My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
M571 - M589
PublicWorks
>
VAULT MAPS
>
Large Plans - LP
>
Drawer M
>
M558 - M
>
M571 - M589
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/2/2024 1:02:35 PM
Creation date
11/27/2024 3:49:09 PM
Metadata
Fields
Template:
Large Plans - LP
Project
Improvement Plans for MacArthur Drive
Limits
Tracy Material Recovery and Transfer Station Expansion
Year
2013
Project Engineer
Alex Chetley
Roads Worked
MacArthur Drive
Red Lines
No
Supplemental fields
Classification
Improvement Plans
Cross Ref
M571 - M589
Type
Improvement Plan
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
LOCATION MAP <br />41 <br />tau cos W <br />Bola" � � � NU <br />Vxx <br />Z7 <br />UNS 2 Ro. , <br />r2��.� <br />5fa°' <br />... I S ., , z - E a' 11 1 - - <br />mrw z <br />3 3 . <br />$Cki4N.Tf." gp <br />a <br />s <br />jaw <br />MacARTHUR DRIVE <br />TRACY MATERIAL RECOVERY AND TRANSFER STATION EXPANSION <br />s <br />Al <br />,gym <br />�7 <br />6I <br />�i ��• ''��P �+IhS'r j'Jl� <br />d <br />a., ±4iXacYxSk <br />� <br />t <br />3 <br />1 r 1 I 2 <br />CURB <br />afi <br />PROJECT <br />SITE <br />BEFORE EXCAVATING <br />CALL U.S.A. <br />(UNDERGROUND SERVICE ALERT <br />800-227-2600 <br />TOLL FREE <br />2 WORKING DAYSBEFORE ALL <br />PLANNED WORK OPERATION <br />0 <br />2S <br />14 <br />ien Joaquin Cary <br />t <br />a <br />� - <br />N.T_S. <br />3070,1, SOUTH MacARTHUR DRIVE <br />TRACY, CALIFORNIA 95377 <br />SEPTEMBER 4, 2012 <br />SITE MAP <br />APN 253-130-26 - APN 253-130-19 I 1 <br />1 <br />I <br />I <br />I <br />SHEET INDEX <br />C-1 <br />TITLE SHEET <br />C-2 <br />NOTES, LEGEND, AND ABBREVIATIONS <br />C-3 <br />TYPICAL SECTIONS <br />C-4 <br />MISCELLANEOUS DETAILS <br />C-5 <br />MISCELLANEOUS DETAILS <br />C-6 <br />PROJECT CONTROL <br />C-7 <br />DEMOLITION PLAN <br />C-8 <br />PLAN & PROFILE - STA 27+00 TO STA 32+00 <br />C-9 <br />PLAN & PROFILE - STA 32+00 TO STA 37+00 <br />C-10 <br />PLAN & PROFILE - STA 37+00 TO STA 42+00 <br />C-11 <br />PLAN & PROFILE - STA 42+00 TO STA 47+00 <br />C-12 <br />PLAN & PROFILE - STA 47+00 TO STA 52+00 <br />C-13 <br />CROSS SECTIONS <br />C-14 <br />CROSS SECTIONS <br />C-15 <br />SIGNING & STRIPING PLAN <br />C-16 <br />EROSION CONTROL PLAN <br />C-17 <br />STANDARD PLANS <br />C-18 <br />STANDARD PLANS <br />C-19 <br />STAGE CONSTRUCTION <br />BENCHMARK <br />VERTICAL DATUM IS NGVD 1929. <br />HORIZONTAL DATUM IS CALIFORNIA STATE PLANE COORDINATE SYSTEM NAD 83 ZONE 3. <br />VERTICAL POSITION WAS HELD SJCO BENCHMARK "BB-43.3' WHICH IS A BRAS DISK SET ON THE NW <br />CORNER OF THE BRIDGE (SHOWN ON THIS MAP AS POINT# 947). <br />HORIZONTAL POSITION WAS ESTABLISHED WITH GPS EQUIPMENT UTILIZING OPUS REDUCTION (EPOCH: 2002), <br />PROCESSED ON FEBRUARY 17, 2012. <br />BASIS OF BEARING <br />THE BASIS OF BEARING IS THE SECTION LINE BETWEEN SECTION 15 AND SECTION 16 13S., R.5E., M.D.B. <br />& M., WHICH BEARS NORTH AS SHOWN ON P.M. 19-110A. BOTH CORNERS ARE SHOWN ON THIS MAP. <br />COUNTY OF SAN JOAQUIN <br />DEPARTMENT OF PUBLIC WORKS <br />APPROVED AS "ENCROACHMENT PERMIT PLAN SET" <br />APPROVED FOR WORK WL110 COUNTY RIGHT-OF-WAY ONLY <br />APPROVED: <br />RCENO: (: D yVI !§�, <br />ENCROACHMENT DATE <br />PERMIT NO: PS— 120 197G ISSUED: <br />BY: <br />ENGINEERING <br />US Sow= Avmue <br />suite C <br />Santa Roes Ca 9S404 <br />T& (707) 544W" <br />Fay (707) 544-W66 <br />Q Copyright 2012 <br />��o QROFESS/pNq� <br />No. 30888 <br />EXP. 3-31-14 <br />\F OF CAS-0 <br />Z <br />W <br />LU <br />> <br />G <br />W <br />> <br />Q <br />O� <br />n <br />Lu <br />W <br />>_ati <br />W <br />Ce, <br />Lo <br />n r <br />V, <br />Q <br />W <br />�ov <br />J <br />� <br />Q <br />o <br />Q <br />Q <br />L.L.. <br />Submittal / Revision: <br />0 <br />-- <br />0 <br />0 <br />ZL <br />ZL <br />Job No: 06-1262 <br />Drawn By: SGH <br />Checked By: DS <br />Date: 2012-09-04 <br />Sheet Number <br />C. <br />1 of 19 <br />11113162\2012 -MacArthur Drive Improvements\Civil\C1 - CS.dwg, C-1, 9'2712012 2:48:41 PM <br />
The URL can be used to link to this page
Your browser does not support the video tag.