Laserfiche WebLink
LOCATION MAP <br />41 <br />tau cos W <br />Bola" � � � NU <br />Vxx <br />Z7 <br />UNS 2 Ro. , <br />r2��.� <br />5fa°' <br />... I S ., , z - E a' 11 1 - - <br />mrw z <br />3 3 . <br />$Cki4N.Tf." gp <br />a <br />s <br />jaw <br />MacARTHUR DRIVE <br />TRACY MATERIAL RECOVERY AND TRANSFER STATION EXPANSION <br />s <br />Al <br />,gym <br />�7 <br />6I <br />�i ��• ''��P �+IhS'r j'Jl� <br />d <br />a., ±4iXacYxSk <br />� <br />t <br />3 <br />1 r 1 I 2 <br />CURB <br />afi <br />PROJECT <br />SITE <br />BEFORE EXCAVATING <br />CALL U.S.A. <br />(UNDERGROUND SERVICE ALERT <br />800-227-2600 <br />TOLL FREE <br />2 WORKING DAYSBEFORE ALL <br />PLANNED WORK OPERATION <br />0 <br />2S <br />14 <br />ien Joaquin Cary <br />t <br />a <br />� - <br />N.T_S. <br />3070,1, SOUTH MacARTHUR DRIVE <br />TRACY, CALIFORNIA 95377 <br />SEPTEMBER 4, 2012 <br />SITE MAP <br />APN 253-130-26 - APN 253-130-19 I 1 <br />1 <br />I <br />I <br />I <br />SHEET INDEX <br />C-1 <br />TITLE SHEET <br />C-2 <br />NOTES, LEGEND, AND ABBREVIATIONS <br />C-3 <br />TYPICAL SECTIONS <br />C-4 <br />MISCELLANEOUS DETAILS <br />C-5 <br />MISCELLANEOUS DETAILS <br />C-6 <br />PROJECT CONTROL <br />C-7 <br />DEMOLITION PLAN <br />C-8 <br />PLAN & PROFILE - STA 27+00 TO STA 32+00 <br />C-9 <br />PLAN & PROFILE - STA 32+00 TO STA 37+00 <br />C-10 <br />PLAN & PROFILE - STA 37+00 TO STA 42+00 <br />C-11 <br />PLAN & PROFILE - STA 42+00 TO STA 47+00 <br />C-12 <br />PLAN & PROFILE - STA 47+00 TO STA 52+00 <br />C-13 <br />CROSS SECTIONS <br />C-14 <br />CROSS SECTIONS <br />C-15 <br />SIGNING & STRIPING PLAN <br />C-16 <br />EROSION CONTROL PLAN <br />C-17 <br />STANDARD PLANS <br />C-18 <br />STANDARD PLANS <br />C-19 <br />STAGE CONSTRUCTION <br />BENCHMARK <br />VERTICAL DATUM IS NGVD 1929. <br />HORIZONTAL DATUM IS CALIFORNIA STATE PLANE COORDINATE SYSTEM NAD 83 ZONE 3. <br />VERTICAL POSITION WAS HELD SJCO BENCHMARK "BB-43.3' WHICH IS A BRAS DISK SET ON THE NW <br />CORNER OF THE BRIDGE (SHOWN ON THIS MAP AS POINT# 947). <br />HORIZONTAL POSITION WAS ESTABLISHED WITH GPS EQUIPMENT UTILIZING OPUS REDUCTION (EPOCH: 2002), <br />PROCESSED ON FEBRUARY 17, 2012. <br />BASIS OF BEARING <br />THE BASIS OF BEARING IS THE SECTION LINE BETWEEN SECTION 15 AND SECTION 16 13S., R.5E., M.D.B. <br />& M., WHICH BEARS NORTH AS SHOWN ON P.M. 19-110A. BOTH CORNERS ARE SHOWN ON THIS MAP. <br />COUNTY OF SAN JOAQUIN <br />DEPARTMENT OF PUBLIC WORKS <br />APPROVED AS "ENCROACHMENT PERMIT PLAN SET" <br />APPROVED FOR WORK WL110 COUNTY RIGHT-OF-WAY ONLY <br />APPROVED: <br />RCENO: (: D yVI !§�, <br />ENCROACHMENT DATE <br />PERMIT NO: PS— 120 197G ISSUED: <br />BY: <br />ENGINEERING <br />US Sow= Avmue <br />suite C <br />Santa Roes Ca 9S404 <br />T& (707) 544W" <br />Fay (707) 544-W66 <br />Q Copyright 2012 <br />��o QROFESS/pNq� <br />No. 30888 <br />EXP. 3-31-14 <br />\F OF CAS-0 <br />Z <br />W <br />LU <br />> <br />G <br />W <br />> <br />Q <br />O� <br />n <br />Lu <br />W <br />>_ati <br />W <br />Ce, <br />Lo <br />n r <br />V, <br />Q <br />W <br />�ov <br />J <br />� <br />Q <br />o <br />Q <br />Q <br />L.L.. <br />Submittal / Revision: <br />0 <br />-- <br />0 <br />0 <br />ZL <br />ZL <br />Job No: 06-1262 <br />Drawn By: SGH <br />Checked By: DS <br />Date: 2012-09-04 <br />Sheet Number <br />C. <br />1 of 19 <br />11113162\2012 -MacArthur Drive Improvements\Civil\C1 - CS.dwg, C-1, 9'2712012 2:48:41 PM <br />