Laserfiche WebLink
I <br />PORTABLE CHANGEABLE MESSAGE SIGN <br />Location Quantity <br />State Route 26 (WB and EB) & Wall Road (SB) 3 EA <br />Tota 1 3 EA <br />PLANING ASPHALT CONCRETE PAVEMENT <br />Location Quantity <br />Sta 11+83 to Sta 12+03 53 SQYD <br />Sta 84+17 to Sta 84+42 192 SQYD <br />Walnut Drive — Sto 10+37 to Sta 10+62 63 SQYD <br />Total 308 SQYD <br />PAVEMENT REPAIR <br />Location Quantity <br />Various Locations 260 SQYD <br />Total 260 SQYD <br />ROADWAY EXCAVATION <br />Location Quantity <br />Sta 9+97 to Sta 11+83 294 CY <br />Total 294 CY <br />�11111F[fljjw <br />EARTHWORK (MISCELLANEOUS AREAS) <br />Location Quantity <br />Sta 9+87 to Sta 11+83 Lt 2.0 STA <br />Sta 10+05 to Sta 12+25 Rt 2.2 STA <br />Total 4.2 STA I <br />SHOULDER BACKING <br />Location Quantity <br />Sta 9+87 to Sta 84+42 1,030 TON <br />Total 1,030 TON <br />DRIVEWAY (TYPE D) <br />Location Quantity <br />11 Locations 319 SQYD <br />Total 319 SQYD <br />DRIVEWAY (TYPE E) <br />Location Quantity <br />14 Locations 531 SQYD <br />Total 531 SQYD <br />CLASS 2 AGGREGATE BASE <br />Location Quantity <br />Sta 9+97 to Sta 11+83 129 CY <br />Total 129 CY <br />PENETRATION TREATMENT <br />Location Quantity <br />At State Route 26 46 SQYD <br />At Walnut Drive 111 SQYD <br />At Comstock Road 118 SQYD <br />Total 275 SQYD <br />HOT MIX ASPHALT (TYPE A) <br />Location <br />Quantity <br />Mainline Overlay <br />SUMMARY OF <br />Sta 11 +83 to Sta 83+92 <br />3,122 <br />TON <br />Road Reconstruction <br />Sto 9+97 to Sta 11+83 <br />172 <br />TON <br />Variable Depth Overlay <br />DATE <br />Sta 83+92 to Sta 84+42 <br />29 <br />TON <br />Walnut Drive — Sta 10+12 to Sta 10+62 <br />21 <br />TON <br />Pavement Repair <br />87 <br />TON <br />Driveway ( Type D) <br />64 <br />TON <br />Driveway (Type E) <br />39 <br />TON <br />COUNTY OF SAN JOAQUIN <br />NOT TO <br />SCALE <br />SUMMARY OF <br />QUANTITIES <br />DRAWN BY DATE PR JECT ENGINEER <br />DATE <br />CHECKED <br />DATE <br />Waoiy�-/R. Yamada 3/15 <br />3/d711 <br />• 2)4, -r -v <br />3/27i/ <br />To'LaI 3,534 TON <br />GEOSYNTHETIC PAVEMENT INTERLAYER <br />(PAVING FABRIC) <br />Location Quantity <br />Sta 11+83 to Sta 84+17 17,683 SQYD <br />Total 17,683 SQYD <br />PLACE MONUMENT FRAME AND COVER <br />Location Quantity <br />Sta 44+83 1 EA <br />Total 1 EA <br />THERMOPLASTIC PAVEMENT MARKINGS <br />Location Quantity <br />Sta 9+85 Lt, Limit Line (white) 24 SQFT <br />Sta 9+96 Lt, `STOP' (white) 22 SQFT <br />Total 46 SQFT <br />4" THERMOPLASTIC TRAFFIC STRIPE <br />Location Quantity <br />Sta 9+89 to Sta 10+89 (yellow) 200 LF <br />Total 200 LF <br />PAVEMENT MARKER <br />Location Quantity <br />Sta 9+89 to Sta 10+89 10 EA <br />Tota 1 10 EA <br />iWOV4rN FARKI. <br />. - I0J.910 fo 50W 11053 <br />'4AWIN <br />R*,v F/fc %l4,rl - <br />1-/9- za6 <br />WALL ROAD RESURFACING <br />(State Route 26 to Comstock Road) <br />Sheet No. <br />10 of 10 <br />