Laserfiche WebLink
6" Min—►1 6 -P� <br />(TYP) <br />10" Min <br />OD <br />+ 20 Min <br />RIGID CONDUIT <br />Note 1 Below <br />-Existing <br />Pavement <br />See Note 2 Below <br />Compact in 12" max <br />layers to a min relative <br />compaction of 95% <br />under pavement and <br />% outside pavement, <br />-Compact in 24" max <br />layers to a min relative <br />compaction of 85%. <br />-Compact in 6" layer: <br />to a min relative <br />compaction of 90%. <br />10" Min <br />10" <br />FLEXIBLE CONDUIT <br />NOTES: <br />I. New pavement shall be 1" thicker than existing pavement, minimum <br />of 0.25 Ft. New base shall be 1" thicker than existing base, min of 0.50 Ft. <br />2. Select native material or imported granular material as approved by the Director <br />of Public Works. Backfill with materials equal to or better than the existing <br />pavement and base in quality. <br />3. Relative compaction of materials shall be tested in accordance with <br />the State of California, Dept. of Transportation Testing Manuals, test <br />method No. California 216 or 231. <br />4. All existing pavement shall be neatly cut to line prior to trench excavation. <br />5. Jetting or ponding will be permitted within the street right-of-way with <br />a 3 year bond, when approved by the Director of Public Works. <br />6. When shown by <br />compaction may <br />7. Special bedding <br />specified in the <br />soil composition and compactability, ninety <br />be used, when approved by the Director <br />and backfill requirements may be shown <br />special provisions. <br />TYPICAL TRENCH BACKFILL <br />percent (90%) <br />of Public Works. <br />on the plans or <br />COUNTY OF SAN JOAQUIN <br />DEPARTMENT OF PUBLIC WORKS <br />2" <br />Revision <br />Date: DEC 2014 Std. Dwg. No <br />Date <br />( <br />% <br />\\/ 3'-( <br />:ive <br />-------- <br />\\ Var <br />lt. <br />1 <br />\\ <br />X <br />Min <br />OD <br />10 h <br />0D <br />+ 20 Min <br />FLEXIBLE CONDUIT <br />NOTES: <br />I. New pavement shall be 1" thicker than existing pavement, minimum <br />of 0.25 Ft. New base shall be 1" thicker than existing base, min of 0.50 Ft. <br />2. Select native material or imported granular material as approved by the Director <br />of Public Works. Backfill with materials equal to or better than the existing <br />pavement and base in quality. <br />3. Relative compaction of materials shall be tested in accordance with <br />the State of California, Dept. of Transportation Testing Manuals, test <br />method No. California 216 or 231. <br />4. All existing pavement shall be neatly cut to line prior to trench excavation. <br />5. Jetting or ponding will be permitted within the street right-of-way with <br />a 3 year bond, when approved by the Director of Public Works. <br />6. When shown by <br />compaction may <br />7. Special bedding <br />specified in the <br />soil composition and compactability, ninety <br />be used, when approved by the Director <br />and backfill requirements may be shown <br />special provisions. <br />TYPICAL TRENCH BACKFILL <br />percent (90%) <br />of Public Works. <br />on the plans or <br />COUNTY OF SAN JOAQUIN <br />DEPARTMENT OF PUBLIC WORKS <br />2" <br />Revision <br />Date: DEC 2014 Std. Dwg. No <br />Date <br />