My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2018_PS-1802501 thru PS-1803000_ - PS-1802794 Rider #1 1-16-20
PublicWorks
>
- PUBLIC SERVICES
>
PERMITS & DEVELOPMENT
>
Encroachment(EP)/Driveway(DW) Permits
>
2018
>
PS-1802501 thru PS-1803000
>
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2018_PS-1802501 thru PS-1803000_ - PS-1802794 Rider #1 1-16-20
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/19/2024 10:50:18 AM
Creation date
6/19/2024 10:48:54 AM
Metadata
Fields
Template:
Permits_Development
DocName
PS-1802794
Category07
Encroachment(EP)/Driveway(DW) Permits
Year2
2018
Notes2
S/S of Collier Rd. 1500' W/O St. Rte. 99
Type - Permit Process
Collier Road Improvements
Address
847 N. Cluff Ave., STE B1, Lodi,CA 95240
Application
Lenz Lantz Development, LLC
Supplemental fields
Cross Ref
PWP790107
Type (2)
Encroachment Permit (EP)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
stru <br />December 26, 2019 <br />Re: Solar Light Pole <br />3222 Collier Road, East <br />Acampo, CA <br />To whom it may concern: <br />Aostructures Inc. <br />916.541.8586 <br />S <br />ures <br />vww.AOstructures.com Address: 3222 Collier Rd E, Acampo, CA 95220, USA <br />This letter is in reference to the proposed steel pole and concrete pier design to support a solar <br />light and battery system at the above referenced project location. The calculations and plans <br />that follow are designed with the following design criteria: <br />Design Criteria: <br />Building Code Used: 2016 CBC, ASCE 7-10 <br />Risk Category II Structure <br />Wind: 110 mph, Exposure C <br />Seismic: Sds = 0.574 <br />Fp = 0.37k <br />Max equipment weight = 500# <br />Scope of Work: <br />Provide design of steel post and concrete pier to support a solar light system. <br />Materials Specifications: <br />All concrete shall be 2,500 psi at 28 days <br />All steel shall be galvanized for use in exterior environments <br />If you have any questions on the above, do not hesitate to call. <br />Sincerely, <br />Andrew Oesterreicher, PE <br />Wind Design <br />Exposure: C <br />Wind Speed: 110 mph <br />Risk Category: II <br />AOstructures Inc. <br />PO Box 413 <br />Carnelian Bay, CA 96140 <br />916.541.8586 <br />www.AO structu res.com <br />Magnolia Solar Light - Calcs 1 <br />LENZI SOLAR <br />LENZI INCORPORATED <br />CSLB # 1007527 <br />847 N. CLUFF AVE, SUITE B 1 <br />LODI, CA 95240 <br />(209) 224-5950 <br />www.lenzlconstructionandsolar.com <br />ect: <br />SOLAR LIGHT POLE <br />3222 COLLIER RD, EAST <br />ACAMPO CA 95220 <br />Project Details: <br />PV ARRAY: 550 W <br />BATTERY BANK: 224 Ah, 5.4 kW <br />REVISIONS <br />DESCRIPTION DATE REV <br />PERMIT SET <br />12/31/2019 A <br />Sheet Title: <br />STRU CTU f�AL <br />CALCULATIONS <br />Sheet Number: <br />i5400 <br />Sheet Stze: <br />MNG BY: <br />� <br />CARDWELLGGG✓ <br />SepiPSEoYIp�r <br />Reviewed � Approved by: <br />CM <br />
The URL can be used to link to this page
Your browser does not support the video tag.