Laserfiche WebLink
NOTES. <br />1. The resurfacing requirements shall be in addition to County Standard <br />Drawing No. R-29. <br />2. If longitudinal cuts are required on a Local Road a Seal Coat can be used <br />for that half of the roadway containing the trench. Section 2-5.03B-1. <br />Area <br />one (1) <br />overlay <br />planed, to <br />to be resurfaced with <br />inch Asphalt Concrete <br />existing surface to be <br />accommodate overlay. <br />Section 2-5.02B-2. <br />l <br />L <br />L <br />Area to be resurfaced with <br />one (1) inch Asphalt Concrete <br />overlay existing surface to be <br />planed to accommodate <br />overlay. Section 2-5.02B-2. <br />' waved Shoulder <br />3' minimum. <br />If <3', the remaining <br />pavement shall be removed <br />and replaced before <br />resurfacing. <br />Section 2-5.02B4. <br />Area to be resurfaced with <br />one (1) inch Asphalt <br />Concrete overlay existing <br />surface to be planed to <br />accommodate overlay. <br />Section 2-5.02B-1. <br />TRENCH CUTTING POLICY <br />LONGITUDINAL CUTTING <br />OF COUNTY ROADWAYS <br />COUNTY OF SAN TDAQUIN <br />DEPARTMENT OF PUBLIC WORKS <br />i <br />INo.I <br />Date: DEC 2014 <br />Revision Description I Date <br />Std. Dwg. No. R'37 <br />