My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PW-ENCROACH-2401412
PublicWorks
>
- PUBLIC SERVICES
>
PERMITS & DEVELOPMENT
>
Encroachment(EP)/Driveway(DW) Permits
>
2024
>
PW-ENCROACH-2401001 thru PW-ENCROACH-2401500
>
PW-ENCROACH-2401412
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2024 11:52:28 AM
Creation date
8/22/2024 11:52:16 AM
Metadata
Fields
Template:
Permits_Development
DocName
PW-ENCROACH-2401412
Category07
Encroachment(EP)/Driveway(DW) Permits
Year2
2024
Notes2
Near Jack Tone Rd. & Mariposa Rd. Intersection
Type - Permit Process
Soil Sampling Borings for County Project
Address
4701 Freeport Blvd., Sacramento,CA 95822
Application
Crawford & Associates, Inc.
Project #
222330
Supplemental fields
Type (2)
Encroachment Permit (EP)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
X:\ E N C R O A C H M E N T S\ General Provisions ( Encroach ment Per mits)\ Winter Weat her Provisions.docx <br /> <br /> <br /> <br /> <br /> S P E CI A L P R O VI SI O N S S P E CI A L P R O VI SI O N S <br /> <br /> Wi nter Weather Utility Work <br />__________________________________________________________________________________________ <br />__________________________________________________________________________________________ <br /> <br /> <br />1. S U P E R VI SI O N: The utility co mpany (per mittee) shall furnish full-ti me supervision of all work to insure <br />co mpliance with the per mit provision. <br /> <br />2. S T A R T O F W O R K: No work within the County right-of- way shall be started until the utility co mpany <br />representative has made an evaluation of weather conditions and has deter mined the work can be <br />acco mplished under the provisions of the per mit. <br /> <br />3. C L E A N P A V E M E N T: Dirt and mud shall not be deposited on the pave ment outside the area of work, <br />and if inadvertently tracked onto the road travel way shall be re moved i m mediately. <br /> <br />4. D AI L Y R E S T O R A TI O N: Private drive ways and road intersections shall be restored daily. <br /> <br />5. W E A T H E R- TI G H T C O N DI TI O N S: All trenches shall be filled and co mpacted, ditches and other <br />drainage facilities regarded and opened, and the entire work area restored to weather-tight condition prior to <br />any rain.
The URL can be used to link to this page
Your browser does not support the video tag.