My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU4054-SU4068
PublicWorks
>
VAULT MAPS
>
Subdivision - SU
>
SU4000 -
>
SU4054-SU4068
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/20/2024 12:05:48 PM
Creation date
11/20/2024 11:56:03 AM
Metadata
Fields
Template:
Subdivision - SU
Subdivision
Improvement Plans for Stonegate Estates
Sheet #
15
Classification
Record Drawings
Supplemental fields
Cross Ref
SU4054 - SU4068
Date
1/3/2006
Document Relationships
Stonegate Estates
(Message)
Path:
\VAULT MAPS\*CARD CATALOG*\ST - SZ
SU-4054
(Message)
Path:
\VAULT MAPS\Subdivision - SU (GIS FILES)\SU-3961-4095
SU-4055
(Message)
Path:
\VAULT MAPS\Subdivision - SU (GIS FILES)\SU-3961-4095
SU-4056
(Message)
Path:
\VAULT MAPS\Subdivision - SU (GIS FILES)\SU-3961-4095
SU-4057
(Message)
Path:
\VAULT MAPS\Subdivision - SU (GIS FILES)\SU-3961-4095
SU-4058
(Message)
Path:
\VAULT MAPS\Subdivision - SU (GIS FILES)\SU-3961-4095
SU-4059
(Message)
Path:
\VAULT MAPS\Subdivision - SU (GIS FILES)\SU-3961-4095
SU-4060
(Message)
Path:
\VAULT MAPS\Subdivision - SU (GIS FILES)\SU-3961-4095
SU-4061
(Message)
Path:
\VAULT MAPS\Subdivision - SU (GIS FILES)\SU-3961-4095
SU-4062
(Message)
Path:
\VAULT MAPS\Subdivision - SU (GIS FILES)\SU-3961-4095
SU-4063
(Message)
Path:
\VAULT MAPS\Subdivision - SU (GIS FILES)\SU-3961-4095
SU-4064
(Message)
Path:
\VAULT MAPS\Subdivision - SU (GIS FILES)\SU-3961-4095
SU-4065
(Message)
Path:
\VAULT MAPS\Subdivision - SU (GIS FILES)\SU-3961-4095
SU-4066
(Message)
Path:
\VAULT MAPS\Subdivision - SU (GIS FILES)\SU-3961-4095
SU-4067
(Message)
Path:
\VAULT MAPS\Subdivision - SU (GIS FILES)\SU-3961-4095
SU-4068
(Message)
Path:
\VAULT MAPS\Subdivision - SU (GIS FILES)\SU-3961-4095
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
b31t <br />.0 <br />00 <br />0" �G <br />0 <br />Az <br />too <br />'00 t <br />."10 <br />00 <br />A� <br />0 10 h0 40 <br />110 lob 1 <br />p ##41,A <br />�o. <br />LOT -f <br />=woo yj <br />LOT 6 <br />-- LOT a <br />GENERAL: <br />I. A 00145TRUCTION ENTRANCE SHALL Be IN5TA W PRIOR TO COMMENCEMENT OF ORADIN6. LOCATION or- <br />THE <br />FTHE ENTRANCE MAY BE ADJUSTED BY THE CONTRACTOR TO FACILITATE 6RA17INS OPERATIONS. ALL <br />CONSTRUCTION TRAFFIC, ENTERING THE PAVED ROAD MUST CROSS THE CONSTRUCTION ENTRANCE. <br />2. CHANGES TO THIS EROSION AND SEDIMENT CONTROL PLAN TO MEET FIELD CONDITIONS SHALL BE MADE <br />ONLY WITH THE APPROVAL OF, OR AT THE DIRECTION OF THE COUNTY ENGINEER. DURINS THE RAINY SEASON, <br />PUBLIC, ROADWAY SHALL BE KEPT CLEAR OF EARTH MATERIAL AND DWK115. <br />THE SITE SHALL BE MAINTAINED 50 THAT A MINIMUM OF SEDIMENT LADEN RUNOFF ENTERS THE STORM <br />DRAINA6E SYSTEM AND PUBLIC, ROADWAY. THIS PLAN COVERS ONLY THE FIRST WINTER FOLL0Y+IIN6 <br />6RADIN6. PLANS SHALL BE RESUEWIITTED FOR APPROVAL PRIOR TO SEPTEMBER IST OF EACH <br />SUBSEQUENT YEAR UNTIL THE PROPOSED IMPROVEMENTS ARE COMPLETED. <br />3. CONTROL MEASURES SHALL BE INSPECTED AND REPAIRED AT THE END OF EACH WORKING DAY <br />y AND, IN ADDITION, AFTER EACH STORM. <br />4. A NOTICE OF INTENT (Noll) SHALL Be FILED WITH THE REGIONAL WATER QUALITY CONTROL BOARD <br />9f" PER THE NATIONAL POLLUTANT AND 015CHAR6E ELIMINATION SYSTEM (WOES) PERMIT.. <br />00 .. _ INSTALL FIBER ROLL <br />00 AND/OR SILT FENCE 2 <br />INSTALL CONSTRUCTION 4 <br />ENTRANCE PROTECTION <br />CONTRACTOR TO STABILIZE THROUGH HYDROSEEDING <br />DISTURBED SOIL PRIOR TO RAINY SEASON <br />QoFESSip <br />Q � <br />�Q�4 (0Al. o��z <br />� i <br />N O. 62� rn <br />� Exp. � <br />.OF Cn1Y1F <br />U <br />z <br />......... . �� <br />101111 .0 � ♦ ! ��. �Ta ou T cn E <br />INSTALL EQUIPMENT REFUEL AND SERVICE AREA IN N U <br />kip <br />`� -- ,1 LOCATIONS APPROVED BY A CERTIFIED PROFESSIONAL(D <br />w o <br />IN EROSION & SEDIMENT CONTROLIU U <br />Q cn Q <br />o <br />W c <br />91 <br />STORM AAT ER POLLUTION PREVENTION PLAN .0 <br />WITH THE EXCEPTION OF PROPERLY PH BALANCED DESILTED WATER FROM SITE <br />DEWATERIN* THE CONTRACTOR SHALL NOT DISCHARGE ANY MATERIALS AND/OR <br />LIQUIDS TO THE STORM DRAINAGE SYSTEM. ACTIVITIES OF PARTICULAR <br />CONCERN ARES <br />A. ALL .EQUIPMENT REFUELINro IN THE PROJECT AREA SHALL Be CAREFULLY DONE TO <br />AVOID SPILLA&E. ANY SPILLS SHALL BE CONTAINED AND GLEANED UP IMMEDIATELY <br />IN ACCORDANCE WITH STATE AND LOCAL REQUIREMENTS. ALL FUELING VEHICLES <br />SHALL BE EQUIPPED WITH SPILL CLEANUP MATERIALS AND EQUIPMENT. <br />B. CONTRACTOR SHALL CONTROL AND PROPERLY DISPOSE 012 ALL LIQUIDS, <br />G. A SEPARATE 5WPPP MUST BE KEPT ON-SITE DURING CONSTRUCTION. <br />D. SEE mrimrcb ca,goy/stormwater/con truc-t[on.html FOR 5WPPP STANDARDS <br />o <br />U -J MO <br />tu <br />' r <br />LOT 5 LOT 11 O 5 m <br />k LOT o0 <br />c LU <br />5> <br />y --- ...... may,. _ <br />Q o <br />e <br />� INV. 51.44 <br />I 30 R�'.U.E. �,� ♦ j <br />ER05�ION CONNOTES;I LOT k 2 � <br />TROLL o <br />I. ALL EROSION CONTROL MEASURES SHALL BE CONSTRUCTED PER THE STANDARD <br />CONSTRUCTION SPECIFICATION$ DATED OCTOBER igdl"f AND THE EROSION AND <br />SEDIMENT CONTROL STANDARDS AND SPEGIFICATION5, LATEST REVISION. ' <br />WHERE DISCREPANCIES EX15T THE STANDARD ORAWIN65 OF THE EROSION I LOT ! ♦ Z <br />AND SEDIMENT CONTROL STANDARDS AND SPECIFICATIONS SHALL SUEDE <br />THE STANDARD DRAWIN65 OF THE STANDARD CONSTRJJCTION SPECIFICATIONS. Iip ��' .Q_J <br />I 0 M— W CL <br />2. ALL EROSION CONTROL MEASURES SHALL BE MAINTAINED DURING IW W 0 <br />CON5TRJCTION BY THE CONTRACTOR PER THE EROSION AND SEDIMENT CONTROL i y � � __ LU (� <br />STANDARDS AND SPECIFICATIONS, LATEST REVISION. ) <br />Q <br />S. DUST CONTROL SHALL BE PRACTICED PER THE 6RADIN6 ORDINANCE AND I 6EMSTON �� ` y' W <br />STANDARD CONSTRUCTION SPECIFICATIONS, LATEST REVISION.,�o �" �"�� '� °° ¢�q�> W <br />-�W-- <br />4. STABILIZED CONSTRUCTION SITE ACCESS SHALL BE CONSTRUCTED PER I "� Cj,a� - a <br />ATTACHED DETAIL WHERE CONSTRUCTION TRAFFIC, ENTERS OR LEAVES I M`'' 77 <br />PAVED AREAS. THE STABILIZED ACCESS 5HAL _ REMAIN IN PLACE ON A YEAR I , �1q V) <br />ROUND BASIS UNTIL COMPLETION OF CONSTRUCTION. I LO.i. <br />S. SENSITIVE AREAS AND AREAS UNDISTURBED BY GRADING SHALL SE PROTECTED Q LOT 14 <br />BY FILTER ROLL BARRIER AS SHOWN ON THE ROUGH 6RADIN6 PLAN AND <br />CONSTRUCTED PER ATTACHED DETAILS. FILTER ROLL BARRIER, OR APPROVED EQUAL, I 25 25 rn <br />SHALL REMAIN 1N PLACE ON A YEAR ROUND BASIS. I� s �¢, <br />6. FILTER ROLL, STRAW WATTLE BARRIER OR OTHER EROSION CONTROL MEASURES I <br />BE CONSTRUCTED PER ATTACHED DETAILS, TO PROVIDE PROTECTION AT THE I z' <br />PERIMETER OF THE PROJECT WHERE SHEET FLOA TYPE RUNOFF MAY 0I50HAROE LOT 17 <br />TO ADJACENT PROPERTIES. STRAW ROLL, OR APPROVED EQUAL, SHALL REMAIN IN I a� ,, LOT I <br />Z �� Z grt Design <br />PLACE ON A YEAR ROUND SA515, I EQUIPMENT REFUEL 0 w0 AMC <br />[ AND SERVICE AREA <br />F-- p_- <br />Check <br />-a. ALL SLOPES STEEPER THAN IOj I SHALL BE HYDR05EEDED WITH AN LOT I ¢ ¢ - <br />APPROVED SEED MIXTURE AFTER COMPLETION AND PRIOR TO THE RAINY � x AMC <br />�� � ti \ � <br />SEA50N TO ALLOW MAXIMUM GROWTH OF HYDROSEEDED AREA. ( z - I— �I-- LST rJ. <br />Z Date <br />I O w p w 04/04/05 <br />I U U <br />Scale <br />— — — � � �--_....—_.,.—...��....�,—_—......A....,.,..,.,..,..—... ���' � Original Drawing Scale <br />fil <br />p -lip <br />00- <br />" �b0005o i�'aAli w Sheet Number <br />o <br />�4 of 15 <br />Project File No. <br />031031RG2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.