My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2019_PS-1903001 thru PS-1903500_ - PS-1903156
PublicWorks
>
- PUBLIC SERVICES
>
PERMITS & DEVELOPMENT
>
Encroachment(EP)/Driveway(DW) Permits
>
2019
>
PS-1903001 thru PS-1903500
>
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2019_PS-1903001 thru PS-1903500_ - PS-1903156
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/14/2024 3:04:04 PM
Creation date
6/14/2024 3:01:02 PM
Metadata
Fields
Template:
Permits_Development
DocName
PS-1903156
Category07
Encroachment(EP)/Driveway(DW) Permits
Year2
2019
Notes2
Guard Rd.; Cotta Rd.; Thornton Rd.
Type - Permit Process
Bell Hole
Address
PO Box 930, Stockton,CA 95201
Application
Pacific Gas & Electric-Stockton
Supplemental fields
Cross Ref
PWP730052
Type (2)
Encroachment Permit (EP)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
53
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
NOTES. <br />1. The resurfacing requirements shall be in addition to County Standard <br />Drawing No. R-29. <br />2. If longitudinal cuts are required on a Local Road a Seal Coat can be used <br />for that half of the roadway containing the trench. Section 2-5.03B-1. <br />Area <br />one (1) <br />overlay <br />planed, to <br />to be resurfaced with <br />inch Asphalt Concrete <br />existing surface to be <br />accommodate overlay. <br />Section 2-5.02B-2. <br />l <br />L <br />L <br />Area to be resurfaced with <br />one (1) inch Asphalt Concrete <br />overlay existing surface to be <br />planed to accommodate <br />overlay. Section 2-5.02B-2. <br />' waved Shoulder <br />3' minimum. <br />If <3', the remaining <br />pavement shall be removed <br />and replaced before <br />resurfacing. <br />Section 2-5.02B4. <br />Area to be resurfaced with <br />one (1) inch Asphalt <br />Concrete overlay existing <br />surface to be planed to <br />accommodate overlay. <br />Section 2-5.02B-1. <br />TRENCH CUTTING POLICY <br />LONGITUDINAL CUTTING <br />OF COUNTY ROADWAYS <br />COUNTY OF SAN TDAQUIN <br />DEPARTMENT OF PUBLIC WORKS <br />i <br />INo.I <br />Date: DEC 2014 <br />Revision Description I Date <br />Std. Dwg. No. R'37 <br />
The URL can be used to link to this page
Your browser does not support the video tag.