Laserfiche WebLink
CERTIFICATE OF COMPLIANCE (Part 1 of 4) LTG -1 - <br />PROJECT NAME <br />DATE <br />Wilhelmina Lift Station <br />3/28/2006 <br />PROJECT ADDRESS <br />Elec. Room <br />Stockton <br />154 <br />PRINCIPAL DESIGNER - LIGHTING <br />TELEPHONE <br />Building Permit It <br />Interface Engineering <br />capable of automatically shutting off the lighting. <br />❑ LTG -2-A: Lighting Control Acceptance Document <br />DOCUMENTATION AUTHOR <br />TELEPHONE <br />Checked by/Date <br />INTERFACE ENGINEERING <br />(916) 288-6200 <br />Enforcement ftency Use <br />GENERAL INFORMATION <br />DATE OF PLANS <br />UILDING CONDITIONED FLOOR AREA <br />CLIMATE ZONE <br />❑ LTG -3-A: Automatic Daylighting Controls Acceptance Document <br />209 Sq.Ft. <br />1 12 <br />BUILDING TYPE ® NONRESIDENTIAL HIGH RISE RESIDENTIAL ❑ HOTELIMOTEL GUEST ROOM <br />® CONDrriONED SPACES® UNCONDITIONED SPACES INDOOR 8: OUTDOOR SIGNS <br />PHASE OF CONSTRUCTION [K NEW CONSTRUCTION ADDITION ALTERATION <br />METHOD OF LIGHTING EJ COMPLETE BUILDING ® AREA CATEGORY E] TAILORED [:] PERFORMANCE <br />COMPLIANCE [:] COMMON LIGHTING <br />STATEMENT OF COMPLIANCE <br />This Certificate of Compliance lists the building features and performance specifications needed to comply with Title 24, <br />Parts 1 and 6 of the California Code of Regulations. This certificate applies only to building lighting requirements. <br />The documentation preparer hereby certifies that the documentation is accurate and complete. <br />DOCUMENTATION AUTHOR <br />SIGNATURE <br />DATE <br />Interface Engineering <br />The Principal Lighting Designer hereby certifies that the proposed building design represented in this set of construction <br />documents is consistent with the other compliance forms and worksheets, with the specifications, and with any other <br />Calculations submitted with this permit application. The proposed building has been designed to meet the lighting <br />requirements contained in Sections 110, 119, 130 through 132, and 146, 148 and 149 of Title 24, Part 6. <br />Please Check One: (These sections of the Business and Professions Code are printed in full in the Nonresidential Manual.) <br />® I hereby affirm that I am eligible under the provisions of Division 3 of the Business and Professions Code to sign this <br />document as the person responsible for its preparation; and that I am licensed in the State of California as a civil engineer <br />or electrical engineer, or I am a licensed architect. <br />I affirm that I am eligible under the provisions of Division 3 of the Business and Professions Code by Section 5537.2 or <br />6737.3 to sign this document as the person responsible for its preparation; and that I am a licensed contractor performing <br />this work. <br />❑ 1 affirm that I am eligible under the exemption to Division 3 of the Business and Professions Code to sign this document <br />because it pertains to a structure or type of work described as exempt pursuant to Business and Professions Code <br />Sections 5537, 5538 and 6737.1. <br />L4 09!4 <br />PRINCIPAL LIGHTING DESIGNER - NAME <br />SIGNA <br />DATE <br />LIC. # <br />Interface EngineeringE-013118 <br />a <br />LIGHTING MANDATORY MEASURES <br />Indicate location on plans of Note Block for Mandatory Measure 4.14 <br />LIGHTING COMPLIANCE FORMS & WORKSHEET Check box if worksheet is included <br />® LTG -1-C, Parts 1 of 4 and 2 of 4: Certificate of Compliance. Part 1 of 4 and 2 of 4 are required for all submittals <br />®LTG -1-C, Part 3 of 4: Certificate of Compliance. Part 3 of 4 submittal is required only if Control Credits are claimed <br />® LTG -1-C, Part 4 of 4: Certificate of Compliance. Part 4 of 4 submittal is required when lighting controls are installed <br />❑LTG -2-C: Indoor Lighting Schedule <br />[]LTG -3-C: Portable Lighting Worksheet <br />®LTG -4-C: Lighting Controls Credit Worksheet <br />❑LTG -5-C: Indoor Lighting Power Allowance <br />❑LTG -6-C: Tailored Method Worksheet <br />❑LTG -7-C: Room Cavity Ratio Worksheet <br />[]LTG -8-C: Common Lighting Systems Method Worksheet <br />,[]LTG -9-C: Line Voltage Track Lighting Worksheet <br />EnergyPro 4.0 by EnergySoft User Number. 4822 Job Number: Page:1 of 10 <br />LIGHTING MANDATORY MEASURES LTG -MM <br />PROJECT NAME DATE <br />Wilhelmina Lift Station 3/28/2006 <br />DESCRIPTION <br />Designer <br />Enforcement <br />131(d)1For every floor, all interior lighting systems shall be equipped with a separate automat <br />PERFORMANCE METHOD <br />COMMMON LIGHTING SYSTEM (From LTG -8-C) <br />Elec. Room <br />control to shut off the lighting. This automatic control shall meet the requirements of <br />154 <br />A. Certifies plans, specifications, installation certificates, and operating and maintenance <br />Section 119 and may be an occupancy sensor, automatic time switch, or other device <br />[MANDATORY INDOOR AND DAYLIGHTING AUTOMATIC CONTROLS <br />Test Description <br />capable of automatically shutting off the lighting. <br />❑ LTG -2-A: Lighting Control Acceptance Document <br />AND <br />- Occupancy Sensor Acceptance <br />DIAGRAM <br />E] 131(d)20verride for Building Lighting Shutoff: The automatic building shutoff system is <br />provided with a manual, accessible override switch in sight of the lights. The area of <br />- Automatic Time Switch Control Acceptance <br />w <br />override is not to exceed 5,000 square feet - <br />>� <br />❑ LTG -3-A: Automatic Daylighting Controls Acceptance Document <br />� <br />W <br />FX] 119(h) Automatic Control Devices Certified: All automatic control devices specified are <br />certified, all alternate equipment shall be certified and installed as directed by the <br />0 <br />X: <br />manufacturer, <br />cc <br />❑X 111 Fluorescent Ballast and Luminaires Certified: All fluorescent fixtures specified for the <br />project are certified and listed in the Directory. All installed fixtures shall be certified. <br />132 Tandem Wiring for One and Three Lamp Fluorescent Fixtures: All one and three lamp <br />fluorescent fixtures are tandem wired with two lamp ballasts where required by <br />1116 <br />i r/ <br />Standards Section 132; or all one and three lamp fluorescent fixtures are specified <br />1 <br />U <br />si <br />with electronic high -frequency ballasts and are exempt from tandem wiring <br />r w <br />requirements. <br />Qn <br />J <br />rW cc <br />Z <br />it <br />O <br />0 131(a) Individual Room/Area Controls: Each room and area in this building is equipped with <br />a separate switch or occupancy sensor device for each area with floor -to -ceiling <br />I <br />walls. <br />a <br />El131(b) Unfform Reduction for Individual Rooms: All rooms and areas greater than 100 <br />square feet and more than 0.8 watts per square foot of lighting load shall be <br />O <br />o <br />controlled with bilevel switching for uniform reduction of lighting within the room. <br />a <br />❑ 131(c) Daylight Area Control: All rooms with windows and skylights that are greater than <br />z <br />I�i tJ0 � <br />250 square feet and that allow for the effective use of daylight in the area shall have <br />W X <br />50% of the lamps in each daylit area controlled by a separate switch; or the effective <br />M <br />use of daylight cannot be accomplished because the windows are continuously <br />O <br />shaded by a building on the adjacent lot. Diagram of shading during different times <br />o <br />U) z <br />of the year is included on plans. <br />131(x) Display Lighting. Display lighting shall be separately switched on circuits that are <br />20 amps or less. <br />EnergyPro 4.0 by FnergySoft User Number: 4822 Job Number: Page:10 of 10 <br />CERTIFICATE OF COMPLIANCE (Part 2 of 4) <br />PROJECT NAME NAME DATE <br />Wilhelmina Lift Station 1 3/28/2006 <br />INSTALLED INDOOR LIGHTING POWER FOR CONDITIONED AND UNCONDITIONED SPACES <br />INSTALLED <br />WATTS <br />INSTALLED LIGHTING, CONDITIONED SPACES (From LTG -2-C) 118 <br />PORTABLE LIGHTING (From LTG -3-C) 0 <br />LIGHTING CONTROL CREDIT, CONDITIONED SPACES (From LTG -4-C) 24 <br />CONDITIONED SPACE ADJUSTED INSTALLED LIGHTING POWER 94 <br />INSTALLED LIGHTING, UNCONDITIONED SPACES (From LTG -2-C) 177 <br />LIGHTING CONTROL CREDIT, UNCONDITIONED SPACES (From LTG -4-C) 35 <br />UNCONDITIONED SPACE ADJUSTED INSTALLED LIGHTING POWER 142 <br />ALLOWED INDOOR LIGHTING POWER FOR CONDITIONED SPACES <br />COMPLETE BUILDING METHOD (From LTG -5-C) <br />AREA CATEGORY METHOD (From LTG-5-C)WATTS <br />TAILORED METHOD (From LTG -5-C) ALLOWED LIGHTING POWER <br />ALLOWED <br />146 <br />ALTERNATE COMPLIANCE <br />Check if <br />SPACE CONTROLLED Daylighting <br />PERFORMANCE METHOD <br />COMMMON LIGHTING SYSTEM (From LTG -8-C) <br />Elec. Room <br />ALLOWED INDOOR LIGHTING POWER FOR UNCONDITIONED SPACES From LTG -5-C) <br />154 <br />A. Certifies plans, specifications, installation certificates, and operating and maintenance <br />information meet the requirements of 10-103(b) and Title 24 Part 6. <br />[MANDATORY INDOOR AND DAYLIGHTING AUTOMATIC CONTROLS <br />Test Description <br />CONTROL LOCATIOI <br />(Room #) <br />I CONTROL <br />IDENTIFICATION <br />CONTROL TYPE <br />(Auto Time Switch, Dimming, etc.) <br />Check if <br />SPACE CONTROLLED Daylighting <br />NOTETO <br />FIELD <br />Elec. Room <br />Before an occupancy permit is granted for a newly constructed building or space, or a new lighting <br />system system serving a building or space is operated for normal use, all control devices serving the <br />building or space shall be certified as meeting the Acceptance Requirements for Code Compliance. <br />In addition a Certificate of Acceptance, LTG -1-A, Forms shall be submitted to the building departme <br />Occ Sensor - <- 250 sgfl <br />A. Certifies plans, specifications, installation certificates, and operating and maintenance <br />information meet the requirements of 10-103(b) and Title 24 Part 6. <br />a <br />Test Description <br />Test Performed By: <br />❑ LTG -2-A: Lighting Control Acceptance Document <br />AND <br />- Occupancy Sensor Acceptance <br />DIAGRAM <br />- Manual Daylight Controls Acceptance <br />- Automatic Time Switch Control Acceptance <br />w <br />Equipment requiring acceptance testing <br />>� <br />❑ LTG -3-A: Automatic Daylighting Controls Acceptance Document <br />� <br />W <br />Equipment requiring acceptance testing <br />0) <br />0 <br />X: <br />cc <br />:Y <br />4ei Z w <br />U <br />w <br />Q <br />o <br />1116 <br />i r/ <br />1 <br />U <br />si <br />a <br />r w <br />rn <br />Qn <br />J <br />rW cc <br />Z <br />it <br />I EnergyPro 4.0 by EnergySoft User Number 4822 Job Number Paget of 10 <br />go 44 %Id I8 - A& - <br />FiLE: 1tDWO - 4.14 1 EDIT: 3/79%2008 904 AM BY USINSIG I PLOT: 3/29/2006 10:00 AM BY JOHN USINSKI <br />CERTIFICATE OF COMPLIANCE (Part 3 of 4) LTG -1 - <br />PROJECT NAME DATE <br />Wilhelmina Lift Station 1 3/28/2006 <br />CONTROLS FOR CREDIT IN CONDITIONED AND UNCONDITIONED SPACES <br />CONTROL LOCATI01 <br />(Room # or Dwg. #) <br />CONTROL <br />IDENTIFICATION <br />CONTROL TYPE <br />Occupant, Daylight, Dimming, etc <br />TYPE J OF LUMINAIRES <br />D 2 <br />NOTETO <br />FIELD <br />Elec. Room <br />Before an occupancy permit is granted for a newly constructed building or space, or a new lighting <br />system system serving a building or space is operated for normal use, all control devices serving the <br />building or space shall be certified as meeting the Acceptance Requirements for Code Compliance. <br />In addition a Certificate of Acceptance, LTG -1-A, Forms shall be submitted to the building departme <br />Occ Sensor - <- 250 sgfl <br />A. Certifies plans, specifications, installation certificates, and operating and maintenance <br />information meet the requirements of 10-103(b) and Title 24 Part 6. <br />a <br />Test Description <br />Test Performed By: <br />❑ LTG -2-A: Lighting Control Acceptance Document <br />AND <br />- Occupancy Sensor Acceptance <br />DIAGRAM <br />- Manual Daylight Controls Acceptance <br />- Automatic Time Switch Control Acceptance <br />w <br />Equipment requiring acceptance testing <br />>� <br />❑ LTG -3-A: Automatic Daylighting Controls Acceptance Document <br />� <br />W <br />Equipment requiring acceptance testing <br />0) <br />0 <br />X: <br />cc <br />:Y <br />4ei Z w <br />U <br />w <br />Q <br />o <br />1116 <br />i r/ <br />1 <br />U <br />si <br />a <br />r w <br />rn <br />Qn <br />J <br />rW cc <br />Z <br />it <br />O <br />z <br />w <br />I <br />a <br />Q <br />O <br />o <br />a <br />0 <br />z <br />I�i tJ0 � <br />o <br />Z <br />W X <br />Q <br />U <br />M <br />O <br />0 0 <br />o <br />U) z <br />-,> <br />CERTIFICATE OF COMPLIANCE (Part 4 of 4) LTG -1 - <br />PROJECT NAME <br />Wilhelmina Lift Station <br />DATE <br />1 3/28/2006 <br />Designer: <br />This form is to be used by the designer and attached to the plans. Listed below are all the acceptan <br />tests for lighting systems. The designer is required to check the boxes by all acceptance tests that <br />apply and list all equipment that require an acceptance test. If all equipment of a certain type require <br />a test, list the equipment description and the number of systems to be tested in parentheses. The N <br />number designates the Section in the Appendix of the Nonresidential ACM Manual that describes th <br />test. Also indicate the person responsible for performing the tests (i.e. the installing contractor, desi <br />professional or an agent selected by the owner). Since this form will be part of the plans, completion <br />of this section will allow the responsible party to budget for the scope of work appropriately. <br />Building Departments: <br />Before an occupancy permit is granted for a newly constructed building or space, or a new lighting <br />system system serving a building or space is operated for normal use, all control devices serving the <br />building or space shall be certified as meeting the Acceptance Requirements for Code Compliance. <br />In addition a Certificate of Acceptance, LTG -1-A, Forms shall be submitted to the building departme <br />that: <br />A. Certifies plans, specifications, installation certificates, and operating and maintenance <br />information meet the requirements of 10-103(b) and Title 24 Part 6. <br />a <br />Test Description <br />Test Performed By: <br />❑ LTG -2-A: Lighting Control Acceptance Document <br />AND <br />- Occupancy Sensor Acceptance <br />DIAGRAM <br />- Manual Daylight Controls Acceptance <br />- Automatic Time Switch Control Acceptance <br />w <br />Equipment requiring acceptance testing <br />>� <br />❑ LTG -3-A: Automatic Daylighting Controls Acceptance Document <br />� <br />W <br />Equipment requiring acceptance testing <br />0) <br />0 <br />X: <br />cc <br />:Y <br />4ei Z w <br />U <br />w <br />EnergyPro 4.0 by Ener ySoft User Number. 4822 Job Number: Page4 of 10 <br />[FOR REDUCED PLANS ORIGINAL SCALE IS IN INCHES <br />Q <br />� <br />AND <br />INSTRUMENTATION <br />DIAGRAM <br />#1 <br />Z5O <br />0r3 <br />A. <br />o <br />AND <br />Z GL R <br />a <br />#2 <br />3: <br />PROCESS <br />AND <br />a <br />DIAGRAM <br />#3 <br /><3�M <br />O<1 <br />0 X W <br />w <br />Q ONi <br />>� <br />N <br />O+ <br />� <br />W <br />rn <br />0) <br />0 <br />X: <br />cc <br />:Y <br />4ei Z w <br />U <br />w <br />Q <br />o <br />1116 <br />i r/ <br />1 <br />U <br />si <br />a <br />r w <br />rn <br />Qn <br />J <br />rW cc <br />Z <br />it <br />O <br />z <br />w <br />I <br />a <br />Q <br />O <br />o <br />ELECTRICAL AND HVAC <br />DRAWING INDEX <br />4.14 ELECTRICAL AND HVAC DRAWING INDEX <br />4.15 ELECTRICAL SYMBOLS AND ABREVIATIONS <br />4.16 SINGLE LINE DIAGRAM - MOTOR CONTROL CENTER 'MCC -1' <br />4.17 'MCC -1' ELEVATION, NAMEPLATE SCHEDULE AND CALCS. <br />4.18 CONTROL WIRING DIAGRAMS #1 <br />4.19 CONTROL WIRING DIAGRAMS #2 <br />4.20 SITE PLAN - ELECTRICAL <br />4.21 ELECTRICAL BUILDING FLOOR PLAN - POWER <br />4.22 ELECTRICAL BUILDING FLOOR PLAN - LIGHTING <br />4.23 CONDUIT AND WIRE SCHEDULE <br />4.24 ELECTRICAL DETAILS #1 <br />4.25 ELECTRICAL DETAILS #2 <br />4.26 INSTRUMENTATION SYMBOLS AND ABREVIATIONS <br />4.27 <br />PROCESS <br />AND <br />INSTRUMENTATION <br />DIAGRAM <br />#1 <br />4.28 <br />PROCESS <br />AND <br />INSTRUMENTATION <br />DIAGRAM <br />#2 <br />4.29 <br />PROCESS <br />AND <br />INSTRUMENTATION <br />DIAGRAM <br />#3 <br />4.30 INST. CONTROL PANEL 'ICP' ELEVATIONS <br />4.31 INST. CONTROL PANEL 'ICP' WIRING DIAGRAM #1 <br />4.32 INST. CONTROL PANEL 'ICP' WIRING DIAGRAM #2 <br />4.33 INST. CONTROL PANEL 'ICP' WIRING DIAGRAM #3 <br />4.34 INST. DETAILS AND CONTROL SYSTEM BLOCK DIAGRAM <br />4.35 HVAC SYMBOLS AND NOTES <br />4.36 ELECTRIAL BUILDING FLOOR PLAN - HVAC <br />4.37 HVAC SCHEDULE AND DETAILS <br />Q�Of ESS/pN <br />MWICYAL UES DPRET <br />ClryOF STOWON, <br />04L[FOR NZI <br />mu N <br />1F T <br />rF OF ca��F°� cam N AMW DIRIM <br />Em ma <br />an1 <br />MW A <br />a <br />O <br />w <br />?I <br />0 <br />a. <br />2 <br />0 <br />cr <br />C <br />LCL <br />LL <br />O <br />N <br />n <br />L0 <br />N <br />0) <br />0 <br />04 <br />6, '0 <br />v <br />1 <br />1V)rn x <br />M <br />o a� <br />O <br />O <br />■■ <br />W O M <br />ZN <br /><3�M <br />O<1 <br />0 X W <br />Q <br />Q ONi <br />\ <br />N <br />O+ <br />� <br />W <br />M <br />0) <br />0 <br />X: <br />w <br />Y <br />U <br />w <br />Q <br />o <br />U <br />� <br />rn <br />Qn <br />J <br />O <br />o � <br />I <br />Q <br />O <br />o <br />a <br />0 <br />z <br />I�i tJ0 � <br />o <br />Z <br />W X <br />Q <br />U <br />M <br />O <br />0 0 <br />o <br />U) z <br />-,> <br />?I <br />0 <br />a. <br />2 <br />0 <br />cr <br />C <br />LCL <br />LL <br />O <br />V� <br />U <br />J X <br />O <br />O� <br />I <br />r0 <br />VJ z <br />a: <br />Z � <br />W <br />� U <br />W Q <br />J <br />W = <br />Q <br />Zz <br />W Q <br />Q <br />Z Q <br />� U <br />W � <br />= U <br />J W <br />Ld <br />i <br />T- U- <br />0 <br />1 <br />D <br />Q <br />J <br />a <br />UL <br />O <br />W <br />N <br />n <br />I <br />rn <br />N <br />0) <br />0 <br />04 <br />6, '0 <br />v <br />1 <br />1V)rn x <br />o a� <br />O <br />O <br />Q <br />■■ <br />W O M <br />ZN <br /><3�M <br />O<1 <br />0 X W <br />Q ONi <br />O N� <br />N <br />O+ <br />� <br />W <br />M <br />Z <br />O <br />X: <br />V� <br />U <br />J X <br />O <br />O� <br />I <br />r0 <br />VJ z <br />a: <br />Z � <br />W <br />� U <br />W Q <br />J <br />W = <br />Q <br />Zz <br />W Q <br />Q <br />Z Q <br />� U <br />W � <br />= U <br />J W <br />Ld <br />i <br />T- U- <br />0 <br />1 <br />D <br />Q <br />J <br />a <br />UL <br />O <br />W <br />