My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GOVT BLDG 15-026 to GOVT BLDG 15-094
PublicWorks
>
VAULT MAPS
>
Government Buildings - GOVT BLDG
>
15
>
GOVT BLDG 15-026 to GOVT BLDG 15-094
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/30/2024 1:51:11 PM
Creation date
10/4/2024 11:56:27 AM
Metadata
Fields
Template:
Government Buildings - GOVT BLDG
Project
North County Recycling Center and Sanitary Landfill
Year
1991
Supplemental fields
Classification
Record Drawings
Cross Ref
GOVT BLDG 15-26 to GOVT BLDG 15-094
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
68
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
A <br />C <br />D' <br />SECOND FLOOR LIGHTING PLAN <br />1/8,._1,_O„ <br />tAJEL TAS1 <br />m <br />DNT'D ON <br />ST. FLR. <br />X5'35 <br />�-i <br />1-50 MH 9' H8 6 <br />10 <br />3 1 1-150 E9 , <br />M H 17' 1 4 12 PLC'S <br />MH 20' <br />E9 2 PLC's FIRST FLOOR LIGHTING PLAN <br />1/8"=1'—O„ <br />F <br />H11 <br />1-15o MH 22' <br />1 <br />H 1 1 <br />1-15o MH 22' <br />1 <br />Emcon <br />Associates <br />NOTES: <br />❑1 UNLESS SHOWN OTHERWISE, EACH CONDUIT WILL CONTAIN <br />THREE NO. 12 AWG WIRES ONE HOT, ONE NEUTRAL AND <br />ONE GROUND. SWITCH LEGS WILL CONTAIN TWO HOT AND <br />ONE GROUND. <br />2] FOR FIXTURE SCHEDULE SEE DRAWING E7. <br />D3 ROUTE HOMERUN TO PANELBOARD VIA LIGHTING CONTROL <br />PANEL "LC". <br />® IF NECESSARY ADJUST MOUNTING HIGHT TO MAINTAIN <br />BRIDGE CRANE CLEARANCE. <br />QRpf ESS/p� yy.. <br />�� PROFS �y <br />No. 11544 <br />Exp. <br />lkc <br />qlF OF CAOVZZ <br />SAN JOAQUIN COUNTY <br />NORTH COUNTY SANITARY LANDFILL <br />SAN JOAQUIN COUNTY, CALIFORNIA <br />OFFICE/MAINTENANCE LIGHTING PLAN <br />RAWING N0 <br />E5 <br />PROJECT NO. <br />939-02.43 <br />KCVVKV UKAWINU <br />1 <br />3/26/92 <br />RECORD DRAWING—PER CONTRACTOR <br />0 <br />2/2/91 <br />ISSUED FOR CONSTRUCTION <br />REV I <br />DATE <br />DESCRIPTION <br />DWN B <br />D_ES Y <br />C K BY <br />AP B <br />DATE OF ISSUE DWN BY K BIBY X CHK BY <br />FEB_1991 DES BY____? APP BY r .tet <br />F <br />H11 <br />1-15o MH 22' <br />1 <br />H 1 1 <br />1-15o MH 22' <br />1 <br />Emcon <br />Associates <br />NOTES: <br />❑1 UNLESS SHOWN OTHERWISE, EACH CONDUIT WILL CONTAIN <br />THREE NO. 12 AWG WIRES ONE HOT, ONE NEUTRAL AND <br />ONE GROUND. SWITCH LEGS WILL CONTAIN TWO HOT AND <br />ONE GROUND. <br />2] FOR FIXTURE SCHEDULE SEE DRAWING E7. <br />D3 ROUTE HOMERUN TO PANELBOARD VIA LIGHTING CONTROL <br />PANEL "LC". <br />® IF NECESSARY ADJUST MOUNTING HIGHT TO MAINTAIN <br />BRIDGE CRANE CLEARANCE. <br />QRpf ESS/p� yy.. <br />�� PROFS �y <br />No. 11544 <br />Exp. <br />lkc <br />qlF OF CAOVZZ <br />SAN JOAQUIN COUNTY <br />NORTH COUNTY SANITARY LANDFILL <br />SAN JOAQUIN COUNTY, CALIFORNIA <br />OFFICE/MAINTENANCE LIGHTING PLAN <br />RAWING N0 <br />E5 <br />PROJECT NO. <br />939-02.43 <br />KCVVKV UKAWINU <br />
The URL can be used to link to this page
Your browser does not support the video tag.