My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2019_PS-1903001 thru PS-1903500_ - PS-1903156
PublicWorks
>
- PUBLIC SERVICES
>
PERMITS & DEVELOPMENT
>
Encroachment(EP)/Driveway(DW) Permits
>
2019
>
PS-1903001 thru PS-1903500
>
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2019_PS-1903001 thru PS-1903500_ - PS-1903156
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/14/2024 3:04:04 PM
Creation date
6/14/2024 3:01:02 PM
Metadata
Fields
Template:
Permits_Development
DocName
PS-1903156
Category07
Encroachment(EP)/Driveway(DW) Permits
Year2
2019
Notes2
Guard Rd.; Cotta Rd.; Thornton Rd.
Type - Permit Process
Bell Hole
Address
PO Box 930, Stockton,CA 95201
Application
Pacific Gas & Electric-Stockton
Supplemental fields
Cross Ref
PWP730052
Type (2)
Encroachment Permit (EP)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
53
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
2. Cross -cutting is allowed under the same conditions as Section <br />2-5.02E-3. If cross -cuts occur within the 150 feet minimum interval, <br />resurfacing may be substituted with a slurry seal for that half of <br />the roadway. (See County Standard Drawing No. R-36). <br />2-5.04 Exceptions <br />Excavation is prohibited in newly renovated County roadways for three (3) <br />years after a notice of completion has been filed for a roadway improvement <br />project, or a new roadway has been accepted. The Director of Public Works <br />may approve exceptions that are in the best interest of the public, including <br />but not limited to: <br />A. An emergency that endangers life or property. <br />B. For repair or modification to prevent interruption of essential utility <br />service. <br />C. For relocation work that is mandated by County, State or Federal <br />law. <br />D. For service for buildings where no other reasonable means of <br />providing service exists. <br />E. For potholing to verify utility depth or location. <br />F. For trenchless excavations greater than three feet in depth of cover <br />over the utility facility, and not requiring a significant surface <br />Incision greater than industry bore pit standards. <br />Exceptions must be requested and submitted in writing to the Department. <br />Payment of a nonrefundable processing fee is also required. Exceptions <br />will be reviewed using the Departments Action Approval process, which <br />requires the recommendation of a Deputy Director. <br />43 <br />
The URL can be used to link to this page
Your browser does not support the video tag.