Laserfiche WebLink
NOTLS: <br />1 <br />2 <br />4, <br />If the distance between cross—cuts are less then 150 the entire area between <br />corss—cuts shall be planed and resurfaced with one (1) inch of Asphalt Concrete, <br />The resurfacing requirements shall be in addition to County Standard Drawina No. <br />R-29. <br />Resurfacing for Bell Holes shall meet these <br />the shoulder or lane, only that area shall b <br />If cross—cutting is performed on Local Roac <br />Coat for that half of the roadway containinc <br />resurfacing. Section 2-5.03B-2. <br />Paved Shoulder <br />!LTJ <br />requirements, If excavation occurs within <br />resufaced as shown. <br />s it intervals less then 150' a Seal <br />the trench can be used in lieu of <br />c � <br />o <br />U�U <br />D C:N O <br />O <br />o, a <br />N <br />a� Q <br />O O <br />L <br />O U <br />U <br />0 <br />U <br />Approved by: <br />n I Date <br />N <br />U <br />0 <br />U <br />Approved by: <br />n I Date <br />