Laserfiche WebLink
SECTION 02510 -ASPHALT PAVING <br />PART 1 - GENERAL <br />I.I DESCRIPTION <br />A All WORK UNDER THIS SECTION IS SUBJECT TO THE CONTRACT DOCUMENTS, <br />8. FURNISH ALL LABOR, MATERIALS, EQUIPMENT, LAYOUT AND SUPERVISION NECESSW <br />TO COMPLETE ALL ASPHALT PAVING <br />C. REFER TO DRAWINGS, SCHEDULES AND DETAILS FOR TYPE AND LDCATION OF <br />ASPHALT WORK REQUIRED. <br />0. COORDINATE WITH OTHER TRADES. <br />E. ASPHALT PROVIDER SHILL BE A REGISTERED AND APPROVED PAVING MIK <br />MANUFACTURER WITH THE DEPARTMENT OF TRANSPORTATION AND HIGHWAYS OF THE <br />STATE IN WHICH THE PROJECT IS LOCATED, <br />F. ALL REFERENCES HEREIN TO STATE HIGHWAY SPECIFICATIONS INDICATE THE STATE <br />HIGHWAY OR DEPARTMENT OF TRANSPORTATION DEPARTMENT OF THE STATE IN <br />WHICH THE PROJECT IS LOCATED. <br />12 QUALITY ASSURANCE <br />AB. OWNER <br />MAY HIRE INDEPENDENT TESTING FIRM TO PERFORM THICKNESS TESTS. <br />THICKNESS AND TOLERANCESFOR SMOOTHNESS SHWA BE AS SPECIFlED IN SE <br />CTION <br />101 OF THIS DOCUMENT, <br />C. PAYING CONTRACTOR WILL PROVIDE TO THE OWNER ORM OF 'TRI OF THE , AND MI <br />AND DUALITY OF THE SPECIFIED MATERIAL IN THE FORM OF TRIP TICKETS, AND MIX <br />CERTIFICATIONS, <br />D. PROVIDE COPY OF MANUFACTURER'S DESIGN MIK FORMULA TO OWNER, <br />PMT 2 - PRODUCTS <br />2.1 MATERIALS <br />A BASE AGGREGATE: PROVIDE CLEAN. HMD, DURABLE CRUSHED LIMESTONE OR <br />CRUSHED AIR-COOLED BUST FURNACE SLAG HAVING AT LEAST 95 PERCENT <br />PASSING A 1 1/2 INCH SIEVE AND NOT MORE THAN 8 PERCENT PASSING A N0. <br />200 SIEVE OR CONFORMING TO STATE DOT REQUIREMENTS, FURNISH AGGREGATE <br />WEIGHING NOT LESS THAN 90 POUNDS PER CUBIC FOOT FOR LIMESTONE AND FOR <br />CRUSHED SLAG WHEN SHAKEN TO REFUSAL. <br />B. COARSE AGGREGATE: SOUND; ANGULAR CRUSHED STONE; CRUSHED GRAVEL; <br />COMPLYING WITH ASTM D 692. <br />C. FINE AGGREGATE SHARP -EDGED NATURAL SAND OR SAND PREPARED FORM STONE; <br />GRAVEL OR COMBINATIONS THEREOF; COMPLYING WITH ASTM 0 1073. <br />0. MINERAL FILLER: ROCK OR SLAG DUST, HYDRAULIC CEMENT, OR OTHER INERT <br />MATERIAL COMPLYING WITH ASTM D 242. <br />E. BITUMINOUS MATERIAL ASPHALT CEMENT, PERFORMANCE GRADE PG 64-22 AND <br />CONFORMING TO LOCAL STATE HIGHWAY SPECIFICATIONS; ASTM D 3381 FOR <br />VISCOSITY -GRADED MATERIAL; ASTM D 946 FOR PENETRATION -GRADED MATERIAL <br />F. TACT( COAT: EMULSIFIED ASPHALT SS -11 ASTM D 977, UNIFORMLY DILUTED 5OX <br />APPLY IMMEDIATELY AFTER CLEARING SURFACE WITH COMPRESSED NR OR BLOWERS, <br />0. ASPHALTIC CONCRETE: MIXTU <br />RE OF COHSE AND FINE AGGREGATE, MINERAL TILLER <br />AND F CEMENT COMBINED W SUCH PROPORTIONS THAT THE COMPOSITION <br />BY WEEIGHTIGHT OF THE I LATHED MIX SHALL BEEORAACCORDING TO STALE HIGHWAY <br />MIX AND WEIGH WITHIN THE LINAFOLLOWING <br />ST PANGS OR AS DIRECTED BY OWNER: <br />H. MIX AND WEIGH ALL MATERIAL IN A STANDARD MODERN PLANT, REQUWNLY <br />PRODUCING ASPHALTIC CONCRETE. <br />TOTAL PA138PW X BY WBCiii <br />I. TME BP/AMOCO ENGINEER SHALL APPROVE AJOB-NIX FORMULA FOR EACH <br />MIXTURE. EACH LOCAL GOVERNING ENTRY HAS SPECIFICATIONS FOR HOT -PLANT <br />MIXES USED WITRIN THEW REGION. WHILE THERE IS A GREAT DEAL OF SIMILAR <br />COMPACTED <br />BINDER COURSE <br />SURFACE COURSE <br />SIEVE <br />(MIXTURE e) <br />(MIXTURE C. D, OR E) <br />NNNNNNN <br />Y <br />IOD <br />_ <br />in <br />100 <br />-- <br />3/4' <br />82-100 <br />100 <br />I IN (25.0 MY) <br />50-82 <br />90-100 <br />3/B' <br />-- <br />66-100 <br />0. 1 <br />NO, <br />24-50 <br />24-65 <br />8 <br />16-36 <br />1e-46 <br />NO. 16 <br />10-25 <br />10-32 <br />N O. 36 <br />30 <br />9-33 <br />R-33 <br />NON <br />4-12 <br />4-15 <br />100 <br />3-9 <br />3-10 <br />NO, 200 <br />2-6 <br />Z-6 <br />ASPHALTIC CEMENT <br />3-9 <br />34 <br />tt <br />AMONG TME GOVERNING ENTITES 'ATH RESPECT TO MIZTURE GRADATIONS, UCH AVS <br />THEIR OWN SYSTEM OF MIX IDENTIFICATION AND NOMENCLATURE INSOFAR AS <br />POSSIBLE, MIXES USED FOR PAVING BP/AMOCO PROJECTS SHOULD ADHERE TO <br />LOCAL GOVERNING ENTITY PAVING SPECIFICATIONS. NO GAP GRADED AGGEGRATE <br />SHALL BE USED, IF NO SPECIFICATIONS ARE AVAILABLE, THE GRADATIONS SHOWN <br />BELOW SHOULD BE FOLLOWED, R IS PROBABLE THAT EACH LOCAL GOVERNING <br />ENTITY WILL HIVE MMES THAT CLOSELY APPROXIMATE THESE GRADATIONS. COMES <br />BABE APD SURFACE <br />2.2 INIAL SEAL CMT <br />A CONTRACTOR SHALL INCLUDE IN THIS WORK THE APPLICATION OF THE INITIAL SEA <br />COAT NO SOONER THAN 6 MONTHS. AND NO LATER TFLW 12 MONTHS AFTER <br />INSfAL1A710N OF ASPHAL <br />COMPACTED <br />TOTAL PERCENT <br />SMOOTHNESS <br />SIEVE SIZE <br />PASSING <br />SURFACE <br />WEIGHT BASE <br />NNNNNNN <br />B' <br />2 IN. (50.0 M4) <br />100 <br />-- <br />1 1/2 IN. (37.5 MM) <br />90-100 <br />-- <br />I IN (25.0 MY) <br />-- <br />-- <br />3/4 IN (19.0 MM) <br />56-80 <br />I/2 IN (12.5 LIM) <br />-- <br />100 <br />!/5 IN (9,5 MM) <br />-- <br />80-100 <br />N0, 4 (4.75 MM) <br />23-53 <br />45-80 <br />N0, 5 (2.36 MM) <br />15-41 <br />30-60 <br />N0. 16 (1.18 MM) <br />N/A <br />20-45 <br />N0. 30 (600 MKroM) <br />N/A <br />10-35 <br />N0. 50 (300 AOcroM) <br />4-6 <br />5-25 <br />N0. 100 (150 MicroM) <br />-- <br />4-12 <br />N0. 200 (75 MTcroM) <br />0-5 <br />3-8 <br />ASPHALT CONTENT <br />3.0-7.0 <br />4.54.5 <br />(1L BY WEKAR OF TOTAL MIK) <br />T WEAR COURSE <br />B. INSIALU7gN OF IMTLAL SEAL CMT SHALL BE COORDIWTED WITH STORE <br />MANAGEMENT, AND SHALL BE STAGED SUCH THAT ONE-HALF OF GASOUNE <br />DISPENSERS ARE OPEN AT ALL TIMES AND SAFE CUSTOMER ACCESS TO <br />CONVENIENCE STORE IS AVAILABLE, UNLESS OTHERWISE REQUESTED BY STORE <br />MANAGER. <br />C, INITIAL SEAL COAT SHALL BE FASS - DRI POLYMERIC COATING ( MAINTENANCE, INC., <br />WOOSTER, ON. 800 - 892 - 6701). A COMBINATION OF COAL TM, POLYMER <br />CHEMISTRY AND REINFORCING GEOTEXTILE FIBERS APPLIED AT A RATE OF 90 <br />SQUARE FEET PER GALLON PER CGT. THE COATING SHALL BE UL CLASSIFIED FOR <br />SUP RESISTANCE INSURING NONSKID CAPABILITY WHEN DRY AND WHEN FLOODED <br />WITH WATER OR OIL COATING SHALL BE WEATHER, GAS, OIL, CHEMICAL AND <br />ABRASION RESISTANT. TWO COATS APPLIED SEPARATELY, THE CONTRACTOR MUST <br />SUBMIT CERTIFICATION BY THE MANUFACTURER THAT THE MATERIAL WAS PURCHASE <br />AND APPLIED ACCORDING TO THE MANUFACTURER'S SPECIFICATION, SEAL ALL <br />CRACKS IN ASPHALT PRIOR TO APPLYING SEA CMT. <br />D. DO NOT PERMIT VEHICULAR TRAFFIC OF ANY KIND ON PAVING UNTIL IT HAS COOLED <br />ARCO SITE SPECIFICATIONS <br />ARCO C - TOR AND f�UEL CANOPY <br />3443 CHEROKEE ROA®, SAN JOAQUIN COUNTY CA <br />ALL WORK SHALL COMPLY WITH THE SAN JOAQUIN COUNTY STANDARD SPECIFICATIONS <br />AND HARDENED, AND IN NO CASE LESS AWN SIX HOURS AFTER FINAL ROVING OF <br />BDUMINOUS MATERIALS. PROVIDE TEMPORARY BARRICADES 10 NEEP TRAFFIC FROM <br />COMPLETED PA. MAINTAIN IN PUCE FOR A MINIMUM OF THREE DAYS AFTER <br />COMPLETION OFr PAVING WORK, <br />E. COORDINATE APPLICATION SO THAT MAXIMUM DRYING TIME IS 24 HOURS. DO NOT <br />SEALCDAT WHEN AMBIENT AIR OR GROUND TEMPERATURE IS BELOW 45 DEGREES F. <br />PMT 3 - EXECUTION <br />3.1 INSTALLATION <br />A INSTALL BASE AND ASPHALT PAVING TO THE FOLLOWING FINISHED DIMENSIONS: <br />SIEVE SIZE <br />& PMKINC LOT DRIVEWAYS: <br />COMPACTED <br />SMOOTHNESS <br />DEPTH <br />LERAN <br />TOLERANCE <br />BASE <br />NNNNNNN <br />B' <br />f1/2' <br />MAX. 1/4' WHEN MEASURED <br />WITH A 10 FOOT STRAIGHTEDGE <br />BANDER COURSE <br />2,5' <br />31 2" <br />/ <br />MAX, 1/4' WHEN MEASURED <br />QUEM OR <br />WITH A ID FOOT STRAIGHTEDGE <br />SURFACE COURSE <br />1,5' <br />a1/4' <br />MAX. 1/8' WHEN MEASURED <br />WITH A 10 FOOT STRAIGHTEDGE <br />Bl. ARP ALL SITE UTILITIES HAVE BEEN CONTRACTOR <br />SH AND THE BACKFILL IS <br />PROPERLY CONSOLIDATED, THE COURSE <br />TO <br />SHALL PINE GRADE AND ROLL THE <br />OUBGRADE, AND INSTALL THE COURSE TO THE COMPRESSED THICKNESS AS <br />OUTLINED ABOVE, <br />C. BASE COURSE: <br />C.i. 1, SPREAD COURSE AGGREGATE <br />AGG WITH A SELF-PROPELLED SPREADING MACHINE <br />SUBGRADE. <br />. PLACING THE AGGREGATE TRUE TO GRADE UPON THE PRIMED <br />DEPTH OF WHEN V®LAERY ALL NOT X USED, THE MAXIMUM COMPACTED <br />DEPTH OFA SINGLE LAYER SMALL NOT EXCEED 6 INCHES. WHEN VIBRATORY <br />COMPACTION EQUIPMENT IS NOT USED, THE MAXIMUM COMPACTED THICKNESS <br />2. ONE LAYER SHALL NOT CEEXCEED <br />UN 3 INCHES <br />G2. 2. BROOM AND ROLL SURFACE UNTIL SMD OR SCREENINGS CANNOT BE <br />FORCED INTO THE VOIDS, <br />G3. 3. COMPACT BASE COURSE IN ACCORDANCE WITH THE STATE HIGHWAY <br />SPECIFICATIONS, <br />G4. 4. BASE COURSE SHALL BE INSTALLED W TWO LAYERS OF EQUAL THICKNESS. <br />D. ASPHALTIC CONCRETE BINDER COURSE AND SURFACE COURSE: <br />D.I. 1, ASPHALT MIXTURE SHALL BE WD ONLY WHEN THE PREPARED SUBGRADE OR <br />UNDERLYING COURSE IS DRY AND WHEN WEATHER CONDITIONS ARE SUITABLE, <br />2, NO MIXTURE SHALL BE SPREAD WHEN THE NR TEMPERATURE IS BELOW 40 <br />DEGREES F. OR WHEN THERE IS FROST ON THE GROUND. <br />D.S. &PROVIDE A UNIFORM FINISH SURFACE FREE FROM RUTS OR IRREGULARITIES IN <br />CONTOUR, AND TRUE TO THE ESTABLISHED GRADE TO PRESENT A SMOOTH <br />E. <br />(IMPACTION: <br />1, <br />E.1. I. COMPACT MIXTURE WHILE STILL HOT, BY ROVING WIT <br />H SELF-PROPELLED <br />TANOEAI ROLLER. <br />E.T. 2. COMPACTED COURSE SHALL BE FREE OF ALL IRREGULARITIES AND SHALL <br />CONFORM TO THE GRADE AND DIMENSIONS GIVEN ELSEWHERE IN THESE <br />SPECIFICATIONS, <br />E3. 3. WEARING SURFACE COURSE SHALL SHOW AN EVEN AND SMOOTH SURFACE <br />WITH AGGREGATE AND FINES UNIFORMLY DISTRIBUTED, <br />EA. 4, AFTER FINAL ROWING, DO NOT PERMIT VEHICULAR TRAFFIC ON PAVEMENT <br />UNIX R HAS COOLED AND HARDENED. <br />i. SUBSTITUTIONS: <br />F.1. 1, SURMLE BASE OF THE SPECIFIED THICKNESS OBTAINED BY OTHER METHOD <br />IS ACCEPTABLE IF SUBMITTED TO AND APPROVED BY OWNER. <br />F.T. 2, SUFABLE ASPHALTIC CONCRETE WEARING SURFACE OF DIFFERENT <br />SPECIFICATION IS ACCEPTABLE IF SUBMITTED AND APPROVED BY OWNER, <br />G. CURING AND PATCHING <br />Gi. I. SAW -CUT EDGE OF EXISTING PAVING WHERE NEW PAVING IS TO ABUIT, IN A <br />TRUE, STRAIGHT LINE, TO EXPOSE AN EVEN, VERTICAL. SURFACE FOR FULL <br />COURSE THICKNESS. <br />C2. 2, CONTACT SURFACES SHALL BE CLEAN AND FREE OF SID, DIRT, AND OTHER <br />DELETERIOUS MATERIAL. <br />G3. 3, APPLY TACK COAT. <br />G4. 4. CAREFULLY MAKE JOINT TO ENSURE CONTINUOUS BOND BETWEEN NEW AND <br />EXISTING PAVING. <br />3.2 PAVEMENT MARKING <br />A PAINT A' VIDE PARKING SPACE LINES, ACCESSIBLITY SYMBOLS AND TRAFFIC <br />MARKINGS AS SHOWN, UNLESS OTHERWISE REQUIRED BY LOCAL JURISDICTIONS. <br />B. MATERW: <br />8.1. 1. 2 COATS ALKYD TRAFFIC PAINT MARKING PAINT ULTRA -HIDE TRAFFIC PAINT' <br />AS MANUFACTURED BY ICI PAINTS (GLADDEN) OR 'PROMM ALKYO TRAFFIC <br />MARKING PAINT' AS MANUFACTURED BY SHERWIN WILLIAMS, <br />82. 2, COATI; WHITE PARKING STRIPES, YELLOW NO PARKING ZONES AND BLUE <br />HANDICAPPED STALLS UNLESS OTHERWISE REQUIRED ON DRAWINGS OR BY <br />LOCAL JURISDICTION, <br />C. CLEAN PAYEMENT SURFACE OF LOOSE MATERIAL AND DIRT. APPLY WHEN <br />TEMPERATURES ARE ABOVE 40 DEGREES F. <br />D. CONTRACTORS WORK SHALL INCLUDE RE-57RIPING PAVING AFTER THE RIM SEAL <br />COAT IS APPLIED PER SECTION 2.02 ABOVE, <br />SECTION 02520 - CONCRETE - FOUNDATIONS, SLABS, AND <br />PAVING <br />PARE I - GENERAL <br />I.I OESCRIPPON <br />A ALL WORK UNDER THIS SECTION 15 SUBJECT TO THE CONTRACT DOCUMENTS, <br />B. HURNSH ALL LABOR, MATERIALS. EQUIPMENT, LAYOUT AND SUPERVISION NECESSARY 10 <br />COUPIETE ALL CONCRETE WORK <br />C. REFER TO DRAWINGS, SCHEDULES AND DETAILS FOR KIND TYPE AND LOCATION OF <br />CONCRETE WORK REQUIRED, <br />D. <br />INORDINATE W17H OTHER TRADES, <br />E. CONCRETE WORK SHALL BE GOVERNED BY THE FOLLOWING AMERICAN CONCRETE INSTITUTE <br />(ACL) STANDARDS: <br />EI. 1, ACI 318, "BUILDING CODE REQUIREMENTS FOR REINFORCED CONCRETE' <br />F9. 2 ACI 302.IR, 'GUIDE FOR CONCRETE FLOOR AND SLAB CONSTRUCTION' <br />EJ. 3, AG 301, 'SPECIFICATIONS FOR STRUCTURAL CONCRETE' <br />EI. 4, ACI 117, STANDARD SPECIFICATIONS FOR TOLERANCES FOR CONCRETE <br />CONSTRUCTION AND MATERIALS' <br />E5. 5, ACI 305R, 'HOT WEATHER CONCRETING' <br />E6. 6, ACI 306.1, -SPECIFICATIONS FON COLD WEATHER CONCREONG' <br />1? <br />JAI IN ASSIRANCF <br />A SUBMIT A WRITTEN DESCRIPTION OF THE CONCRETE MIX DESIGN TO BE USED FOR THE <br />WORK TO OWNER AT LEAST TEN WORKING DAYS PRIOR TO TIPSY CONCRETE PLACEMENT. <br />WDGTE MDING METHOD, NR CONTENT, SLUMP, ADMIXTURES TO BE USED. 28 -DAY <br />COMPRESSYE STRENGTH, AND PROPORTIONS OF CONCRETE WATER AND AGGREGATE, MIM <br />DESIGN SHOULD COMPLY WITH REQUIREMENT OF SECTION 3A3 OF THIS SPECIFICATION. DD <br />NOT BEGIN CONCRETE PLACEMENT UNTIL MIXES HAVE BEEN RENEWED BY OWNER, <br />6. THE OWNER MAY ENGAGE AN INDEPENDENT TESTING AGENCY TO SAMPLE CONCRETE <br />ACCORDING TO ASTU C 172 AND TO PERFORM TESTS ACCORDING TO THE FOLLOWING ASTMAIR <br />UNIT WEIGHT ASTIA CONTENT ASTM t I7] AND C 23I <br />SLUMP ASTM C IU <br />CONCRETE EVALUATION AC 301 CHAPTER <br />17 <br />CONCIIETE RGECTgN ACJ ]01 <br />C. NONTR OWNER A LUST 21 HOURS BEFORE CONCRETE POUR. <br />D. CONTRACTOR SHALL PREPARE ONE CONCRETE CYLINDER FROM EACH TRUCK FOR EACH <br />CONTINUOUS CONCRETE PQUR W IXCE55 IS CUBIC YARDS AP40 DA CYLINDERS SHALL <br />BE PED ONF SITE. LABELED TO INDICATE INSTALLATIONTLOCATION AND MIF, AND ISHALL BE <br />SiCTRA ON SITE. OWNER MAY CHOOSE f0 SUBMIT THESE CYLINDERS RI A TESTING <br />MO BE TO <br />E. PROVIME TO THE OWNER UPON REQUEST COPRS OF ALL CONCRETE OEIA'ERY TICKETS <br />DOCU, DATE THE FOLLOWING D,TIMEINFORMATION: <br />E.I. 1. DATE ANO TME DLAPATCHEO, TWE OF MRNAL, AND TIME dF PLACEMENT. <br />F.2. 2. AMOUNT OF CONCRETE. <br />F. COLD WEATHER REQUIREMENTS <br />F.I. MIX DESIGN, HANDLING AND PLACEMENT OF CONCRETE SHALL BE IN <br />ACCORDANCE WITH ACI 3068 EXCEPT AS INDICATED IN THIS <br />SPECIFICATION. <br />F.2. IF AIR TEMPERATURE AT THE TIME OF INSTALLATION IS BELOW 40 <br />DEGREE F, CONCRETE MAY BE PLACED IF THE FOLLOWING CONDITIONS <br />ARE MET: <br />F.2.A. THE SUBBASE IS NOT FROZEN, AND IT HAS BEEN PROTECTED USING <br />INSULATING BLANKETS SO THAT ITS TEMPERATURE IS NOT BELOW <br />32 DEGREES F. <br />F.2.B. CONCRETE TEMPERATURE AT TIME OF DELIVERY SHALL NOT BE LESS <br />THAN 55 DEGREES F. F IN A MOIST CONDITION FOR A MINIMUM OU <br />SEVEN DAYS AFTER PLACEMENT <br />MAINTAIN CONCRETE ABOVE 50 FOLLOWING THE RECOMMENDATIONS <br />OF AG 308-92. ' <br />F.2D. USE EITHER: L ASTM C150 T III <br />YPE HIGH ABLY STRENGTH <br />CONCRETE. ( pR 2 ASTM CI50, TYPE <br />I CONCRETE WITH HE REQUIRIDE ACCELERATING ADMIXTURE <br />CONFORMING RI THE REQUIREMENT TU ASTM C 194 TYPE C OR E. <br />f.2.E. USE N CHLORIDE CONTAINING ADMI%TURES WILL CONCRETE <br />GROUNDS FOR REMOVAL AND REPLACEMENT 4i CONCRETE A7 NO <br />COSI TO OWNER. <br />F.2.F. CONCRETE SHALL NOT BE POURED IF AIR TEMPERATURE AT 7NE <br />TIME OF PLACEMENT IS BELOW 25 DECREES F. <br />G. HOT WEATHER REQUIREMENTS <br />G.1. MIX DESIGN, HANDLING AND PLACEMENT OF CONCRETE SHALL BE IN <br />ACCORDANCE HATH AG 305R E%CEP' AS INDICATED IN THIS <br />SPEGFlCATION. <br />C.2. IF AIR TEMPERATURE AT THE TIME OF INSTALLATION IS ABOVE 90 <br />DECREES F, CONCRETE MAY BE PLACED IF THE FOLLOWING CONDITIONS <br />ARE MET: <br />G2.A. DAMPEN FORMS AND SUBGRADE PRIOR TO PLACING CONCRETE. <br />G.2.B. CONCRETE DELIVERY TEMPERATURE MUST NOT EXCEED 90 DEGREES <br />F. <br />G.Z.C. COVER FRESHLY PLACED CONCRETE WITH WHITE PLASTIC SHEETING <br />OR DAMP BURLAP BETWEEN THE PLACEMENT AND FINISHING <br />STEPS. <br />USE A SET RETARDING ADMIXTURE CONFORMING TO THE <br />REQUIREMENT OF ASTM C 494, TYPE B OR D. <br />G.2,E PLACE CONCRETE AS SOON AS POSSIBLE AFTER MIXING AVOID <br />PLACING DELAYS. AVOID PLACING CONCRETE DURING HOTTEST <br />HOURS OF THE DAY. <br />G.Z.F. APPLY CURING/SEALINC COMPOUND IMMEDIATELY AFTER FINISHING <br />CONCRETE SURFACE <br />PMT 2 - PRODUCTS <br />Z.1 MATERIALS <br />A, POR RAND CEMENT <br />AL1. ASTM CI50, TYPE 1 EXCEPT AS NOTED IN COLD WEATHER <br />REQUIREMENTS ABOVE. <br />AL2. TYPE IN HIGH EARLY STRENGTH CEMENT AT CONTRACTORS OPTION <br />EXCEPT IN HOT WEATHER PLACEMENT. <br />B. AGGREGATE <br />CONFORM TO ASTM C33, <br />8.2. 2. AGGREGATES SHALL NOT CONTAIN DELETERIOUS MATERIALS OR <br />MATERIALS THAT CAUSE POPOUTS SUCH AS CHERI, FLINT, COAL, <br />LIGNITE, CLAY OR OTHER FRIABLE MATERIALS IN EXCESS OF THOSE <br />ALLOWED IN TABLE 3 OF ASTM C 33. <br />B.3. 3. COARSE AGGREGATES: PROVIDE COARSE AGGREGATES CONFORMING <br />70 ASTM C 33 CONSISTING OF CRUSHED STONE OR WASHED GRAVEL <br />HAVING A CLEAN, HARD, STRONG, DURABLE, UNCOATED PARTICLES <br />FREE FROM INJURIOUS AMOUNTS OF SOFT OR FLAKY PIECES, ALKAU, <br />ORGANIC MATTER, OR OTHER DELETERIOUS SUBSTANCES. PROVIDE <br />COARSE AGGREGATE WITH A MAXIMUM OF 1-1/2 INCHES, FIVE PERCENT <br />IS TO PASS A NO, 4 SIEVE. <br />8.4. 4, FINE AGGREGATES: PROVIDE FINE AGGREGATES CONFORMING TO <br />ASTM C 33 CONSISTING OF NATURAL SAND HAVING CLEAN, HARD, <br />STRONG, DURABLE, UNCOATED GRAINS, FREE OF INJURIOUS AMOUNTS <br />OF DUST, LUMPS, SOFT OR FLAKY PARTICLES, SHALE, ALKALI, <br />ORGANIC MATTER, OR OTHER DELETERIOUS SUBSTANCES, PROVIDE FINE <br />AGGREGATES WITH A MINIMUM OF NINE PERCENT PASSING THROUGH A <br />N0. 100 SIEVE. IN ADDITION NOT MORE THAN 45 PERCENT IS TO BE <br />RETAINED BETWEEN ANY TWO CONSECUTIVE SIEVES <br />C. WATER SHALL BE GLEAN, POTABLE, FREE OF OIL. ACIDS, SALTS, OR OTHER <br />DELETERIOUS MATTER AND COMPLYING WITH ASTM C91 <br />D. STEEL REINFORCING <br />D.I. 1. FREE FROM FLAKING RUST, SCALE AND DIRT. <br />D.2 2. ASTM A615, GRADE 50, DEFORMED <br />D.3. 3. TIRE FABRIC: COLD DRAWN ASTM A185 <br />D,4. 4. WRE FABRIC SHALL BE IN FLAT SHEETS AND SMALL BE DESIGNATED <br />AS SHOWN ON DRAWINGS. <br />D.S. 5. SYNTHETIC FIBER: FIBRILLATED POLYPROPYLENE FIBERS ENGINEERED <br />ANO DESIGNED FOR USE IN CONCRETE COMPLYING WTH ASTM C 1116, <br />TYPE 111, 1/2 INCH TO I INCH LONG. NOT REWIRED IN FOUNDATIONS IF <br />APPROVED BY OWNER. <br />E ADMIXTURES <br />E.I. 1. ADMI%TURES CONTAINING MORE THAT 0,10 . CHLORIDE IONS ARE <br />NOT PERMITTED. DO NOT USE ADMIXTURES CONTAINING CALCIUM <br />CHLORIDE. <br />E.2. 2, ALL CONCRETE SUBJECT TO FREEZE/THAW CYCLES SHALL USE AN <br />AIR ENTRAINING ADMIXTURE CONFORMING TO ASTM C 260. AIR <br />ENTRAINED CONCRETE IS NOT REQUIRED FOR SUBGRADE FOUNDATIONS <br />OR FOR INTERIOR SLABS. AIR ENTRAINED CONCRETE IS REQUIRED IN <br />PAVEMENT AND SIDEWALKS. <br />E.3. }, OTHER ADMIXTURES SHALL NOT BE USED EXCEPT BY PRIOR <br />APPROVAL AND AGREEMENT HATH OWNER. <br />F. CURING/SEAUNG COMPOUND <br />F.1. 1, USE A NON -YELLOWING GASOLINE RESISTANT TURING/SEALING <br />COMPOUND, MEETING ASTM C 309, TYPE 1. <br />F.2. 2. DO NOT APPLY SEALER TO CONCRETE SLABS THAT WILL EVENTUALLY <br />BE COVERED BY FLOOR TILE. <br />F.3. 3. APPROVED PRODUCTS: <br />F.J.0. A EUCLID SUPER DIAMOND CLEAR VO% <br />F.3.B. B. MASTERBUILDERS CURE $ SEAL 30 % <br />F.S.C. C. SONNEBORN KURE N SEAL 30 <br />C. JON' MATERIALS <br />G.I. I. EXPANSION AND ISOLATION JOINT MATERIAL SHALL COMPLY HATH <br />ASTM D 1751. <br />G1. 2. INSTALL IN PAVEMENT SAW -CUT OR FORMED CONTROL JOINTS, <br />ELASTOMERIC JOINT SEALANT AS FOLLOWS: <br />G.2.A A COMPLY HATH ASTM C 920, TYPE S (SINGLE COMPONENT). <br />G.2.B. B, COMPLY HATH ASTM C 920, GRADE P (SELF LEVELING). <br />G.2.C. C. CLASS 25, FUEL RESISTANT. <br />H. OTHER MATERIALS <br />H.I. L VAPOR BARRIER: 0,006' (6 NIL) POLYETHYLENE FILM. <br />H.2. 2. PIPE BOLLARD: INSTALL DINER FURNISHED EOLK'MENT (OFE) PIPE <br />BOLLARDS AS SHOWN ON PLANS, MIN, 36 INCHES BELOW PAVEMENT. <br />H.3. 3, ISLAND FORMS: INSTALL OFE BUILDING CURB FORMS AND ISLAND <br />FORMS AND DISPENSER BOXES WHERE INDICATED ON PLANS. <br />PART 3 -EXECUTION <br />3.1 FORM WORK <br />A FORM WORK SHALL CONFORM TO AG 347R. <br />B. SET FORMS STRAIGHT, PLUMB AND TRUE TO LINES AND DIMENSIONS PER <br />Ad 301 AND 347R. <br />C. PROVIDE ADEQUATE BRACING FOR FORMS TO WITHSTAND ALL LOADS, D. EXTERIOR AND INTERIOR CONCRETE SURFACES SHALL BE EQUIVALENT TO <br />PLYWOOD FORM FINISH, WITH NORMAL WOOD GRAIN SHOWING, UNLESS <br />OTHERWISE NOTED, <br />E. CLEAN FORMS AND TREAT PATH RELEASING AGENT PRIOR TO INSTALLATION, J.2 REINFORCEMENT <br />A LOCATE AND TIE ALL METAL REINFORCEMENT AND ACCESSORIES IN FORMS AS <br />INGGTED IN DRAWINGS, CLEAN REINFORCEMENT OF LOOSE RUST, EARTH, ICE AND OTHER FOREIGN MATERIALS. <br />B INSTALL REINFORCING STEEL IN ACCORDANCE WITH ACI 315, C. NAP SPLICES AS REQUIRED BY DESIGN AND SERVICE REQUIREMENTS, 260" MINIMUM, <br />D. LOCATE AND SUPPORT REINFORCEMENT WITH BAR SUPPORT TO MUNTAN MINIMUM <br />CONCRETE COVER. <br />E. DO T USE LIFTING CHAIRS F I T <br />NOOR IC INTO <br />ON OF WELDED R FABRIC, NNE ABN C. USE <br />LIFTING NOOK T RASE WINE FABRIC WTO NPOSITION <br />PLACE IN SIDEWALK OR SLAB <br />IMMEDIATELY AFTER CONCRETE IS POURED IN PUCE. <br />3.3 CONCRETE MIX PROPORTIONS <br />A WATER CEMENT RATIO: MAXIMUM OF 0.45 <br />B. COMPPESSNE STRENGTH: AGOG PSI AVERAGE 28 -DAY COMPRESSIVE STRENGTH, FOR SU85, 3500 PSI FOR FOUNDATIONS. <br />C. SLUMP: 3"-5" AT POINT OF PLACEMENT. <br />D. AW ENTRAINMENT: 49 TO 6X, IN EXTERIOR EXPOSED CONCRETE, CEMENT: 561 <br />LBS/CY (6 BAG MIX). <br />E. NO WATER MAY BE ADDED AT THE SITE TO IMPROVE CONCRETE WORKABILITY, USE <br />WATER REDUCING ADMIXTURE CONFORMING TO ATSM C494 AT THE MIX PLANT. <br />3A MIXING <br />A USE ONLY READY MIXED CONCRETE MIX AND PLACE CONCRETE FOLLOWING AG 318 <br />BUILDING CODE REOUIREMENTS FOR REINFORCED CONCRETE', <br />B. CONCRETE SHALL CONFORM TO MTM C94, C. PLWT 15 TO PROVIDE DELIVERY TICKET FOR EACH TRUCK STATING MIX <br />PROPORTIONS, AIR ENTRAINMENT, INTENDED SLUMP, DESIGN COMPRESSIVE STRENGTH <br />AN <br />D BRAND NAME OF ANY ADMIXTURES AND TIME OF MIXING. <br />D. TRUCKS NOT MEETING THE CRITERIA IN SECTIONS 3,3 AND 3.4 ABOVE SHALL BE <br />REJECTED AT NO COST TO THE OWNER. <br />3.5 %AGEMENT AND JOINTS <br />A PUCE CONCRETE WITHIN 90 MINUTES OF MIXING TIME SHOWN ON TICKET, <br />AI. W NOT PUCE ANY CONCRETE IF THE SUBGRADE HAS STANDING WATER OR IS <br />MUDDY. <br />A1. DEPOSI7 CONCRETE INTO THE FINAL POSITION AT THE SPECIFIED SLUMPS <br />WITHOUT SEGREGATION BY REHANDLING OR FLOWING, DEPOSIT CONCRETE AT A <br />RALE THAT CONCRETE REMAINS PLASTIC AND FLOWABLE INTO THE SPACES <br />BETWEEN THE REINFORCING BMS. DO NOT DEPOSIT PARTIALLY HARDENED <br />CONCRETE OR CONCRETE THAT HAS BEEN CONTAMINATED BY FOREIGN <br />A3. SCHEDULE CONCRETING THAT ONCE STARTED REMAINS A CONTINUOUS OPERATION <br />UNTIL THE PARTICULAR SECTION OR PANEL HAS BEEN COMPLETED. DO NOT <br />DEPOSIT FRESH CONCRETE ON CONCRETE THAT <br />HAS HARDENED SUFFICIENTLY TO <br />CAUSE FORMATION CONSTRUCTION SEMS OR PLANES OF WEAKNESS HATH THE SECTION OR <br />PANEL PROVIDE CONCREJOINTS AS INDICATED, B. THOROUGHLY COMPACT CONCRETE BY MEANS OF MECHANICAL VIBRATORS <br />SUPERVISED BY OR SETTLEMENT <br />PERSONNEL PROVIDE HENT, EM VIBRATION IS, ANDtt <br />70 CAUSE FLOW OR RMS; BUT <br />N MOUND REINFORCEMENT, EMBEDDED TINS, AND <br />CORNERS OF THE FORMS; BUT NOT TONG ENOUGH TO CAUSE SEGREGATION OF THE <br />MIK SUPPLEMENT MECHANICAL VIBRATION BY HAND SPADING IN CORNERS AND <br />ANGLES OF THE FORMS AND ALONG HORN SURFACES WALE THE CONCRETE IS S <br />PIASIIC 10 ENSURE EVEN DENSE SURFACES igEC FROM AGGREGATE POCKETS OR <br />HONEYC04B5. <br />C. CONCRETE AND REINFORCEMENT SRW. BE PLACED TO THE THICKNESS, DIMENSIONS <br />AND EXTENT SHOWN ON PLANS, D. PROVIDE EXPANSION JOINTS AT LOCATIONS INDICATED ON PLANS, E. PROVIDE PREFORMED JOINT FREER AT ABUTMENT OF FOUNDATION AND SIDEWALKS, <br />AT 0' O.C. IN SIDEWALKS, MOUND STEEL ISLAND FORMS AND BOLLARDS, AND AS INDICATED ON THE PIANS. <br />F. SAW -CUT CONTROL JOINTS TO A MINIMUM DEPTH OF 3/4 -INCH TO CONTROL <br />CRACKING AT SPACING NOT TO EXCEED 20 R. AND NOT LESS THAN 10 Fr <br />CONTROL JOINTS SHALL BE INSTALLED NO SOONER THAN 4 HOURS AND NO LATER <br />THAN 12 HOURS AFTER PLACEMENT. <br />G. INSTALL JOINT SEALANT IN ALL CONTROL JOINTS, ISOLATION JOINTS AND EXPANSION <br />JOINTS. REMOVE ALL DEBRIS AND WTANCE W SAWCUT JOINTS USING COMPRESSED <br />NR PFUIOR TO INSTALLING SEALANT, H. USE 100LED CONTROL JOINTS ON ALL SIDEWALKS, 5/8 -INCH MINIMUM DEPTH, TOOTED JOINTS WITH 3/4 -INCH MINIMUM DEPTH MAY BE USED IN UEV OF SAWCUT <br />JOINTS IN GENERAL PAVING MEAS PROVIDED THAT JOINT SEALANT 15 INSTALLED, I. PROVIDE A SMOOTH FINISH AT ALL EXPOSED SURFACES, CONSTRUCT CORNERS WITH <br />A ONE INCH CHAMFER, J. PROVIDE CONSTRUCTION JOINTS AT THE END OF EACH DAY'S CONCRETING <br />OPERATIONS, OR WHEN CONCRETING IS INTERRUPTED FOR A PERIOD OF 30 MINUTES <br />OR MORE. CONSTRUCT JOINTS WITH A KEYWAY BY USE OF A WELL OILED WOOD <br />STRIP HATH BEVELED EDGES, OR A METAL KEYWAY STRIP, LOCATE SO THE STRENGTH <br />AND APPEARANCE OF THE STRUCTURE IS NOT IMPAIRED. <br />3.6 CURING <br />A PROTECT CONCRETE FROM RNID DRYING AND KEEP W A MOIST CONDITION FOR AT <br />LEAST 7 DAYS AFTER PLACING WITH A CURING COMPOUND AS SPECIFIED ABOVE. <br />B. CURE BOOR SUBS WITH A NON -RESIDUAL CURING COMPOUND. <br />C. VEISDUIAR TRAFFIC SHALL BE KEPT OFF OF CURING CONCRETE FOR AT LEAST 7 <br />DAYS. <br />D. E%CEP' FOR SAW -CURING OF CONTROL JOINTS, FOOT TRAFFIC SHOULD BE KEPT <br />OFF OF CONCRETE FOR AT LEAST 2 DAYS <br />E. LURE CONCRETE IN ACCORDANCE HATH HOT AND COLD WEATHER PROVISIONS GIVEN <br />IN SECTION 1.02 OF THIS SPECIFICATION. <br />7 FINISHING <br />A INTERIOR SLABS: STEEL TROWEL FINISH. <br />8. EXTERIOR SIDEWALKS: TRANSVERSE BROOM FINISH. <br />C. PAVEMENT: BROOM FINISH. <br />SECTION D2600 - PIPED UTILITIES <br />PART I -GENERAL <br />1.1 OESGRIPTION <br />A ALL WORK UNDER THIS SECTION IS SUBJECT TO THE CONTRACT DOCUMENTS, <br />B. FURNISH NJ. LABOR, MATERAS, EQUIPMENT, LAYOUT AND SUPERVISION NECESSARY <br />TO COMPIEIE ALL CONCRETE WORK, <br />L. REFER TO DRAWINGS, SCHEDULES AND DETAILS FOR KIND TYPE AND LOCATION OF <br />CONCRETE WORK REQUIRED, <br />D. COORDINATE WITH OTHER TRADES. <br />E. WORK INCLUDES, BUT 15 NOT LIMITED TO, PIPES, UNDERGROUND STORM AND <br />SANRAtY SEWER SYSTEMS, FITTINGS, MANHOLES, INLET BASINS, CATCH BASINS, <br />CULVERTS, AS WELL AS CONNECTIONS TO BP'S MAINS AND/OR CONNECTIONS TO <br />EXISTING SYSTEMS BY OTHERS ALL REQUIRED FOR COMPLETE SANITARY AND <br />DRAINAGE SEWERS, M SHOWN ON THE DRAWINGS OR SPECIFlED, OR BOTH. REFER <br />TO SECTION 02200 - EARTHWORK. <br />PARI 2 -PRODUCTS <br />2.1 MA1ERW5 <br />PIPE: <br />REQUIRED PIPE MATERIALS WTTNIN CITY ROW: <br />WATER: C900 PVC <br />570ftM ORNN: CLASS N RCP <br />SEWER: SDR -35 PVC <br />A. POLYVINYL CHLORIDE (PJC) PIPE: SEWER PIPE IS TO BE POLYVINYL CHLORIDE (PVC) <br />PIPE UNLESS OTHERWISE INDICATED ON THE DRAWINGS OR DICTATED BY LOCAL <br />CODES. FURNISH PVC PIPE AND FITTINGS SCHEDULE 40 CONFORMING TO THE <br />REQUIREMENTS OF ASTM D 1784, TYPE 1, GRADE 1. THE STANDARD DIMENSION <br />RATIO (SDR) <br />15 NOT TO EXCEED 35, PROVIDE SOCKET TYPE JOINTS JOINED BY <br />SOLVENT CEMENT. <br />AI. i. FURNISH <br />ALL ELLS, TEES <br />WYES COUPLINGS <br />CAPS <br />AND ALL OTHER FITTINGS <br />OF THE SAME TYPE ' <br />AND CLASS OF MATERIALS THE REDS AS E PVC PIPE. <br />A2. 2. DRAINAGE STRUCTURES R AINI INCLUDING CATCH BASINS AND TRENCH DRAINS ME <br />IN ON THE DRAWINGS. <br />AJ. 3. PROVIDE SOLID BRASS CLEAN-OUT CMS IN MFRS OF FOOT OR TRAFFIC <br />ARCS <br />B. CAST WON SOIL PIPE: FURNISH CAST IRON SOIL PIPE CONFORMING TO THE <br />REQUIREMENTS OF ASTM A 74 WITH CISPI 301 CAST WON HUB -AND -SPIGOT <br />COMPRESSION TYPE FITTINGS WITH NEOPRENE RUBBER GASKETS CONFORMING TO <br />ASTM C 584. FURNISH SERVICE WEIGHT PIPE UNLESS OTHERWISE DICTATED BY <br />LOCAL CODES. <br />C. REINFORCED CONCRETE PIPE: FURNISH REINFORCED CONCRETE PIPE CONFORMING <br />TO THE REQUIREMENTS OF ASTM C 76, CLASS IN. PROVIDE MODIFIED TONGUE AND <br />GROOVE TYPE JOINTS WITH RUBBER GASKETS CONFORMING TO ASTM C 443. <br />D. NON -REINFORCED CONCRETE PIPE: FURNISH NON-RUNFORCED CONCRETE PIPE <br />CONFORMING TO THE REQUIREMENTS OF ASTM C 14, CLASS 2. PROVIDE MODIFIED <br />TONGUE TYPE JOINTS WITH RUBBER GASKETS CONFORMING TO ASTM C 443. <br />PMT 3 - EXECUTION <br />3.1 PREPARATION AND HANDUNG <br />A INSPECT AIL PIPE AND FITTINGS PRIOR TO LOWERING INTO THE TRENCH TO ENSURE <br />NO CRACKED. BROKEN, OR OTHERWISE DEFECTIVE MATERIALS ARE BEING INSTALLED. <br />CLEAR ENDS OF PIPE THOROUGHLY. <br />B. REMOVE ALL DAMAGED PIPE FROM THE SITE. <br />3.2 PIPE INSTAILATION, <br />A INSTALL PIPE AND FITTINGS FOLLOWING APPLICABLE GOVERNING AUTHORITIES HAVING <br />JURISDICTION, UNLESS THE SPECIFICATIONS ARE MORE STRINGENT, <br />B. REMOVE TOREIGN MATTER AND ORT FROM INSIDE OF THE PIPE. KEEP PIPE CLEAN <br />DURING AND AFTER LAYING. <br />C. USE PROPER IMPLEMENTS, TOOLS, AND FACILITIES FOR THE SAFE AND PROPER <br />PROTECTION OF THE WORK. <br />C. 1. 1. LOWER PIPE INTO THE TRENCH IN SUCH A MANNER AS TO AVOID ANY <br />PHYSICAL DAMAGE 10 THE PIPE, <br />C.Z. Z. DO NOT DROP OR DUMP PIPE INTO TRENCHES UNDER ANY CIRCUMSTANCES. <br />C,3. 3. EXCAVATE BELL HOLES AT EACH JOINT OF PERMIT PROPER ASSEMBLY AND <br />INSPECTION OF ENTIRE JOINT, <br />D. STMT PIPC LAYING BY PROCEEDING UPGRADE WITH SPIGOT ENDS POINTING IN <br />THE DIRECTION OF THE FLOW, <br />0.1. I. ARER A SECTION OF PIPE HAS BEEN LOWERED INTO THE PREPARED <br />TflENCI✓: CLEAN THE END OF THE PIPE TO BE JOINED; THE INSIDE OF THE <br />JOINT; MID IF APPLICABLE, THE RUBBER RING IMMEDIATELY BEFORE JOINING <br />THE PPE. <br />D1. 2ASSE4BLE THE JOINT FOLLOWING MANUFACTURERS RECOMMENDATIONS FOR <br />TYPE OF JOINT USED, <br />E PROVOS ALL SPECIAL TOOLS AND APPLIANCES REQUIRED FOR THE JOINTING <br />ASSEMBLY. MAKE ALL DIRECTION CHANGES USING PROPER FITTINGS OR MANHOLES, <br />JOINT DEFLECTION WILL NOT BE ALLOWED, <br />F, LAY PIPES UNIFORMLY TO UNE AND GRADE SO THAT FINI94ED SEWER WILL <br />PRESENT A LP41FORM BORE, <br />F.I. VARl4TIGWS FROM UNE AND GRADE IN EXCESS OF THE SPECIFIED TOLERANCES <br />WILL BE CONSIDERED SUFFICIENT CAUSE FOR REJECTION OF THE WORK, <br />F.2. WHEN PIPES ME TO BE JOINTED WITH RUBBER GASKETS, WARM THE GASKET <br />OR JOIN MATERIAL SUFFICIENTLY TO FACILITATE MAKING A PROPER JOINT. <br />F.3. PREVENT EXCAVATED OR OTHER FOREIGN MATERIAL FROM GETTING IWO THE <br />PIPE WRING THE LAYING OPERATION, CLOSE AND BLOCK THE OPEN END OF <br />THE LASI WD SECTION OF PIPE TO PREVENT ENTRY OF FOREIGN MATERIA. <br />OR CREEP OF THE GASKETED JOINTS WHEN LAYING OPERATIONS ME NOT IN <br />PROGRESS, AT THE CLOSE OF THE DAYS WORK, OR WHENEVER THE WORKERS <br />ARE ABSENT FROM THE JOB. <br />F.4. IWNTAW A SWM OR DRAG IN THE LINE AND PULL PAST EACH JOINT AS IT <br />IS COAPEYED, <br />G PLUG OR CLOSE OFF PIPES WHICH ME STUBBED OFF FOR MANHOLE CONSTRUCTION <br />OR FOR CONNECRON BY OTHERS WITH TEMPORARY PLUGS, <br />H TAKE ALL NECESSARY PRECAUTIONS TO PREVENT THE 'UPUR' OR FLOATING OF <br />THE lWE PRIOR TO THE COMPLETION OF THE BACKFILLING OPERATION, <br />I. MAKE CONNECTIONS OF NON -REINFORCED PIPE TO MANHOLES OR CONCRETE <br />STRUCTURES, SO THAT A STANDARD PIPE JOINT IS LOCATED NOT MORE THAN ONE <br />FOOT FROM <br />HE OUTSIDE EDGE OF THE STRUCTURE. <br />J. WHEN FIELD CUTTING OR MACHINING THE PIPE 15 NECESSARY, USE ONLY TOOLS <br />AND All RECOMMENDED BY THE PIPE MANUFACTURER. <br />K. CHECK PIPE TOR ALIGNMENT AND GRADE AFTER JOINT HAS BEEN MADE. <br />K. 1, I. ENSURE PIPE BEDDING FORMS A CONTINUOUS AND UNIFORM BEARING AND <br />SUPPORT FOR THE PPE BARREL BETWEEN JOINTS. <br />K,2. 2. APPLY SUFFICIENT PRESSURE IN MAKING THE JOINT TO ASSURE THE JOINT IS <br />'110ME' AS DEFINED IN MMUFACIUREWS STANDARD INSTALLATION INSTRUCTIONS, <br />K.3. 3. PLACE SUFFICIENT PIPE COVER MATERIAL TO SECURE PIPE FROM MOVEMENT <br />FOR NE 1 <br />BE E % JOINT IS INSTALLED TO ASSURE PROPER PIPE ALIGNMENT AND <br />JOINT MAKEUP. <br />L EMPLOY SUCH MEMS AS WELL POINTING, DITCHING, PUMPING, OR BAILING TO <br />PREVENT WATER FROM ENTERING THE TRENCH DURING THE LAYING OPERATION AND <br />ALLOW FOR PROPER CONSTRUCTION OF THE BACKFILL IN THE PIPE ZONE, DO NOT <br />LAY PIPE IN WATER, <br />ARCO <br />BP WESTCOnSi PRDDlCiS,LLC <br />0 <br />2 <br />acCON <br />G4TANG ENGAN�gP <br />182'5 72ND AVENUE SOUTH <br />KENT, WA 98032 <br />(425)251-6222 <br />(425)251-8782 FA% <br />CLIVI ENGeEOBNG, UWO RM6%NC <br />SMIVEITNG. ENVVgN1iN1AL SOLACES <br />N0. DAIS eCW9M D[YAOIAN <br />I :-13-Ie ADrlelu.x <br />1 1-)Fle ApYI AL3UBWIMAN <br />NAL P. CRUBB <br />ARCO NTI <br />AMlPM <br />FUEL CANOPY <br />WITH 8 MPD's <br />NWC CHEROKEE ROAD <br />Y NEWTON fl0A0 <br />SAN JOAOUIN COUNtt, CALIFORNM <br />FACILITY #TBD <br />oRnwxc nlLc <br />ARCO SITE <br />SPECIFICATIONS <br />C7.1 <br />Cj <br />