E <br />wm <br />C <br />1:3 <br />1 <br />SUMMARY OF PROPOSED WORK: <br />SEQUENCE OF OPERATIONS: <br />1 <br />sl 3 � 4 � 5 sl <br />CONSTRUCTION NOTES: <br />GENERAL REQUIREMENTS: <br />1. UNDERGROUND SERVICE ALERT: <br />CALL 811(1-800-227-2600) A MINIMUM OF 2 BUSINESS DAYS (NOT INCLUDING INITIAL DAY OF <br />CONTACT} IN ADVANCE FOR THE MARKING OF UNDERGROUND UTILITIES, INCLUDING ALL <br />NON -UTILITIES BEFORE YOU DIG, GRADE, OR EXCAVATE. <br />2. UTILITY NOTES: <br />A. DIMENSIONS SHOWN ON THESE DRAWINGS ARE BASED ON THE BEST AVAILABLE INFORMATION <br />FROM SEVERAL SOURCES, AND SHALL BE VERIFIED IN THE FIELD BY CONSTRUCTION PERSONNEL <br />PRIOR TO FABRICATION. <br />B, THE INFORMATION SHOWN ON THESE DRAWINGS CONCERNING TYPE AND LOCATION OF <br />UNDERGROUND UTILITIES, PROPERTY LINES, AND OTHER SUBSTRUCTURES IS NOT GUARANTEED <br />TO BEACCURATE ORALL-INCLUSIVE, UNLESS OTHERWISE NOTED. CONSTRUCTION PERSONNEL <br />ARE RESPONSIBLE FOR MAKING ALL DETERMINATIONS AS TO THE TYPE AND LOCATION OF <br />UNDERGROUND UTILITIES AND OTHER SUBSTRUCTURES AS NECESSARY TO AVOID DAMAGE OR <br />ENCROACHMENTS, <br />C. PROSPECTING IS REQUIRED AHEAD OF WORK. ALL OFFSETS OR ROPING WILL NEED TO BE <br />APPROVED BYTHE PG&E PROTECT ENGINEER (PED), AND REDLINED DETAILS SHOWN ON PROFILE <br />AND CONSTRUCTION DETAIL SHEETS OF EACH ADDITIONAL SUBSTRUCTURE. <br />D. ALL EXCAVATIONS WITHIN EXISTING STATIONS SHALL BE HAND DUG OR EXCAVATED USING SOFT <br />DIG MEFHODS (e -g. VACUUM EXCAVATIONS OR SIMILAR). <br />3. ELBOWS AND FIELD BENDS: <br />A. ALL BENDS ARE SMOOTH FIELD BENDS, EXCEPT WHERE ELBOWS ARE SHOWN. FIELD BENDS <br />SHALL BE MADE IN ACCORDANCE WITH A-36, SECTION 4D. FIELD BENDS MAY BE USED IN LIEU <br />OF ELBOWS WHEN PREAPPROYED BYTHE PG&E PROJECT ENGINEER (PED). <br />B. IN ORDERTO AVOID EXCESSIVE STRAIN ON THE PIPELINE, THERE SHALL BEA MINIMUM <br />SEPARATION OF 5 FEET BETWEEN A ROPED SECTION OF PIPELINE AND ANY ELBOWS OR FIELD <br />BENDS. <br />C. ALL ANGLES SHOWN IN THE PLAN AND PROFILE ARE APPROXIMATE AND SHALL BE CUTTO SUIT <br />FIELD CONDITIONS. <br />4. SEPARATION FROM OTHER STRUCTURES: <br />A. CROSSING UNDERGROUND FACILITIES: PG&E PIPELINE MUST BE INSTALLED WITH AT LEAST <br />24 INCHES OF CLEARANCE FROM ANY OTHER SUBSTRUCTURE/UTILITY NOTASSOCIATED WITH <br />THE PIPELINE UNLESS NOTED ON THE DRAWINGS. <br />B. PARALLELING UNDERGROUND FACILITIES: THIS PIPELINE MUST BE INSTALLED WITH AT LEAST <br />5 FEET OF CLEARANCE FROM ANY OTHER UNDERGROUND STRUCTURE/UTILITY NOT ASSOCIATED <br />WITH THE PIPELINE UNLESS NOTED ON THE DRAWINGS. <br />5. RESTORATION AND CLEAN UP: <br />A. RESTORATION OF PUBLIC STREETS, SIDEWALKS, CURBS, ETC. ABOVE PIPE BEDDING SHALL BE IN <br />ACCORDANCE WITH THE LATEST CITY, COUNTY, OR AGENCY STANDARDS. <br />B. WHERE EVER THERE ARE ROW CROPS, THE TOPSOIL SHALL BE REMOVED TO A DEPTH OF 12" AND <br />STORED ON SITE. UPON COMPLETION OF CONSTRUCTION, THE TOPSOIL SHALL BE RESTORED. <br />TAKE CARE TO PREVENT MIXING OF TOPSOIL AND SUBSOIL. <br />6. DESIGN NOTES: <br />A.THIS DRAWING HAS BEEN CREATED 8Y REVIEW OFTHE AS -BUILT DRAWINGS &RECORDS. <br />ACCURACY IS DEPENDENT UPON THE SOURCE DOCUMENT LISTED ON THE REFERENCE <br />DRAWINGS. <br />7. WELDING REQUIREMENTS: <br />A. ALL ARC WELDING IS TO BE PERFORMED IN ACCORDANCE WITH THE GAS WELDING CONTROL <br />MANUAL TD -4160M. ALL CANS OR SPOOLS SHALL BE A MINIMUM LENGTH OF ONE PIPE DIAMETER, <br />WHENEVER POSSIBLE. <br />B, INSTALL TEST STATIONS WITH THERMITE WELD CONNECTION IN ACCORDANCE WITH GAS T & D <br />CORROSION CONTROL MANUAL 0-10, 0-10.1 AND 0-10.2. <br />8. WELDING: <br />WHEN INTERNAL MISALIGNMENT EXCEEDS 0.094", BACKWELD ANY GIRTH WELD WHERE THERE IS <br />ACCESSTO THE INSIDE OFTHE WELD. WHERE THERE IS NO ACCESSTOTHE INSIDE OFTHE WELD, <br />MACHINE BORING OR GRINDING IS REQUIRED. BACKWELDING, GRINDING, OR BORING MUST BE <br />DONE IN ACCORDANCE WITH THE APPROPRIATE UTILITY PROCEDURE IN THE GAS WELDING CONTROL <br />MANUAL TD -4160M. <br />9. STRENGTH TEST REQUIREMENTS <br />A. STRENGTH TESTING SHALL MEET PRESSURE AND DURATION REQUIREMENTS OF GAS STANDARD <br />A-34 AND SHALL BE CONDUCTED IN ACCORDANCE WITH UTILITY PROCEDURE TD -41375. <br />B. ALL WELDS THAT HAVE NOT BEEN STRENGTH TESTED AND ALL FITTINGS SHALL BE SOAP TESTED AT <br />100 PSI ANDATOPERATING PRESSURE BEFORE COATING CAN OCCUR. <br />10. COATING REQUIREMENTS: <br />A. ALL EXPOSED PIPE AND FITTINGSARETO BE COATED IN ACCORDANCE WITH GAS STANDARD <br />E-30. ALL COATING ON BURIED PIPE AND FITTINGS ARE TO BE APPLIED IN ACCORDANCE WITH <br />GAS STANDARD E-35. <br />B. FOR COATING SELECTIONS ON BURIED PIPE, SEE DIRECT BURIAL COATING SELECTIONS TABLE. <br />C. CONTACTTHEPROJECT ENGINEER (PED) TO REQUEST VARIANCE FROM THE <br />APPROVED COATING PRODUCTS. <br />11. INSPECTION OF EXISTING PIPELINE: <br />A. WHENEVER EXISTING BURIED GAS FACILITIES ARE EXCAVATED DURING ENGINEERING OR DURING <br />CONSTRUCTION, FOLLOW TD-5100P-Ol TO DOCUMENT PIPE INSPECTION. THIS APPLIES TO EXISTING <br />AND TO BE RETIRED FACILITIES. <br />B. EXISTING GIRTH WELDS, ATTIE-IN LOCATIONS, SHALL BE IDENTIFIED AND REMOVED IF PRACTICAL. <br />C. PRIOR TOTIE-I N, INSPECT COATING AND PIPE FOR DEFECTS. IF DEFECTS ARE FOUND, <br />CONTACT PROJECT ENGINEER (PED) FOR GUIDANCE. <br />12. TIE-IN AND CLEARANCE PROCEDURE TO BE PREPARED AND PERFORMED IN ACCORDANCE WITH <br />THE FOLLOWING WORK PROCEDURES: <br />A. TD -4100P-01, HOT AND COLD WORK METHODS FOR NATURAL GAS TRANSMISSION PIPELINE <br />SHUTDOWN AND TIE-IN. <br />B. TD -44415, GAS CLEARANCE PROCEDURES FOR FACILITIES OPERATING OVER 60 PSIG. <br />of 3 <br />WARNING <br />THIS DOCUMENT CONTAINS '-�� <br />CONFIDENTIAL, PROPRIETARY <br />INFORMATION THATISTHE SOLE <br />PROPERTY OF PACIFIC GAS AND <br />ELECTRIC COMPANY AND IS <br />INTENDED FOR USE ONLY BY <br />AUTHORIZED PACIFIC GAS AND <OOIMMh8i6 UBIOw. <br />ELECTRIC COMPANY EMPLOYEES <br />AND ITS AGENTS. _ CHIIneIOreYOU q19. <br />5 �I <br />6 � 7 � °�8 <br />13. COATING REMOVAL: <br />A. PERFORM THE FOLLOWING STEPS, IN ACCORDANCE WITH TD-4711P-Ol, BEFORE REMOVING <br />ASPHALTIC PIPE WRAP ON PIPELINES INSTALLED PRIOR TO 1972 (BASED ON PG&E ANALYSIS, <br />PIPE INSTALLED IN 1972 OR LATER DOES NOT HAVE PIPE WRAP THAT CONTAINS ASBESTOS): <br />1. WHEN A PIPE WRAP SAMPLE IS REQUIRED TO BE ANALYZED FOR ASBESTOS: <br />a. COLLECT SAMPLE PER TD -4711P-01 AND COMPLETE CHAIN OF CUSTODY FORM <br />TD -4711P -01-F01. <br />b. FILE PINK COPY OF THE CHAIN OF CUSTODY FORM AND FINAL LABORATORY RESULTS <br />WITH THE AS-BUILTS. <br />2. WHEN REMOVING PIPE WRAP THAT CONTAINS ASBESTOS, OR FOR EMERGENCY WORK, <br />FOLLOW TD -4711P-01 "PIPE WRAP REMOVAL, HANDLING AND DISPOSAL". <br />CATHODIC PROTECTION NOTES: <br />1. FOLLOW TD -5100P-01 TO DOCUMENT INTERNALCORROSION AND EXTERNAL CORROSION <br />INSPECTION OF THE PIPELINE. <br />2. UPON COMPLETION OF BORINGS, CONTACTTHE CORROSION SUPERVISOR FORTHE LOCAL <br />AREA/DIVISION TO PERFORM CURRENT DRAIN TESTS ON THE PIPELINE SEGMENT THAT <br />WAS INSTALLED IN THE BORE. THE CURRENT DRAIN TEST MUST BE PERFORMED PRIOR TO <br />WELDING PIPE ON EITHER SIDE OF THE BORE. <br />3. FOR THE INSTALLATION OFTHE WATCHDOG RECTIFIER REMOTE MONITOR, CONTACT THE <br />CORROSION SUPERVISOR FORTHE LOCALAREA/DIVISION. <br />4. BONDING CABLES TO BE INSTALLED ACROSS PIPELINE CUT-OUTS AT ALL LOCATIONS THE <br />PIPELINE IS SEVERED PRIOR TO REMOVAL. CHAIN CLAMPS, MAGNETIC CLAMPS, OR OTHER <br />CONSTRUCTION MANAGEMENT APPROVED CLAMPS AND #6 (MIN} STRANDED CABLE SHALL <br />BE UTILIZED. CLAMPS TO REMAIN IN PLACE UNTIL PIPELINE IS TIED IN. <br />RETIREMENT PROCEDURE FOR EXISTING PIPE: <br />1. GT&D UTILITY WORK PROCEDURE TD 9500P-16, "DEACTIVATION AND/OR RETIREMENT OF <br />UNDERGROUND GAS FACILITIES," SHALL BE FOLLOWED. <br />2. THE EXISTING PIPE SECTIONS SHALL HAVE FREE LIQUIDS REMOVED AND BE 100% PURGED <br />PER GAS DESIGN STANDARD A-38, "PROCEDURES FOR PURGING GAS FACILITIES." <br />3. THE PIPE SHALL BE SECTIONALIZED AT INTERVALS AS SPECIFIED IN THE RETIREMENT PLAN. <br />THE LOCATIONS CALLED OUT ARE APPROXIMATE AND ARE SUBJECT TO FIELD VERIFICATION TO <br />IDENTIFYTHE MOSTOPTIMUM LOCATION IN THAT VICINITY. ACCURATE SURVEY DATA MAY <br />NOT BE AVAILABLE FOR THESE LOCATIONS SO USE CAUTION DURING EXCAVATION AND WHEN <br />IDENTIFYING THE PIPELINE TO BE RETIRED. OTHER ACTIVE PIPELINES MAY BE IN THE AREA. <br />4. AT EACH SUCH LOCATION NOTED ABOVE, A PIECE OF PIPE AT LEAST 24" LONG SHALL BE <br />REMOVED. INSTALL A 1" HIGH PRESSURE SAVE -A -VALVE (H-17491, M022287) TO CHECK FOR <br />PRODUCiAND PRESSURE PRIORTO CUTTING INTOTHE PIPELINE. THE OPEN ENDS OF THE <br />RETIRED PIPE SHALL BE SEALED BY THE MOST APPROPRIATE METHOD OUTLINED IN GT&D <br />UTILITY WORK PROCEDURE TD -9500P-16. BACKFILL MUST BE THOROUGHLY COMPACTED IN <br />PLACE OF THE REMOVED SECTION OF PIPE. <br />DESIGN CHANGE PROCEDURE <br />MAINTENANCE AND CONSTRUCTION PERSONNEL MUST OBTAIN APPROVAL FROM THE PROJECT <br />ENGINEER (PED) BEFORE MAKING ANY DESIGN CHANGE TO GAS FACILITIES PER TD -4014P-01. <br />PROJECT SPECIFIC NOTES: <br />REFERENCE R-1100 ORDER NUMBER 74015657 FOR L-1966-7 MP 2.66 RETIREMENTAT W. COTTA RD BRIDGE <br />�I <br />CONTACT INFORMATION: <br />PROJECT MANAGER <br />--- DEAN KOLNES <br />PROJECT' ENGINEER <br />(PED) <br />---- NICHOLE REYES <br />PIPELINE ENGINEER <br />(PLE) <br />--- STEPHEN NELSON <br />ESTIMATOR /DESIGNER <br />---- RYAN MOORE <br />LAND PLANNER <br />---- KAT LAI <br />DISTRIBUTION PLANNER <br />--- DAVE RYMERS <br />TRANSMISSION PLANNER <br />---- JEN CELLUCCI <br />10 <br />925-244-3648 <br />415-961-8902 <br />916-203-1622 <br />916-472-2156 <br />925-872-0067 <br />209-942-1626 <br />916-472-219D <br />REFERENCE DRAWINGS: <br />OPERATING MAPS ---- 382899-1 <br />OPERATING DIAGRAMS ---- N/A <br />PLAT SHEETS ---- 2863 -63;2863 -C3;2868 -D3;2868 -D2; <br />2868-D1; 2867-D8; 2867-E8; 2867-F8; <br />2867-G8; 2867-G7; 2867-H8; 2867-H7; <br />2867-17; 2867-18; 2867-J8 <br />PIPELINE -CONSTRUCTION NOTES <br />L-196, L-1966-7, L-1966-1 <br />RETIRE 9 MILES <br />LODI, SAN JOAQUIN COUNTY <br />-10.19 ISSUED FOR PERMITTING 74015658 RWM KJT6 N1RD <br />-28-19 ISSUED FOR 30X REVIEW 74015658 RWM K1T6 N1RD GAS TRANSMISSION &DISTRIBUTION <br />DATE DFSCRIFHON ORDER DWN ADE ENG ENGAPYD PACIFIC GAS AND ELECTRIC COMPANY <br />REVISIONS SAN FRANCISCO, CALIFORNIA <br />6 7 e (g 6 4 g 3 <br />74015858SOD2CN.dan <br />ISSUED FOR <br />PERMITTING <br />ONLY <br />PACIFIC GAS AND <br />ELECTRIC COMPANY <br />BILL OF MATL SHEET I4 <br />�D R-1104 <br />SHEET NO. 2 OF 14 SHEETS <br />74015658 B <br />2 1 'lO 0 INCH <br />16MAY-201906>17AM <br />E <br />(] <br />:3 <br />AE <br />