND CONDUCT OPERATIONS TO PREVENT INJURY TO ADJACENT <br />BUILDINGS, STRUCTURES, OTHER FACILITIES, AND PERSONS. 0. PROVIDE INTERIOR AND EXTERIOR <br />SHORING, BRACING, OR SUPPORT TO PREVENT MOVEMENT, SETTLEMENT OR COLLAPSE OF <br />STRUCTURES TO BE DEMOLISHED AND ADJACENT FACILITIES TO REMAIN. <br />A5, WHERE IT 5 NECESSARY TO CUT PUBLIC CURBS, THEY SHALL BE RESTORED AND/OR <br />RECONSTRUCTED IN STRICT ACCORDANCE WITH THE REQUIREMENTS OF THE GOVERNING JURISDICTION, <br />RECONSTRUCT PUBLIC CURBS AFTER DEMOUTION OF EXISTING APPROACHES AND IN COMPLIANCE <br />WITH SECTION 3300 CAST -IN-PLACE CONCRETE, <br />A,6. ALL UTILITY STRUCTURES TO BE CONSTRUCTED IN ACCORDANCE WITH ALL GOVERNING CODES OR <br />STANDARDS (CITY, COUNTY OR STATE) AND IN COMPLIANCE WITH THE PLUMBING, MECHANICAL AND <br />ELECTRICAL SPECIFICATIONS AS DETAILED ON THE DRAWINGS. <br />PART 2 PRODUCTS <br />2 1 MATERIALS <br />A TOPSOIL, FRIABLE CLAY LOAM SURFACE SOIL CONTAINING HUMUS, ORGANIC NATTER, FOUND IN A DEPTR <br />OF NOT LESS THAN 4 INCHES FREE OF SUBSOIL, CLAY LUMPS, STONES, AND OTHER OBJECTS OVER 2 <br />INCHES IN DIAMETER, AND WITHOUT WEEDS, ROOTS, AND OTHER UNSUITABLE MATERIAL. <br />PART 3 EXECUTION <br />3A EXAMINATION <br />0. SITE VERIFICATION OF CONDITIONS: EXAMINE AREAS IN WHICH WORK OF THIS SECTION IS TO BE <br />PERFORMED, VERIFY CONDITIONS AND NOTE IRREGULARITIES AFFECTING THE WORK. REPORT IN WRITING <br />TO OWNER AND ARCHITECT/ENDINEER PREVAILING CONDITIONS THAT WILL ADVERSELY AFFECT <br />SATISFACTORY EXECUTION OF THE WORK, <br />B. BEGINNING OF WORK CONSTITUTES ACCEPTANCE OF THE EXISTING CONDITIONS AND CONTRACTOR SHALL <br />THEN, AT NO ADDITIONAL COST TO OWNER, BE RESPONSIBLE FOR CORRECTING UNSATISFACTORY AND <br />DEFECTIVE WORK, <br />C. VERIFY THAT SURVEY BENCHMARK AND INTENDED ELEVATIONS FOR THE WORK ARE AS INDICATED, <br />3.2 PREPARATION <br />A VERIFY THAT EXISTING PLANT LIFE AND CLEARING LIMITS ARE CLEARLY TAGGED, IDENTIFIED AND MARKED <br />IN SUCH A MANNER AS TO INSURE THEIR SAFETY THROUGHOUT CONSTRUCTION OPERATIONS. <br />7 3 CLEARING <br />A CLEAR AREAS REQUIRED FOR ACCESS TO SITE AND EXECUTION OF WORK, <br />B. REMOVE TREES, SHRUBS, GRASS, OTHER VEGETATION, IMPROVEMENTS, OR OBSTRUCTIONS INTERFERING <br />C. REMOVE GRASS, TREES, PLANT LIFE, SNAPS AND ALL OTHER CONSTRUCTION DEBRIS TRIOTI SITE TO A <br />DUMP SITE THAT IS SUITABLE FOR HANDLING SUCH MATERIAL ACCORDING TO STATE LAWS AND <br />REGULATIONS. <br />3.4 TOPSOIL EXCAVATION <br />A STRIP TOPSOIL FROM AREAS THAT ARE INDICTED TO BE FILLED, EXCAVATED, LANDSCAPED, OR <br />RE -GRADED TO DEPTH THAT PREVENTS CONTACT WITH UNDERLYING SUBSOIL OR UNSUITABLE MATERIAL. <br />WHERE TREES ARE INDICATED TO REMAIN, STOP TOPSOIL STRIPPING SUFFICIENT DISTANCE FROM TREE <br />TO PREVENT DAMAGE TO MAIN ROOT SYSTEM. <br />B. CUT HEAVY GROWTHS OF GRASS FROM AREAS PRIOR TO START OF STRIPPING, REMOVE HEAVY GROWTHS <br />OF GRASS ALONG WITH CLEARING OF OTHER VEGETATION MATERIALS, <br />C. SATISFACTORY TOPSOIL: SEE SECTION 2.1 MATERIALS, <br />D. STOCKPILE EXISTING TOPSOIL FROM AREAS TO BE GRADED AS DIRECTED BY OWNERS REPRESENTATIVE. <br />CONSTRUCT STOCKPILE AREAS TO POSITIVELY DRAIN SURFACE WATER, COVER STOCKPILE AREAS AS <br />REQUIRED TO PREVENT WINDBLOWN DUST, DISPOSE OF UNSUITABLE TOPSOIL OFF -SNE AS SPECIFIED <br />CLEARING, UNLESS DIRECTED OTHERWISE BY OWNER'S REPRESENTATIVE. UTILIZE STOCKPILED TOPSOIL <br />FOR FINAL GRADING ACTIVITIES IN TURF AREAS. COVER AND RETAIN ALL EXCESS TOP SOIL FOR USE BY <br />LANDSCAPE CONTRACTOR DURING PLANTING AND BED PREPARATION, DISPOSE OF EXCESS TOPSOIL <br />OFF-SITE AS SPECIFIED FOR CLEARING, UNLESS DIRECTED OTHERWISE BY OWNER'S REPRESENTATIVE. <br />ARCO SITE SPECIFICATIONS <br />ARCO C -STORE AND FUEL CANOPY <br />3443 CHEROKEE ROAD, SAN JOAQUIN COUNTY CA <br />ALL WORK SHALL COMPLY WITH THE SAN JOAQUIN COUNTY STANDARD SPECIFICATIONS <br />3.5 REMOVAL <br />A. REMOVE DEBRIS, ROCK, EXTRACTED PLANT LIFE, PAVING, CURBS, AND OTHER STRUCTURES INDICATED ON <br />DRAWINGS. <br />3.6 PROTECTION <br />A. PROTECT EXISTING STRUCTURES AND UTILITIES AS SPECIFIED IN SECTION 02200, <br />B. PROTECT TREES, PLANT GROWTH, AND FEATURES INDICATED TO REMAIN, <br />SECTION 02200 -EARTH WORK <br />PART 1 GENERAL <br />DESCRIPTION <br />A SECTION INCLUDES: <br />AI. PREPARATION OF SUBGRAOE FOR BUILDING, SUBS, WALKS, PAVEMENTS, AND OTHER SITEWORK. <br />A2. ROUGH AND FINISH GRADING, <br />0.3. EXCAVATION FOR FILLING AND GRADING, <br />AAL, FILLING AND SUBGRADE PREPARATION. <br />A5. EXCAVATING, BACKFILLING, AND COMPACTING FOR STRUCTURES, <br />AIS. EXCAVATING, BACKFILLING, PPE BEDDING, COMPACTING FOR UTILITIES. <br />A7. EXCAVATING. BACKFILUNG, AND COMPACTING FOR PAVEMENT. <br />A0. SOIL STABILIZATION. <br />B. RELATED DOCUMENTS: THE CONTRACT DOCUMENTS, AS D -_FINED IN THE GENERAL CONDITIONS, APPLY <br />TO THE WORK OF THIS SECTION, ADDITIONAL REQUIREMENTS AND INFORMATION NECESSARY TO <br />COMPLETE THE WORK OF THIS SECTION MAY BE FOUND IN 07HER DOCUMENTS, <br />C. RELATED SECTIONS: <br />C.1. 1. SECTION 02100 - SITE PREPARATION: CLEARING SITE OF DEBRIS. GRASS. TREES, AND OTHER <br />PLANT LIFE. <br />1.2 REFERENCES: <br />THE FOLLOWING PUBLICATIONS ARE INCLUDED AS PART OF REFERENCED PUBLICATIONS THESE EARTHWORK <br />SPECIFICATIONS: <br />1. ASTM C 136 - METHOD FOR SIEVE ANALYSIS OF FINE AND COARSE AGGREGATES. <br />T. ASTM D 698 - TEST METHODS FOR MOISTURE -DENSITY RELATIONS OF SOIL AND SOIL- AGGREGATE <br />MIXTURES, USING 5.5 -LB (2.49 KG) RAMMER AND 12 -IN, (305 MM) DROP, <br />3. ASTM D 1556 - TEST METHOD FOR DENSITY OF SOIL IN PLACE BY THE SAND -CONE METHOD. <br />4. ASTM D 1557 - TEST METHOD FOR MOISTURE -DENSITY ELEVATIONS OF SOILS AND SOIL -AGGREGATE <br />MIXTURE USING 10 POUND (4.54 KG) RAMMER AND 18 INCH (457 MM) DROP, <br />5. ASTM D 2167 - TEST METHOD FOR DENSITY AND UNIT WEIGHT OF SOIL IN PLACE BY THE RUBBER <br />BALLOON METHOD, <br />6. ASTM D 4254 - TEST METHODS FOR MINIMUM INDEX DENSITY OF SOILS AND CALCULATION OF RELATIVE <br />DENSITY. NEPA 70 - NATIONAL ELECTRIC <br />7. NADONAL FIRE PROTECTION ASSOCIATION (NFPA) CODE. <br />1.3 DEFINITIONS <br />A A BUILDING AREA SUBGRADE PAD: PORTION OF SITE DIRECTLY BENEATH AND WITHIN A UNE 5 FEET 0 <br />INCHES BEYOND BUILDING AND APPURTENANCES INCLUDING LIMITS OF ANY FUTURE BUILDING EXPANSION <br />AREAS INDICATED ON DRAWINGS, APPURTENANCES ARE THOSE ITEMS ATTACHED TO THE BUILDING <br />PROPER. <br />1.4 QUALITY ASSURANCE <br />A REGULATORY REQUIREMENTS: <br />A.1. PERFORM EARTKWORK IN ACCORDANCE WITH APPUCABLE REQUIREMENTS OF GOVERNING AUTHORITIES <br />HAVING JURISDICTION. <br />B. SOIL STABILIZATION STANDARDS: STATE DEPARTMENT OF TRANSPORTATION STANDARD SPECIFICATIONS. <br />1.5 PROJECT CONDITIONS OR SITE CONDITIONS <br />A EXISTING CONOMONS: <br />At. CLASSIFICATION OF EXCAVATIONS: CONTRACTOR BY SUBMITTING BID ACKNOWLEDGES THAT <br />CONTRACTOR HAS INVESTIGATED PROJECT SITE TO DETERMINE TYPE, QUANTITY, QUALITY. AND <br />CHARACTER OF EXCAVATION WORK TO BE PERFORMED. CONSIDER EXCAVATION UNCLASSIFIED <br />EXCAVATION, <br />A.2. EXISTING UTILITIES: CONTACT LOCAL UTILITY COMPANIES AND MAKE ARRANGEMENTS TO OBTAIN <br />UTILITY COMPANY LOCATION AND MARKING SERVICE PRIOR TO START OF EARTHWORK OPERATIONS, <br />A201 LOCATE EXISTING UNDERGROUND UTILITIES IN AREAS OF WORK. IF UTILITIES ARE TO REMAIN IN <br />PLACE, PROVIDE MEANS OF SUPPORT AND PROTECTION DURING EARTHWORK OPERATIONS, <br />A.2.b. SHOULD UNCHARTED, OR INCORRECTLY CHARTED, PIPING OR OTHER UTILITIES BE ENCOUNTERED <br />DURING EXCAVATION, CONSULT UTILITY COMPANY AND OWNER REPRESENTATIVE IMMEDIATELY FOR <br />DIRECTIONS. <br />A2.c. COORDINATE WITH OWNER AND UTILITY COMPANIES TO KEEP EXISTING UTILITY SERVICES AND <br />FACILITIES IN OPERATION. <br />A2.6, REPAIR DAMAGED UTILITIES TO SATISFACTION OF UTILITY COMPANY, AT NO ADDITIONAL COST TO <br />OWNER. <br />A2.e. DO NOT INTERRUPT EXISTING UTILITIES SERVING FACILITIES OCCUPIED AND USED BY OWNER OR <br />OTHERS, DURING OCCUPIED HOURS, EXCEPT WHEN PERMITTED IN WRITING BY OWNER'S <br />REPRESENTATIVE AND THEN ONLY AFTER ACCEPTABLE TEMPORARY UTILITY SERVICES HAVE BEEN <br />PROVIDED AND APPROVED BY OWNER'S REPRESENTATIVE. <br />A2. f. DEMOLISH AND COMPLETELY REMOVE FROM SITE EXISTING UNDERGROUND UTILITIES INDICATED ON <br />DRAWINGS TO BE REMOVED. COORDINATE WITH UTILITY COMPANIES FOR SHUT-OFF OF SERVICES <br />IF LINES ARE ACTIVE, <br />PART 2 PRODUCTS <br />2.1 FERIAS <br />A EXISTING MATERIAL,, EXCAVATED AND RE -USED ON-SITE MATERIAL FOR SUBSOIL FILL AS SPECIFIED <br />HEREIN. <br />B. IMPORTED MATERIAL IMPORTED OFF-SITE MATERIAL APPROVED BY OWNER'S REPRESENTATIVE AND AS <br />SPECIFlED HEREIN. <br />C. BEDDING MATERIAL: PROCESSED SAND AND GRAVEL FREE FROM CLAY LUMPS, ORGANIC. OR OTHER <br />DELETERIOUS MATERIA AS SPEOFIED ON THE DRAWINGS, <br />D. TOPSOIL FILL: SPECIFIED IN SECTION 02100. <br />7. e01 STABILIZATION MA HIAI c <br />A. QUICKLIME OR HYDRATED LIME: ASTM C 977. <br />B. PORTLAND CEMENT: ASTM C ISM <br />C. RY ASH: ASTM C GIB. <br />PART 3 EXECUTION <br />J.1 PREPARATION <br />A. IDENTIFY REQUIRED LINES, ELEVATIONS, LEVELS, CONTOURS, GRADES, AND DATUM NECESSARY TO <br />PROVIDE EARTHWORK GRADING AS INDICATED ON DRAWINGS, <br />B. VERIFY THAT SURVEY BENCHMARK AND INTENDED ELEVATIONS FOR WORK ARE AS INDICATED ON <br />DRAWINGS, <br />C. LOCATE, IDENTIFY, AND PROTECT EXISTING UTILITIES TO REMAIN AND PREVIOUSLY INSTALLED UTILITIES <br />THAT MAY BE DAMAGED BY CONSTRUCTION OPERATIONS, <br />C.1. 1, NOTIFY OWNER'S REPRESENTATIVE AND UTILITY COMPANY IMMEDIATELY OF UTILITIES, NOT INDICATED <br />ON DRAWINGS, ENCOUNTERED, <br />F2. 2, MAINTAIN EXISTING UTNTIES, ACTIVE UTILITIES, AND DRAINAGE SYSTEMS IN OPERATING CONDITION, <br />C.3. 3. COMPLY WITH UTILITY COMPANY REQUIREMENTS AND DIRECTIONS OF OWNER'S REPRESENTATIVE TO <br />KEEP UTILITIES IN OPERATION, <br />C.I. 4, WHERE UNMARKED UTIUTIES ARE UNCOVERED WITHIN THE WORK AREA, NOTIFY BP AND THE <br />UTILITIES HAVING JURISDICTION, AND TAKE PRECAUTIONS TO PREVENT INTERRUPTION OF SERVICE, <br />SHOULD SUCH LINES OR SERVICES BE DAMAGED, BROKEN OR INTERRUPTED THROUGH NEGLIGENCE, <br />D. PROTECT TREES, LAWNS, PLANT LIFE, FENCES, EXISTING STRUCTURES, SIDEWALKS, PAVING, AND CURBS <br />FROM EARTHWORK OPERATIONS, EXCAVATING EQUIPMENT, AND VEHICULAR TRAFFIC. <br />E. PROTECT BENCHMARKS, PROPERTY CORNERS, AND OTHER SURVEY MONUMENTS FROM DAMAGE OR <br />DISPLACEMENT. WHERE MARKERS ARE REQUIRED TO BE REMOVED, PROVIDE REMOVAL AND <br />REINSTALLATION BY LICENSED LAND SURVEYOR LICENSED M STATE WHERE PROJECT IS LOCATED, <br />F. REMOVE MATERIAL ENCOUNTERED IN GRADING OPERATIONS THAT IS UNSUITABLE FOR BACKFILLING, <br />SUBGRADE OR FOUNDATION PURPOSES AS DETERMINED BY OWNER'S REPRESENTATIVE DISPOSE OF <br />MATERIA$ OFF-SITE IN AN APPROVED MANNER IN ACCORDANCE WITH REQUIREMENTS OF AUTHORITIES <br />HAVING JURISDICTION, <br />aa_ <br />FXfAVA71 N <br />A PROVIDE DEWATERING, DRAINAGE, AND GROUND WATER MANAGEMENT TO CONTROL MOISTURE OF SOILS <br />WHEN PERFORMING GRADING OPERATIONS DURING PERIODS OF WET WEATHER. <br />B. PREVENT SURFACE WATER AND SUBSURFACE OR GROUND WATER FROM FLOWING INTO EXCAVATIONS AND <br />FROM FLOODING PROJECT SITE AND SURROUNDING AREA. DO NOT ALLOW WATER TO ACCUMULATE IN <br />EXCAVATIONS. ANY WATER SUSPECTED OF BEING CONTAMINATED 15 TO BE BROUGHT TO THE ATTENTION <br />OF THE DESIGN ENGINEER AND BP. REMOVE WATER TO PREVENT SOIL CHANGES DETRIMENTAL TO <br />STABILT V OF SUBGRADES, PROVIDE AND MAINTAIN PUMPS, WELL POINTS, SUMPS, SUCTION AND <br />DISCHARGE UNES, AND OTHER DEWATERING SYSTEM COMPONENTS NECESSARY TO CONVEY WATER AWAY <br />FROM EXCAVATIONS, ESTABLISH AND MAINTAIN TEMPORARY DRAINAGE DITCHES AND OTHER DIVERSIONS <br />OUTSIDE EXCAVATION LIMITS TO CONVEY RAIN WATER AND WATER REMOVED FROM EXCAVATIONS TO <br />COLLECTING OR RUN-OFF AREAS, DO NOT USE TRENCH EXCAVATIONS AS TEMPORARY DRAINAGE DITCHES. <br />MAINTAIN WATER ON SITE, IF REQUIRED BY THE LOCAL AUTHORITY, C. SHORE, ERACE, AND DRAIN EXCAVATIONS TO MAINTAIN EXCAVATIONS SAFE, SECURE, AND FREE OF WATER <br />AT ALL DYES. <br />D. PROYIDE PROTECTION FOR WORKERS WITHIN TRENCH AREAS IN ACCORDANCE WITH LOCAL STATE, AND <br />FEDERAL OSHA REQUIREMENTS AND REGULATIONS, D.I. 1. SLOPE. SHORE. SHEET, OR BRACE EXCAVATION SIDE WALLS GREATER THAN 5 FEET IN DEPTH. <br />D. 2. PROVIDE LATERAL TRAVEL DISTANCE TO EXCAVATION EXIT LADDER OR STEPS MAXIMUM 25 FEET <br />FOR TRENCHES MINIMUM 4 FEET IN DEPTH, E. ACCEPTABLE FILL MATERIAL: <br />E.1. 1. ROOK OR STONE LESS THAN 6 INCHES IN LARGEST DIMENSION AS FILL TO WITHIN 24 INCHES OF <br />SURFACE OF PROPOSED SUBGRADE WHEN MIXED WITH SUITABLE MATERIAL, E. 2. ROCK OR STONE LESS THAN 2 INCHES IN LARGEST DIMENSION MIXED WITH SUITABLE MATERIAL <br />AS FILL WITHIN THE UPPER 24 INCHES OF PROPOSED SUBGRADE. <br />F. STOCNPI:E EXCAVATED MATERIAL SUITABLE FOR BACKFILLING ON-SITE, 4 EXCAVATE SUBSOIL REQUIRED FOR FOUNDATIONS, CONSTRUCTION OPERATIONS, AND OTHER WORK. <br />EXCAVATE FOUNDATIONS TO A DEPTH INDICATED ON THE DRAWINGS OR AS DEEP AS REQUIRED TO <br />ATTAIN PROPER SOIL BEARING PRESSURE, OR MEET GOVERNING CODES, DEEPER FOUNDATIONS WILL BE <br />APPROVED, IN WRITING, BY BP, STOCKPILE SUFFICIENT CLEAN APPROVED SOIL MATERIALS FOR ALL <br />BACKFILLING OR GRADING WORK, MACHINE SLOPE BANKS TO ANGLE OF REPOSE OR LESS UNTIL <br />SHOOED. AS REQUIRED BY ALL CURRENT OSHA STANDARDS, DO NOT ALLOW EXCAVATION TO INTERFERE <br />WITH NORMAL 45 DEGREE BEARING SPLAY OF ANY FOUNDATION, HAND HAND CORRECT UNAUTHORIZED <br />EXCAVATION AT NO COST TO BP, <br />H. DURING EXCAVATION* STOCKPILE MATERIALS SUITABLE FOR BACKFILLING AWAY FROM EXCAVATION TO <br />PREVENT OVERLOADING. SLOES, OR CAVE-INS. <br />I. REMOVE MATERIAL ENCOUNTERED IN EXCAVATING OPERATIONS THAT IS UNSUITABLE FOR BACKFILLING, <br />SUBGRADE OR FOUNDATION PURPOSES AS DETERMINED BY OWNER'S REPRESENTATIVE, DISPOSE OF <br />MATERJILS OFF-SITE IN AN APPROVED MANNER IN ACCORDANCE WITH REQUIREMENTS OF AUTHORITIES <br />HAYING JURISDICTION, <br />J. OVER EXCAVATE AREAS OF BUILDING SUBGRADE FOUND CONSISTING OF UNSUITABLE MATERIALS AS <br />DETERMINED BY OWNER'S REPRESENTATIVE, PREPARE, FILL WITH SUITABLE MATERIAL, AND COMPACT AS <br />SPECIFlED. <br />K. NAND CORRECT UNAUTHORIZED EXCAVATION AT NO COST TO BP, FILL OVER -EXCAVATED AREAS UNDER <br />STRUCTURE BEARING SURFACES BY EMENDING INDICATED BOTTOM ELEVATION OF FOOTING OR BASE TO <br />EXCAVATION BOTTOM WITHOUT CHANGING TOP ELEVATION OR BY FILLING UNAUTHORIZED EXCAVATION <br />WITH 3000 PSI CONCRETE. STOCKPILE EXCAVATED MATERIAL IN AREA DESIGNATED ON-SRE OR WHERE <br />DIRECTED AND REMOVE EXCESS SUBSOIL NOT BEING REUSED, FROM SITE, L IN THE EVENT THAT SOLID ROCK OR OTHER UNEXPECTED MATERIALS, OVER ONE CUBIC YARD IN <br />VOLUME, ARE ENCOUNTERED, EXTRA COST WILL BE ALLOWED AFTER WRITTEN APPROVAL BY OWNER OR <br />OWNER'S REPRESENTATIVE. EXTRA COST WILL FOLLOW UNIT PRICES QUOTED IN THE CONTRACTOR'S BID, <br />WITH QUANTITIES TO BE APPROVED BY OWNER OR OWNER'S REPRESENTATIVE, M. CONFORM EXCAVATIONS FOR PIPING TO UMRS, DEPTHS, AND MATERIALS INDICATED ON THE DRAWINGS, <br />AND TO APPLICABLE CODES AND REGULATIONS. <br />N. DESDN AND PROVIDE SHEETING, SHORING, OR BRACING AT ANY OPEN TRENCH. COMPLY WITH OSHA AND <br />OTHER LOCAL REGULATIONS FOR TRENCHING REQUIREMENTS. <br />0. EXCAVATE SUBSOIL REQUIRED TO INSTALL UNDERGROUND PIPING AND UTILITIES. WHERE INSTALLING PIPE <br />OR CONDUIT, EXCAVATE OR REMOVE ROCK TO SIX INCHES BELOW THE REQUIRED ELEVATION, BACKFILL <br />WITH CRUSHED STONE OR GRAVEL. HAND TRIM FOR BELL AND SPIGOT PIPE JOINTS, REMOVE EXCESS <br />SUBSOIL NOT BEING REUSED FROM SITE, SUPPORT PIPE DURING PLACEMENT. BACKFILL <br />SYSTEAIATCALLY, AS EARLY AS POSSIBLE, TO ALLOW MAXIMUM TIME FOR NATURAL SETTLEMENT. DO NOT <br />BACKFILL TRENCHES UNTIL TESTING THAT 15 REQUIRED BY APPLICABLE CODES HAS BEEN CONDUCTED <br />ANO APPROVED, <br />P. BACKFILL FDR UNDERGROUND STORAGE TANKS IS SPECIFIED ON THE TANK INSTALLATION DRAWINGS, <br />0. PRODUCT PIPING AND VENT LINES: LAY PIPING AND VENT LINES SUPPORTED CONTINUOUSLY ON A SIX <br />INCH PRODUCT PIPING AND VENT LINES COMPACTED BEDDING OF CLEAN SAND OR PEA GRAVEL, DO <br />NOT SUPPDRI PIPING ON BLOCKS OR PLANKS, BACKFILL COMPLETELY TO THE UNDERSIDE OF PAVING <br />WITH CLEAN SAND OR PEA GRAVEL DO NOT USE SAND IN CONJUNCTION WITH FILTER FABRIC, <br />COMPACT PACKFlLL BY MANUAL OR POWER TAMPING TO OBTAIN THE REQUIRED COMPACTION, REFER TO <br />PIPING DETAIL ON THE TANK INSTALLATION DRAWING, LAY CONDUIT ON A FOUR INCH COMPACTED <br />BEDDING OF ELECTRICAL CONDUIT <br />R. CLEAN SAND OR PEA GRAVEL ENVELOPE ALL CONDUITS IN SAND OR PEA GRAVEL CONTINUE <br />DACKFlLUNG WITH SAND OR PEA GRAVEL TO A DEPTH OF FOUR INCHES ABOVE THE TOP OF HE <br />CONDUIT. DO NOT USE SAND IN CONJUNCTION WITH FILTER FABRIC, VOIDS BETWEEN CONDUITS WILL <br />NOT BE PERMITTED. CLEAN EARTH MAY BE SUBSTITUTED FOR SAND WHEN THE TRENCH CONTAINS ONLY <br />ONE CONDJIT, <br />S. COMPRESSED AIR AND POTABLE WATER PIPING: LAY PIPING ON A FOUR INCH COMPACTED BEDDING OF <br />CLEAN COMPRESSED AIR AND POTABLE WATER PIPING SAND OR PEA GRAVEL, CONTINUE SAND BACKFILL <br />TOA DEPTH OF FOUR INCHES ABOVE THE TOP OF THE PIPE, T. SEWER PIPNG: LAY SEWER PIPING SUPPORTED CONTINUOUSLY ON A SIX INCH COMPACTED BEDDNG OF <br />GRAVEL SEWER PIPING OR CRUSHED STONE OF WHICH 100 PERCENT WILL PASS THROUGH A 1/2 INCH <br />SIEVE. SHAPE BEDDING FOR CLEARANCE OF ALL JOINTS AND FITTINGS, TAMPED IN PLACE, AND GRADED <br />EVENLY TO ENSURE A UNIFORM BEARING FOR THE FULL LENGTH OF THE PIPE, DO NOT SUPPORT <br />PIPING BY BLOCKS, PLANKS, OR MOUNDS OF BEDDING MATERIAL <br />U. BALKFlLLUAG TRENCHES: <br />U.I, i. PULE BACKFILL FROM 12 INCHES ABOVE THE PIPE, IN LAYERS NOT TO EXCEED EIGHT INCHES IN <br />DEPTH. PROVIDE GRANULAR BACKFILL MATERIAL FREE OF STONES LARGER THAN THREE INCHES IN <br />OMMETDR, NON -CORROSIVE, AND NON- ORGANIC IN NATURE, DO NOT USE MATERIAL WITH <br />CINDERS, BUILDING MATERIALS, WASTE, OR RUBBISH, DO NOT USE FROZEN OR SEMI -FROZEN <br />BACWLL MATERIALS, U.Z. 2. DO NOT BACKFILL TRENCHES UNTIL FIELD INSPECTIONS AND TESTS ARE PERFORMED AND UTILITY <br />SYSTEAS COMPLY WITH AND ARE ACCEPTED BY GOVERNING AUTHORITIES HAVING JURISDICTION. <br />U.3. 3. BACKFILL EXCAVATION AFTER PIPE OR CONDUIT HAS BEEN INSTN.LEO, BEGGED, INSPECTED AND <br />TESTED <br />U.4. 4. CONTRACTOR 15 TO ADJUST ANY UTILITY ELEMENT MEANT TO BE FLUSH WITH GRADE (CLEAN OUT <br />MANHOES, CATCH BASINS, INLETS, ETC.) THAT IS AFFECTED BY SITE WORK OR GRADE CHANGES <br />WETHER SPECIFICALLY NOTED ON PLANS OR NOT. <br />3.3. [OMPACTON: <br />A BEFORE CCMPACTION, MOISTEN OR AERATE EACH LAYER OF BACKFILL AS REQUIRED TO OBTAIN OPTIMUM <br />MOISNRE CONTENT 70 ATTAIN REQUIRED COMPACTION DENSITY. CINDERS, ASHES, ORGANIC MATTER, <br />RUBBISH, OR OTHER DELETERIOUS MATERIALS WILL NOT BE PERMITTED, B. PLACE FILL IN LAYERS NOT MORE THAN EIGHT INCHES IN LOOSE DEPTH, ROLL AREAS WITH SOILS <br />CONTAINING CLAY OR SILT (COHESIVE SOILS) UNDER PAVING AND BUILDINGS WITH A SHEEPS FOOT <br />ROLLER. COMPACT FILL WITH COHESIVE MATERIALS TO A DENSITY EQUAL TO 95 PERCENT OF STANDARD <br />PROCTOR DENSITY AS DETERMINED BY ASTM D 690. DETERMINE FIELD DENSITY FOR COHESIVE SOILS <br />BY THE SAND CONE METHOD FOLLOWING ASTM D 1556, C. ROLL AREAS WITH SOILS CONTAINING SAND AND GRAVEL (COHESIONLESS SOILS) UNDER PAYING AND <br />BUILDINGS WITH EITHER A THREE WHEEL TEN TON VIBRATORY ROLLER OR SEVEN TON TRACTOR, <br />COMPACT FDL WITH COHESIONLESS SOILS TO A DENSITY EQUAL TO 65 PERCENT OF RELATIVE DENSITY <br />AS DETERMINED BY ASTM D 4254, DETERMINE FIELD DENSITY FOR COHESIONLESS SOILS BY THE <br />RUBBER BALLOON METHOD FOLLOWING ASTM D 2167. <br />SA SRE fFAhNO <br />A EXCAVATE PAVEMENT AREAS TO LINE AND GRADE INDICATED ON DRAWINGS, B. STOCKPoLE EXCAVATED MATERIAL SUITABLE FOR BACKFILUNG ON-SITE, C. REMOVE MATERIAL ENCOUNTERED IN EXCAVATING OPERATIONS THAT IS UNSUITABLE FOR BACKFILLING AND <br />PAVEMENT SUBGRADE PURPOSES AS DETERMINED BY OWNER, DISPOSE OF MATERIALS OFF-SITE IN AN <br />APPROVED MANNER IN ACCORDANCE WITH REQUIREMENTS OF AUTHORITIES HAVING JURISDICTION. <br />D. OVER EXCAVATE AREAS OF PAVEMENT SUBGRADE FOUND CONSISTING OF UNSUITABLE MATERIALS AS <br />DETERMINED BY OWNER'S REPRESENTATIVE, PREPARE, FILL WITH SUITABLE MATERIAL, AND COMPACT AS <br />SPEDIFlED, <br />E. FILL MEAS TO CONTOURS AND ELEVATIONS AS INDICATED ON DRAWINGS, <br />F. PNCE FILL IN CONTINUOUS LIFTS AS SPECIFIED HEREIN, <br />C. VERIFY THAT IMPORTED OFF-SITE FILL AND STOCKPILED ON-SITE FILL IS TESTED AND APPROVED, <br />H. VERIFY THAI BACKFILL MEAS ARE FREE OF DEBRIS, SNOW, ICE, OR WATER, AND THAT GROUND <br />SURFACES ARE NOT FROZEN. <br />I. REMOVE ALL DEBRIS FROM MEAS TO BE LANDSCAPED TO A DEPTH OF TWO FEET. BACKFILL WITH CLEAN <br />SOIL 70 A DEPTH WITHIN SIX INCHES OF THE FINISHED GRADE, BACKFILL TO SIX INCHES BELOW TOP <br />Oi EXISTING CURBS. <br />J. UNIFORMLY COMPACT BACKFILL AND GRADE AREAS TO INDICTED SLOPE WITH A TOLERANCE OF 1/4 <br />INCH ABOVE OR BELOW INDICATED ELEVATIONS. <br />K. BACKFIWNC: <br />K.I. 1. VERIFY IMPORTED FILL AND STOCKPILED FILL TO BE <br />K.2. 2. IF, IN THE OPINION OF BP, UNSATISFACTORY SOLI 1 <br />AS tALnvnitu UN <br />E%CEEOING 12 INCHES AND MOISTENED ONLY AS REQUIRED TO OBTNN THE SPECIFIED <br />AHE <br />BRE, FREE FROM DEBRIS, <br />MUCK OR PEAT CAPABLE OF BEING <br />COMPACTED <br />WHERE ADDITIONAL <br />FILL <br />MATERIAL IS <br />REQUIRED, <br />THE SITE. INSTALL <br />FILL <br />MATERIAL IN <br />LAYERS NOT <br />DEGREE OF <br />COMPACTION. PROVIDE COARSE SAND EE BANK RUN GRAVEL FILL UNDER PAVING AND SIDEWALKS. <br />L VEPoFY AREAS TO BE BACKFILLED ARE FREE OF DEBRIS, SNOW, ICE, OR WATER, AND GROUND SURFACES <br />ARE NOT FROZEN. <br />3.5 Sol[ <br />TABn RATION <br />A MO MATERIALS IN ACCORDANCE WITH REFERENCED STATE DEPARTMENT OF TRANSPORTATION STANDARD <br />SPECIFICATIONS OR AS INDICTED IN THE REPORT OF SUBSURFACE EXPLORATION FOR AREAS OF <br />APPUGIDN. <br />B. CARE ADD WATER 70 THE MIX TO ACHIEVE A CONSISTENT MIXTURE WITHOUT LUMPING YET NOT <br />CREATE A WET PLASTIC CONSISTENCY, <br />C. THE ADDITION OF MME MAY BE SPECIFIED OR APPROVED TO FACIUTATE MIXING FLY ASH WDLL SOIL <br />MATERMlS. WHEN SPECIFIED, OR DIRECTED BY THE TESTING LABORATORY IN WRITING, LIME SHALL BE <br />USED TO PREVENT FLY ASH 'FLASH SET' OR RETARD SOIL -FLY ASH REACTIVITY OCCURRING DURING <br />FINAL NI%TNG. <br />C, 1, 1. LIME ADDITIVE SHALL BE UNIFORMLY BLENDED WITH THE FLY ASH ON THE SURFACE FOR <br />IN WITH SOIL MATERIALS WRING FIRST MIXING OPERATIONS UNLESS OTHER METHODS <br />OF APPLICATION ARE APPROVED, <br />C.2. 2. THE PROPORTION OF UME ADDITIVE WITH THE FLY ASH WILL BE BASED ON LABORATORY TESTING <br />AN FIELD TRIAL PROCEDURES NECESSARY TO DETERMINE PROPER SOIL MODIFICATION, <br />C.3. 3. THE ADDITION OF LIME WLL PERMIT A REDUCTION OF THE FLY ASH REQUIREMENT ON A <br />REPUCEMEN7 BASIS AS APPROVED BY THE TESTING LABORATORY, <br />D. OBTAIN TESTING LABORATORY APPROVAL OF THE MIX BEFORE PROCEEDING WITH PLACEMENT. <br />XIS Il.l NAN OF S B ADE <br />A VERIFY FINISHED SUBGRADES FOR CONFORMANCE TO ELEVATIONS AS INDICATED ON DRAWINGS AND FOR <br />SPECIFlED CONOMONS FOR SUBGRADE. <br />B. PROTECT SUBGRADE FROM EXCESSIVE WHEEL LOADING DURING CONSTRUCTION, INCLUDING CONCRETE <br />TRUCKS AND DUMP TRUCKS, <br />C. REMOVE AREAS OF FINISHED SUBGRADE WITH COMPACTION DENSITY BELOW SPECIFIED DENSITY TO DEPTH <br />REQUIRED. FILL REMOVED AREAS AND COMPACT TO SPECIFIED COMPACTION DENSITY D PROVIDE <br />SURFACE OF SUBGRADE AFTER COMPACTION HARD, UNIFORM, SMOOTH, STABLE, AND TRUE TO GRADE <br />AND CRO55-SECTION. <br />.R.7 FINISH RADIN. <br />A. GRADE AREAS OTHER THAN PAVED AREAS AND BUILDING PAD AREAS TO FINISH GRADE ELEVATIONS OR <br />CONTOURS AS INDICTED ON DRAWINGS INCLUDING THE FOLLOWING: <br />A.I. EXCAVATED AREAS, <br />A.2. FILLED AND TRANSITION AREAS. <br />A.3. LANDSCAPED AREAS, <br />B. PROVIDE ENGINEERING AND FIELD STAKING NECESSARY FOR VERIFICATION OF LINES, GRADES, AND <br />ELEVATIONS. <br />C. PROVIDE FINISH GRADED AREAS UNIFORM AND SMOOTH, FREE FROM ROCKS, DEBRIS, OR IRREGULAR <br />SURFACE CHANGES WITH MAXIMUM TOLERANCE OF 0.10 FOOT IN 50 FEET ABOVE OR BELOW <br />ESTABLISHED FINISH SUBGRADE ELEVATION, PROVIOE GRADED SURFACES SLOPING UNIFORMLY BETWEEN <br />INDICTED ELEVATIONS. <br />D. PROVIDE DRAINAGE DITCHES GRADED WITH UNIFORM SLOPE TO ALLOW DRAINAGE WITHOUT PONDING, <br />MINIMIZING POTENTIAL FOR EROSION. <br />3.8 PROTECTION <br />A PROTECT DUILDING SUBGRADE PAD AND BUILDING RELATED EARTHWORK FROM DAMAGE BY CONSTRUCTION <br />OPERATIONS AND EROSION, <br />B. PROHIBIT VEHICLES FROM ENTERING BUILDING SUBGRADE PAD AREA VEHICLES NOT PERMITTED. <br />C. SCARIFY SURFACE, RESHAPE, AND COMPACT AREAS DAMAGED BY CONSTRUCTION OPERATIONS OR <br />ANOTHER EROSION. <br />SAFETY <br />PREPARE A WRffTEN SITE SAFETY <br />POIFRiVl IMZAPOS PREVENTIVE <br />PUN <br />DETAOJNC HOW THE <br />POTENTIAL HAZARDS LISTED BELOW <br />WILL BE ADDRESSED <br />AND POST ON THE WORNSI7E, <br />INSURE <br />COMPLIANCE BY ALL <br />EMPLOYEES OF CONTRACTOR AND <br />O HIS <br />SUBCONTRACTORS. <br />SAFETY NETS, AND/OR FALL ARRESTOR, IF CONVENTIONAL SYSTEMS ARE <br />TATA INJURIES. <br />NOT FEASIBLE, USE SITE FALL PROTECTION PIAN. <br />MEASURES <br />AUTOMOBILE OR VEHICLE TRAFFIC AT <br />TRAFFIC PATTERNS CONTROL VEHICLE ACCESS <br />U.G. <br />ACTIVE 91ES <br />HIGHWAYBARRIERS. <br />HIGHWAY BARRIERS SET OUT EDRAN(A)(1) E WARNING CONES' IF <br />NEC <br />NECESSARY. gEF:,GENEgAL DUTY 5(A)(I) <br />FALLS FROM WORKING AT <br />PROVIDE CONVENTIONAL FALL PROTECTION SYSTEMS, E.C. GUARDRAILS <br />ELEVATION CAUSING SERIOUS OR <br />SAFETY NETS, AND/OR FALL ARRESTOR, IF CONVENTIONAL SYSTEMS ARE <br />TATA INJURIES. <br />NOT FEASIBLE, USE SITE FALL PROTECTION PIAN. <br />REF; 29CFRI295.451 k 502 <br />CAVE-INS FROM EXCAVATIONS [a> 4 <br />UNIT AND CONTROL PERSONAL ENTRY CONTROL BY SHORING, SLOPING <br />FT.1 RESULTING IN WORKERS BEING <br />OR BENCHING THE SIDES, USE TRENCH BOX OR SHIELD, PROPER <br />BURIED OR CRUSHED. KNOWN TO <br />MAINTENANCE OF SHORING. PERIODIC FIELD INSPECTIONS <br />RESULT IN SUFFOCATION AND DEATH <br />REF: 29OR1925,651 <br />FALLS INTO EXCAVATIONS OR <br />TRENCHES, 4A7EWALS, TOOLS, ROCK, <br />PROVIDE SAFE MEANS O' ACCESS AND EGRESS, E.D STRUCTURAL <br />SOL, ETC., PLACEO TOO NEAR THE <br />RAMPS, PLACE ALL MATERIALS AT LEAST 2 FEET AWAY FROM THE EDGE <br />EDGE AND FALLING INTO THE <br />OF THE EXCAVATION OR TRENCH. REF: 29CFRI926.651 <br />EXCAVATION OR TRENCH, <br />ELECTRICAL SHOCK FROM HAND <br />TpOLS, FRAYED ELECTRICAL MIRING, <br />INSPECT HAND TOOLS FOR DAMAGED OR FRAYED WIRING. DEEHERGIZE <br />OPEN CONDDIT/BOXES <br />,AND GROUND OR INSULATE REF:. 29CFR1926.415, 417 t 951 <br />OXYGEN DEFICIENT, TOXIC, FLAMMABLE <br />EVALUATE AND REMOVE CONTAINMENT, VENTILATE THE SPACE, USE <br />OR IRRITATING ATMOSPHERE. <br />PROPER PERSONAL PROTECTIVE EQUIPMENT. <br />REF: 29CFRI926.21 t 651; 1910.132 t 146 <br />FlRE/EXPl090N CAUSED BY WELDING <br />FLUSH AND CLEAN TANK OR LINES TEST FOR FLAMMABLE/COMBUSTIBLE <br />OR CUTTING ON OR AROUND FINISHED <br />ATMOSPHERE, ENSURE THE TANK OR LINE IS VENTED TO AVOID <br />PRODUCT TANK UNES <br />PRESSURE BUILD UP FROM THE HEAT. <br />REF; 29CFR1926.352 <br />INFORM EMPLOYEES OF THE CHEMICAL IN THEIR WORKPLACE AND <br />HAZARDS USE MSOS KNOW THE LOCATION O PRODUCT TANKS AND <br />ACOOENTAL RELEASE OF FINISHED <br />LINES UNDERSTAND THE HAZARDS OF PETROLEUM PRODUCTS AND <br />PRODUCTS AND EMPLOYEE EXPOSURE <br />METHODS TO PREVENT EXPOSURE, INCLUDING PPE UNDERSTANDING <br />EMERGENCY REPORTING AND RESPONSE REOUIREMENTS. <br />REF; 29CFR1926.59 (APPN A t B] <br />EXCAVATIO EQUIPMENT AND <br />ONLY TRAINED AND/OR AUTHORIZED OPERATORS PROVIDE BARRICADES <br />MACHINERY. <br />WITH UGHTS OR REFLECTORS EQUIPPED WITH AUDIBLE BACK-UP ALARM <br />REF: 29OR1926ADO t 602 <br />HEAD INJURIES DUE TO MATERIALS <br />FALLING FROM OVERHEAD, FOOT <br />INJURIES FpOM NAILS RUN THROUGH <br />ASSESS THE WORKSITE FOR THE HAZARDS SHOWN. PROVIDE PPE BASED <br />SHOES BAOK INJURIES FROM GENERAL <br />O! THE HAZARD ASSESSMENT, TRAIN EMPLOYEES ON THE PROPER USE <br />LIFTING REQUIgEMENTS EXPOSURE TO <br />OF PPE REF 29CFR1926,95 t 96 <br />HARSH HEATHER CONDITIONS <br />