GENERAL NOTES <br />1. ALL NEW IMPROVEMENTS SHALL BE IN ACCORDANCE WITH THE REQUIREMENTS OF THESE PLANS AND <br />SPECIFICATIONS, THE CURRENT CALIFORNIA MUTCD, THE LATEST EDITION OF THE SAN JOAQUIN <br />COUNTY IMPROVEMENT STANDARDS AND THE 2006 STATE OF CALIFORNIA DEPARTMENT OF <br />TRANSPORTATION STANDARD PLANS AND SPECIFICATIONS, <br />2 PRIOR TO ANY WORK BEING PERFORMED, THE CONTRACTOR SHALL CONTACT THE APPROPRIATE <br />REGULATORY AGENCIES FOR A PRE -CONSTRUCTION CONFERENCE. CONTRACTOR SHALL ALSO <br />NOTIFY THE BELOW LISTED PROJECT CONTACTS (72) HOURS IN ADVANCE OF SAID MEETING: <br />SAN JOAQUIN COUNTY PUBLIC WORKS DEPARTMENT <br />1810 E. HAZE LTON AVE <br />STOCKTON, CA 95201 <br />(209) 468-3014 <br />(209) 468-2999 (FAX) <br />NAJEE ZARIF <br />3 THE INTENT IS THAT THESE PLANS REQUIRE ALL LABOR AND MATERIALS (EXCEPT AS SPECIFIED IN <br />THE SPECIFICATIONS) NECESSARY AND PROPER FOR THE WORK CONTEMPLATED AND THAT THE <br />WORK BE COMPLETED IN ACCORDANCE WITH THEIR TRUE INTENT AND PURPOSE. THE CONTRACTOR <br />SHALL NOTIFY THE PROJECT OWNER IMMEDIATELY REGARDING ANY DISCREPANCIES AND <br />AMBIGUITIES WHICH MAY EXIST IN THE PLANS OR SPECIFICATIONS. <br />4. THE CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFYING THE PHYSICAL LOCATION OF ALL <br />EXISTING UNDERGROUND UTILITIES BY POTHOLING PRIOR TO CONSTRUCTION AND SHALL CONTACT <br />THE RESPECTIVE UTILITY COMPANIES PRIOR TO THE COMMENCEMENT OF WORK. CONTRACTOR <br />SHALL BE RESPONSIBLE FOR THE LOCATION AND PRESERVATION OF ALL SUCH FACILITIES IN THE <br />AREA OF CONSTRUCTION AND SHALL NOTIFY UTILITY COMPANIES FORTY-EIGHT (48) HOURS IN <br />ADVANCE OF ANY CONSTRUCTION (UNDERGROUND SERVICE ALERT 1-800-227-2600). <br />5. THE CONTRACTOR'S ATTENTION IS DIRECTED TO SECTION 1540 (A)(1) OF THE CONSTRUCTION SAFETY <br />ORDERS (TITLE 8 CALIFORNIA ADMINISTRATION CODE SECTION 1540), ISSUED BY THE OCCUPATIONAL <br />SAFETY AND HEALTH STANDARDS BOARD PURSUANT TO THE CALIFORNIA OCCUPATIONAL SAFETY <br />AND HEALTH ACT OF 1973, AS AMENDED, WHICH STATES PRIOR TO OPENING AN EXCAVATION, <br />EFFORT SHALL BE MADE TO DETERMINE WHETHER UNDERGROUND INSTALLATION: I.E., SEWER, <br />WATER, FUEL, ELECTRIC LINES, ETC., WILL BE ENCOUNTERED AND, IF SO, WHERE SUCH <br />UNDERGROUND INSTALLATIONS ARE LOCATED. WHEN THE EXCAVATION APPROACHES THE <br />APPROXIMATE LOCATION OF SUCH INSTALLATION, THE EXACT LOCATION SHALL BE DETERMINED BY <br />CAREFUL PROBING AND/OR DIGGING, AND WHEN IT IS UNCOVERED. ADEQUATE PROTECTION SHALL <br />BE PROVIDED FOR THE EXISTING INSTALLATION ALL KNOWN OWNERS OF UNDERGROUND FACILITIES <br />IN THE AREA CONCERNED SHALL BE ADVISED OF PROPOSED WORK AT LEAST 48 HOURS PRIOR TO <br />THE START OF ACTUAL EXCAVATION. <br />6. THE CONTRACTOR SHALL PROVIDE SHORING, BRACING. SLOPING, OR PROVISIONS TO PROTECT <br />WORKERS FOR ALL AREAS TO BE EXCAVATED TO A DEPTH OF 5 FEET OR MORE. SAID PROTECTION TO <br />BE DONE IN ACCORDANCE WITH THE REQUIREMENTS OF LOCAL, STATE, AND FEDERAL REGULATIONS. <br />7. DURING CONSTRUCTION THE CONTRACTOR SHALL MAINTAIN THE INTEGRITY OF EXISTING FACILITIES. <br />8 CONTRACTOR SHALL BE RESPONSIBLE FOR ALL PERMITS AND LICENSES REQUIRED FOR THE <br />CONSTRUCTION AND COMPLETION OF THE PROJECT. <br />9 ALL WORK IN THE PUBLIC RIGHT-OF-WAY IS SUBJECT TO THE APPROVAL AND ACCEPTANCE OF SAN <br />JOAQUIN COUNTY PUBLIC WORKS DEPARTMENT. <br />10. CONTRACTOR SHALL COORDINATE THE REMOVAL AND/OR RELOCATION OF ALL EXISTING UTILITIES IF <br />NEEDED WITH RESPECTIVE UTILITY COMPANIES. <br />11. THE CONTRACTOR SHALL ADJUST TO GRADE ALL FACILITIES (INCLUDING, BUT NOT LIMITED TO VALVE <br />BOXES.. PULL BOXES, MAINTENANCE HOLE RIM AND COVERS, METER BOXES) WITHIN THE LIMITS OF <br />WORK AND/OR AS DIRECTED BY THE ENGINEER. THE FACILITIES SHALL BE ADJUSTED AS SET FORTH IN <br />SJCO STANDARD DRAWING NO. CW-R36 AND/OR AS DIRECTED BY ENGINEER, <br />12 THE CONTRACTOR SHALL PROVIDE A TRAFFIC CONTROL PLAN (TCP), INCLUDING ALL LIGHTS, <br />BARRICADES, SIGNS, FLAGMEN OR OTHER DEVICES NECESSARY FOR PUBLIC SAFETY. THE TCP SHALL <br />BE SUBMITTED TO AND DEEMED ACCEPTABLE BY THE COUNTY PRIOR TO START OF WORK. <br />13. ALL STATIONS REFER TO DISTANCES ALONG STREET CENTERLINE. PERPENDICULAR TO OR RADIALLY <br />OPPOSITE CENTERLINE STATIONS, UNLESS OTHERWISE NOTED. <br />14. CONTRACTOR SHALL DEMOLISH, EXCAVATE, REMOVE AND DISPOSE OF ANY EXISTING CONCRETE OR <br />ASPHALT CONCRETE PAVING, CONCRETE CURB, GUTTER AND SIDEWALK AND DELETERIOUS <br />MATERIAL AS REQUIRED TO CONSTRUCT THE CONTRACT WORK. ALL EXCESS MATERIAL GENERATED <br />BY DEMOLITION, EXCAVATION.. AND GRADING SHALL BECOME THE PROPERTY OF THE CONTRACTOR <br />AND DISPOSED OF AT THEIR OWN EXPENSE. <br />15. CONTRACTOR AGREES THAT HE SHALL ASSUME SOLE AND COMPLETE RESPONSIBILITY FOR JOBSITE <br />CONDITIONS DURING THE COURSES OF CONSTRUCTION OF THIS PROJECT, INCLUDING SAFETY OF ALL <br />PERSONS AND PROPERTY, THAT THIS REQUIREMENT SHALL APPLY CONTINUOUSLY AND NOT BE <br />LIMITED TO WORKING HOURS, <br />U S, AND THAT THE CONTRACTOR SHALL DEFEND, INDEMNIFY AND HOLD <br />THE COUNTY, OWNER, AND ENGINEER HARMLESS FROM ANY AND ALL LIABILITY, REAL OR ALLEGED.. IN <br />CONNECTION WITH THE PERFORMANCE OR WORK ON THIS PROJECT, EXCEPTING FOR THE LIABILITY <br />FROM THE SOLE NEGLIGENCE OF THE COUNTY OR ENGINEER <br />16. THE CONTRACTOR SHALL PROVIDE PUBLIC SAFETY AND TRAFFIC CONTROL IN ACCORDANCE WITH <br />THE COUNTY OF SAN JOAQUIN REQUIREMENTS. SAFE VEHICULAR AND PEDESTRIAN ACCESS SHALL <br />BE PROVIDED AT ALL TIMES DURING CONSTRUCTION. <br />17 A REGISTERED CIVIL ENGINEER OR LICENSED LAND SURVEYOR SHALL DO ALL FIELD STAKING AT THE <br />EXPENSE OF THE CONTRACTOR. <br />18 ALL DISCREPANCIES DISCOVERED BY THE CONTRACTOR IN THESE PLANS AND/OR ANY FIELD <br />CONDITIONS DISCOVERED BY THE CONTRACTOR THAT MAY DELAY OR OBSTRUCT THE PROPER <br />COMPLETION OF THE WORK PER THESE PLANS SHALL BE BROUGHT TO THE ATTENTION OF THE <br />PROJECT OWNER IMMEDIATELY UPON DISCOVERY. SAID NOTIFICATION SHALL BE IN WRITING. <br />19 CONTRACTOR IS RESPONSIBLE FOR THE PROTECTION OF ALL EXISTING MONUMENTS AND OTHER <br />SURVEY MARKERS. MONUMENTS AND SURVEY MARKERS DESTROYED DURING CONSTRUCTION SHALL <br />BE REPLACED AT THE CONTRACTOR'S EXPENSE. <br />20 THE CONTRACTOR SHALL OBTAIN AN ENCROACHMENT PERMIT FROM THE COUNTY OF SAN JOAQUIN <br />FOR ANY WORK WITHIN THE PUBLIC RIGHT OF WAY PRIOR TO CONSTRUCTION. <br />21. CONTRACTOR SHALL INDEPENDENTLY REVIEW GROUND, TOPOGRAPHY. AND EXISTING CONDITIONS <br />THROUGHOUT THE LIMITS OF WORK, AND ASSUME WHOLLY AND UNCONDITIONALLY THE RISK OF <br />COMPLETING THE WORK SET OUT ON THESE PLANS, REGARDLESS OF ROCK, WATER TABLE, OR <br />OTHER CONDITIONS WHICH THE CONTRACTOR MAY ENCOUNTER IN THE COURSE OF THE WORK. <br />22 THE CONTRACTOR SHALL CHECK AND VERIFY ALL DIMENSIONS AND EXISTING CONDITIONS BEFORE <br />LAYING OUT THE WORK AND NOTIFY THE PROJECT OWNER OF ANY DISCREPANCIES BEFORE <br />STARTING WORK. HE SHALL BE RESPONSIBLE FOR ANY ERRORS RESULTING FROM HIS FAILURE TO <br />DO SO. <br />23. DIMENSIONS TAKE PRECEDENCE OVER SCALE, DO NOT SCALE DRAWINGS. ALL DIMENSIONS ARE TO <br />FACE OF CONCRETE, FACE OF CURB, UNLESS OTHERWISE NOTED. <br />PAVING NOTES <br />1 ALL ASPHALT CONCRETE SURFACES SHALL BE SAW CUT TO A NEAT, STRAIGHT LINE AND REMOVED <br />THE EXPOSED EDGE SHALL BE SEALED WITH EMULSION PRIOR TO PAVING. THE EXPOSED BASE <br />MATERIAL SHALL BE GRADED, RECOMPACTED AND RESEALED PRIOR TO PAVING. <br />2. AFTER STRIPPING THE DEBRIS, ANY EXISTING LOOSE FILL, UNSUITABLE SOIL, SILTY SAND DEPOSITS, <br />OR DISTURBED SOILS SHALL BE EXCAVATED AND PROPERLY DISPOSED OF TO THE SATISFACTION OF <br />THE GEOTECHNICAL ENGINEER. <br />3 ASPHALT CONCRETE SHALL BE TYPE A, 3/4" MAXIMUM MEDIUM GRADING CONFORMING TO THE <br />PROVISIONS OF SECTION 39 OF THE STANDARD SPECIFICATIONS THE GRADE OF THE ASPHALT <br />BINDER TO BE MIXED WITH AGGREGATE SHALL BE GRADE PG 64-10 CONFORMING TO THE PROVISIONS <br />IN SECTION 92 OF THE STANDARD SPECIFICATIONS. <br />4. THE AGGREGATE BASE SHALL BE CLASS 2, 3/4" MAXIMUM GRADING FOR THE UPPER SIX INCHES. THE <br />DEPTH BELOW SIX INCHES MAY BE CLASS 2, 1-1/2" MAXIMUM GRADING. AGGREGATE BASE SHALL <br />CONFORM TO THE PROVISIONS OF SECTION 26 OF THE STANDARD SPECIFICATIONS. <br />5. THE SUBGRADE AND AGGREGATE BASE SHALL BE COMPACTED TO A RELATIVE COMPACTION OF 90% <br />AND 95%, RESPECTIVELY. <br />6 A MINIMUM OF ONE LANE (10') SHALL BE OPEN TO TRAFFIC AT ALL TIMES. FLAGGING SHALL BE PART <br />OF THE TRAFFIC CONTROL PLAN. <br />GRADING NOTES <br />1. ALL EARTHWORK AND SITE GRADING SHALL BE IN ACCORDANCE WITH THE RECOMMENDATIONS <br />CONTAINED IN THE GEOTECHNICAL SERVICES REPORT, TITLED PROPOSED ROAD WIDENING AND <br />RECONSTRUCTION, 30703 SOUTH MACARTHUR DRIVE, TRACY. CALIFORNIA, PREPARED BY <br />KLEINFELDER, DATED APRIL 25, 2012. <br />2. THE SITE IS GRADED TO BEST FIT WITH THE SURROUNDING CONDITIONS AND PLANNED <br />DEVELOPMENT, THE GENERAL CONTRACTOR SHALL PERFORM EARTHWORK CALCULATIONS AS <br />DEEMED NECESSARY, WHICH ACCOUNT FOR PROPOSED METHODS OF GRADING AND TRENCHING. <br />THE AMOUNT OF EARTH MOVED IS VARIABLE DEPENDENT ON, AMONG OTHER THINGS, THE GENERAL <br />CONTRACTOR'S METHODS OF OPERATION, COMPACTION, CONSOLIDATION, STRIPPING, AND UTILITY <br />TRENCHING. THE GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR ANY IMPORT OR EXPORT OF <br />MATERIAL NEEDED TO ACHIEVE THE PLAN GRADES. <br />3. EXCESS SOIL SHALL BECOME THE PROPERTY OF THE CONTRACTOR IS TO BE REMOVED FROM THE <br />PROJECT SITE, UNLESS OTHERWISE DIRECTED BY THE COUNTY. <br />4. THE COORDINATION FOR SOIL COMPACTION TESTING SHALL BE THE RESPONSIBILITY OF THE <br />CONTRACTOR. <br />5 ALL GRADING SHALL COMPLY WITH 2O11 CALIFORNIA BUILDING CODE CHAPTER 18 AND APPENDIX <br />CHAPTER33. <br />6 NO SLOPE SHALL BE STEEPER THAN 2 HORIZONTAL TO 1 VERTICAL UNLESS OTHERWISE NOTED <br />ONTHE PLANS. <br />UTILITY NOTES <br />1 NO GUARANTEE IS INTENDED THAT UNDERGROUND OBSTRUCTIONS, NOT SHOWN ON THE PLANS. MAY NOT <br />BE ENCOUNTERED UNDERGROUND UTILITIES SHOWN ON THESE PLANS ARE BASED UPON THE BEST <br />INFORMATION AVAILABLE. GENERAL CONTRACTOR SHALL UNCOVER BURIED UTILITIES TO VERIFY <br />LOCATIONS AND ELEVATIONS. IT SHALL BE THE GENERAL CONTRACTOR'S RESPONSIBILITY TO NOTIFY THE <br />CITY CONSTRUCTION TEAM OF UTILITIES CONFLICTING WITH THE PROPOSED CONSTRUCTION. <br />2, THE GENERAL CONTRACTOR IS HEREBY NOTIFIED THAT PRIOR TO COMMENCING CONSTRUCTION, HE IS <br />RESPONSIBLE FOR CONTACTING ALL UTILITY COMPANIES FOR VERIFICATION AT THE CONSTRUCTION SITE <br />OF THE LOCATIONS OF ALL UNDERGROUND FACILITIES WHERE SUCH FACILITIES MAY POSSIBLE CONFLICT <br />WITH THE PLACEMENT OF THE IMPROVEMENTS SHOWN ON THESE PLANS CALL "UNDERGROUND SERVICE <br />ALERT" AT 800-227-2600 TWO (2) DAYS MINIMUM TO FOURTEEN (14) DAYS MAXIMUM BEFORE ANY <br />EXCAVATION IS STARTED. <br />3 THE GENERAL CONTRACTOR SHALL SECURE A PERMIT FROM THE CALIFORNIA DEPARTMENT OF <br />INDUSTRIAL RELATIONS. DIVISION OF OCCUPATIONAL SAFETY AND HEALTH FOR THE CONSTRUCTION OF A <br />TRENCH OR EXCAVATION WHICH IS FIVE FEET OR DEEPER AND INTO WHICH A PERSON IS REQUIRED TO <br />DESCEND. <br />4 ALL UNDERGROUND IMPROVEMENTS SHALL BE INSTALLED AND APPROVED PRIOR TO PAVING. <br />5 DISTANCE AND INVERT GRADES OF UTILITY LINES SHOWN ARE TO THE CENTER LINE OF INLETS, CATCH <br />BASINS, AND MANHOLES DISTANCES ARE HORIZONTAL. <br />6 ALL BURIED IRON, STEEL.. CAST IRON. GALVANIZED STEEL, AND DIELECTRIC COATED STEEL OR IRON SHALL <br />BE PROTECTED AGAINST CORROSION WITH A POLYETHYLENE ENCASEMENT PER ANSI A21.5 <br />7 STORM DRAIN LINES SHALL BE SMOOTH WALL HIGH DENSITY POLYETHYLENE (HDPE) WITH POSITIVE, <br />WATERTIGHT JOINTS CONFORMING TO CALTRANS STANDARD SPECIFICATION SECTION 64, TYPE S OR <br />CLASS III RCP CONFORMING TO THE STANDARD SPECIFICATIONS SECTION 65 OR PVC PIPE, SDR 35 IN <br />ACCORDANCE WITH ASTM D-3034. <br />8 PIPE BACKFILL MATERIAL, FILLED AND COMPACTED TO ONE FOOT OVER THE TOP OF PIPE SHALL <br />CONFORM TO THE FOLLOWING SPECIFICATION: <br />PERCENT PASSING 3/" SIEVE 100 <br />PERCENT PASSING 3/81' SIEVE 80 - 100 <br />PERCENT PASSING NO. 4 SIEVE 30 - 70 <br />PERCENT PASSING NO. 16 SIEVE 5 - 40 <br />PERCENT PASSING NO. 200 SIEVE 0-4 <br />9 TRENCH BACKFILL MATERIAL FROM ONE FOOT ABOVE TOP OF PIPE SHALL BE STRUCTURE BACKFILL <br />MATERIAL AND SHALL BE CLASS 2 AGGREGATE BASE COMPACTED TO 95% RELATIVE COMPACTION. <br />10. STORM DRAIN INLETS SHALL BE IN ACCORDANCE WITH THE DETAILS SHOWN ON THE PLANS. <br />MISCELLANOUS NOTES <br />1 THE CONTRACTOR SHALL LAYOUT IMPROVEMENTS FROM THE DIMENSIONS SHOWN ON THE PLANS. <br />ANY CLARIFICATION ON CONFLICTS, DISCREPANCIES OR AMBIGUITIES SHOULD BE DIRECTED TO THE <br />ENGINEER PRIOR TO CONSTRUCTION OF THESE IMPROVEMENTS. <br />2. THE CONTRACTOR SHALL BE RESPONSIBLE FOR MATCHING EXISTING SURROUNDING LANDSCAPE <br />AND OTHER IMPROVEMENTS WITH A TRANSITION IN PAVING, CURBS, GUTTERS, SIDEWALKS, GRADES <br />ETC. AND TO AVOID AND ABRUPT OR APPARENT CHANGES IN CROSS SLOPES, LOW SPOTS OR <br />HAZARDOUS CONDITIONS. <br />3. WHERE PAVEMENT IS TO BE EXTENDED OR REMOVED, EXISTING PAVEMENT SHALL BE SAW -CUT OR <br />GRIND TO A NEAT LINE PRIOR TO PLACING NEW ASPHALT CONCRETE. <br />4. THE CONTRACTOR SHALL PROVIDE AND MAINTAIN TEMPORARY SIGNS AND MARKINGS FOR ALL <br />REGULATORY TRAFFIC SIGNS REMOVED DURING THE CONSTRUCTION. <br />5. IT IS PROHIBITED TO DISCHARGE ANYTHING EXCEPT CLEAN WATER INTO THE STORM DRAIN SYSTEM. <br />6. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ADEQUATELY SCHEDULING INSPECTION AND <br />TESTING OF ALL FACILITIES CONSTRUCTED UNDER THIS CONTRACT. ALL TESTING SHALL CONFORM <br />TO THE REGULATORY AGENCY'S STANDARD SPECIFICATIONS <br />7. THE CONTRACTOR SHALL MAINTAIN A NEATLY MARKED SET OF FULL-SIZED AS -BUILT RECORD <br />DRAWINGS SHOWING THE FINAL LOCATION AND LAYOUT OF ALL STRUCTURES AND OTHER <br />FACILITIES. WHERE NECESSARY, SUPPLEMENTAL DRAWINGS SHALL BE PREPARED AND SUBMITTED <br />BY THE CONTRACTOR. <br />8. PRIOR TO ACCEPTANCE OF THE PROJECT, THE CONTRACTOR SHALL DELIVER TO THE ENGINEER, <br />ONE SET OF NEATLY MARKED AS -BUILT RECORD DRAWINGS SHOWING THE INFORMATION REQUIRED <br />ABOVE. <br />9, DUST CONTROL SHALL BE PROVIDED AT ALL TIMES, AT THE CONTRACTOR'S EXPENSE, TO MINIMIZE <br />ANY DUST NUISANCE AND SHALL BE IN ACCORDANCE WITH SECTION 10 OF CALTRANS STANDARD <br />SPECIFICATIONS. <br />10. FINAL PAVEMENT WORK SHALL NOT OCCUR WITHIN THE ROAD RIGHT-OF-WAY PRIOR TO <br />COMPLETION OF UTILITY RELOCATION WITHOUT SPECIFIC APPROVAL OF THE SJCO DIRECTOR OF <br />PUBLIC WORKS. <br />11 ANY CHANGES TO THE APPROVED IMPROVEMENT PLANS AND SPECIFICATION MUST BE PREPARED <br />AND CERTIFIED BY THE "CIVIL ENGINEER," AND SHALL BE SUBMITTED TO THE SJCO DIRECTOR OF <br />PUBLIC WORKS FOR APPROVAL PRIOR TO IMPLEMENTATION. <br />12, WHENEVER PAVEMENT IS BROKEN OR CUT IN THE INSTALLATION OF THE WORK COVERED BY THE <br />SPECIFICATIONS, THE PAVEMENT SHALL BE REPLACED AFTER PROPER BACKFILLING WITH <br />PAVEMENT MATERIAL EQUAL TO OR BETTER THAN THE MATERIALS USED IN THE ORIGINAL PAVING. <br />13 DRAINAGE FACILITIES SHALL BE MAINTAINED DURING PERIODS OF INCLEMENT WEATHER, AND <br />RESTORED TO THEIR ORIGINAL CONDITIONS UPON COMPLETION OF THE WORK. <br />14. CONTRACTOR SHALL PROTECT ALL BENCHMARKS AND SURVEYED MONUMENTS DURING <br />CONSTRUCTION. DAMAGED OR REMOVED MONUMENTS SHALL BE REPLACED WITH THE SAME ORDER <br />OF ACCURACY, AT THE CONTRACTOR'S EXPENSE. <br />15 A TRAFFIC CONTROL PLAN (TCP) SHALL BE SUBMITTED TO AND DEEMED ACCEPTABLE BY THE <br />COUNTY PRIOR TO START OF WORK, THIS SHALL ADDRESS ALL PHASES OF WORK, WHICH WILL <br />IMPACT PUBLIC TRAFFIC, CONFORMANCE WITH THE TCP SHALL BE MAINTAINED AT ALL TIME <br />16. ALL TRAFFIC SIGNS AND MARKINGS SHALL CONFORM TO THE MANUAL ON UNIFORM TRAFFIC <br />CONTROL DEVICES (MUTCD), MUTCD CALIFORNIA SUPPLEMENT, AND SAN JOAQUIN COUNTY <br />STANDARDS AS SHOWN ON THE PLANS <br />EROSION PREVENTION AND SEDIMENT <br />CONTROL NOTES <br />1 ALL EROSION AND SEDIMENT CONTROL MEASURES SHALL BE CONSTRUCTED AND MAINTAINED IN <br />ACCORDANCE WITH THE COUNTY OF SAN JOAQUIN. <br />2 EROSION CONTROL BEST MANAGEMENT PRACTICES (BMPs) SHALL BE INSTALLED AND MAINTAINED BY THE <br />CONTRACTOR. SEDIMENT CONTROL BMPs SHALL BE INSTALLED AND MAINTAINED ALL YEAR ROUND. <br />3. ALL DRAINAGE INLETS IMMEDIATELY DOWNSTREAM OF THE WORK AREAS AND WITHIN THE WORK AREAS, <br />EXISTING AND PROPOSED, SHALL BE PROTECTED WITH SEDIMENT CONTROL AND INLET FILTER BAGS YEAR <br />ROUND. INLET FILTER BAGS SHALL BE REMOVED FROM DRAINAGE INLETS UPON ACCEPTANCE OF <br />IMPROVEMENTS BY THE COUNTY <br />4 ALL CONSTRUCTION ENTRANCES SHALL HAVE A STABILIZED CONSTRUCTION ACCESS CONSTRUCTED BE <br />COUNTY STANDARDS. WHERE CONSTRUCTION TRAFFIC ENTERS OR LEAVES PAVED AREAS, THE <br />STABILIZED ACCESS SHALL BE MAINTAINED ON A YEAR ROUND BASIS UNTIL THE COMPLETION OF THE <br />PROJECT. <br />5. ALL AREAS DISTURBED DURING CONSTRUCTION BY GRADING, TRENCHING, OR OTHER ACTIVITIES SHALL BE <br />PROTECTED FROM EROSION DURING THE WET SEASON (OCTOBER 1 THROUGH APRIL 30). HYDROSEED IF <br />UTILIZED, MUST BE PLACED BY SEPTEMBER 15. HYDROSEED PLACED DURING THE WET SEASON SHALL BE A <br />SECONDARY EROSION PROTECTION METHOD. <br />6. SENSITIVE AREAS AND AREAS WHERE EXISTING VEGETATION IS BEING PRESERVED SHALL BE PROTECTED <br />WITH TEMPORARY FENCING (TYPE ESA). SEDIMENT CONTROL BMPs SHALL BE INSTALLED WHERE ACTIVE <br />AREAS DRAIN INTO SENSITIVE OR PRESERVED VEGETATION AREAS. <br />7 SEDIMENT CONTROL BMPs SHALL BE PLACED ALONG THE PROJECT PERIMETER WHERE DRAINAGE LEAVES <br />THE PROJECT SEDIMENT CONTROL BMPs SHALL BE MAINTAINED YEAR ROUND UNTIL THE CONSTRUCTION <br />PROJECT IS COMPLETE OR THE DRAINAGE PATTERN HAS BEEN CHANGED AND NO LONGER LEAVES THE <br />SITE. <br />8. EROSION AND SEDIMENT CONTROL MEASURES FOR THIS PROJECT SHALL COMPLY WITH THE <br />STORMWATER POLLUTION PREVENTION PLAN (SWPPP) PREPARED FOR THE PROJECT BY THE <br />CONTRACTOR IN ACCORDANCE WITH THE CALIFORNIA GENERAL CONSTRUCTION PERMIT THIS PERMIT <br />REQUIRES THAT THE SWPPP BE KEPT UP TO DATE TO REFLECT THE CHANGING SITE CONDITIONS AND THE <br />SWPPP IS TO BE AVAILABLE ON SITE AT ALL TIMES FOR FOR REVIEW BY STATE AND LOCAL INSPECTORS. <br />9. BMPs TO BE IN PLACE AND INSPECTED PRIOR TO GROUND BREAKING. <br />10. INSTALLATION AND MAINTENANCE OF EROSION CONTROL AND SEDIMENT CONTROL MEASURES ARE THE <br />RESPONSIBILITY OF THE CONTRACTOR. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE PREVENTION <br />OF SIGNIFICANT EROSION AND SILTATION ENTERING THE STORM DRAIN SYSTEM. NATURAL DRAINAGE <br />COURSES AND/OR INTRUDING UPON ADJACENT ROADWAYS AND PROPERTIES. THIS RESPONSIBILITY <br />SHALL APPLY THROUGHOUT THE COURSE OF CONSTRUCTION AND UNTIL ALL DISTURBED AREAS HAVE <br />BECOME STABILIZED AND SHALL NO THE LIMITED TO WET WEATHER PERIODS. <br />11. ALL EROSION AND SEDIMENT CONTROL MEASURES SHALL BE IN ACCORDANCE WITH THE COUNTY OF SAN <br />JOAQUIN STANDARDS AND WITH THE EROSION PREVENTION AND SEDIMENT CONTROL BEST MANAGEMENT <br />PRACTICES CONTAINED IN THE LATEST EDITIONS OF THE FOLLOWING PUBLICATIONS OR AN EQUIVALENT <br />BEST MANAGEMENT PRACTICE: <br />• CONSTRUCTION SITE BEST MANAGEMENT PRACTICES MANUAL BY CALTRANS. <br />• EROSION AND SEDIMENT CONTROL FIELD MANUAL BY THE SAN FRANCISCO BAY REGIONAL WATER <br />QUALITY CONTROL BOARD. <br />• MANUAL OF STANDARDS FOR EROSION & SEDIMENT CONTROL MEASURES BY THE ASSOCIATION <br />OF BAY AREA GOVERNMENTS. <br />• STORM WATER BEST MANAGEMENT PRACTICE HANDBOOK BY THE CALIFORNIA STORM WATER <br />QUALITY ASSOCIATION. <br />12. IF DISCREPANCIES OCCUR BETWEEN THESE NOTES. MATERIAL REFERENCED HEREIN OR MANUFACTURER'S <br />RECOMMENDATIONS, THEN THE MOST PROTECTIVE SHALL APPLY. <br />13. THE CONTRACTOR IS RESPONSIBLE FOR PREVENTING STORM WATER POLLUTION GENERATED FROM THE <br />CONSTRUCTION SITE AT ALL TIMES. THE GENERAL CONTRACTOR MUST IMPLEMENT AN EFFECTIVE <br />COMBINATION OF EROSION PREVENTION AND SEDIMENT CONTROL ON ALL DISTURBED AREAS DURING THE <br />RAINY SEASON (OCTOBER 1 -APRIL 30). <br />14. EROSION PREVENTION AND SEDIMENT CONTROL MEASURES SHALL BE INSPECTED BY THE CONTRACTOR <br />BEFORE FORCASTED STORM EVENTS AND AFTER ACTUAL STORM EVENTS TO ENSURE MEASURES ARE <br />FUNCTIONING PROPERLY STORM EVENTS PRODUCE AT LEAST ONE INCH OF PRECIPITATION IN A 24 HOUR <br />PERIOD. EROSION PREVENTION AND SEDIMENT CONTROL MEASURES THAT HAVE FAILED OR ARE NO <br />LONGER EFFECTIVE SHALL BE PROMPTLY REPLACED. EROSION PREVENTION AND SEDIMENT CONTROL <br />MEASURES SHALL BE MAINTAINED UNTIL DISTURBED AREAS ARE STABILIZED. <br />15. DISCHARGES OF POTENTIAL POLLUTANTS FROM CONSTRUCTION SITES SHALL BE PREVENTED USING <br />SOURCE CONTROLS TO THE MAXIMUM EXTENT PRACTICABLE POTENTIAL POLLUTANTS INCLUDE BUT ARE <br />NOT LIMITED TO: SEDIMENT, TRASH, NUTRIENTS, PATHOGENS, PETROLEUM HYDROCARBONS, METALS, <br />CONCRETE, CEMENT, ASPHALT, LIME, PAINT, STAINS, GLUES, WOOD PRODUCTS, PESTICIDES, HERBICIDES, <br />CHEMICALS, HAZARDOUS WASTE, SANITARY WASTE, VEHICLE OR EQUIPMENT WASH WATER, AND <br />CHLORINATED WATER. <br />16. WHENEVER IT IS NOT POSSIBLE TO UTILIZE EROSION PREVENTION MEASURES, EXPOSED AREAS SHALL <br />EMPLOY SEDIMENT CONTROL DEVICES, SUCH AS FIBER ROLLS AND SILT FENCES. FIBER ROLLS AND SILT <br />FENCES SHALL BE TRENCHED AND KEYED INTO THE SOIL AND INSTALLED ON CONTOUR OR AS SHOWN ON <br />THE EROSION CONTROL PLAN. SILT FENCES SHALL BE INSTALLED APPROXIMATELY TWO TO FIVE FEET <br />FROM TOE OF SLOPE. <br />17. SOIL AND MATERIAL STOCKPILES SHALL BE PROPERLY PROTECTED TO MINIMIZE SEDIMENT AND <br />POLLUTANT TRANSPORT FROM THE CONSTRUCTION SITE. <br />18. SOLID WASTE, SUCH AS TRASH, DISCARDED BUILDING MATERIALS AND DEBRIS, SHALL BE PLACED IN <br />DESIGNATED COLLECTION AREAS OR CONTAINERS. THE CONSTRUCTION SITE SHALL BE CLEARED OF <br />SOLID WASTE DAILY, OR AS NECESSARY, AND REGULAR REMOVAL AND PROPER DISPOSAL SHALL BE <br />ARRANGED. <br />19. A CONCRETE WASHOUT AREA SHALL BE DESIGNATED TO CLEAN CONCRETE TRUCKS AND TOOLS. AT NO <br />TIME SHALL CONCRETE PRODUCTS AND WASTE BE ALLOWED TO ENTER COUNTY WATERWAYS SUCH AS <br />CREEKS OR STORM DRAINS <br />20. PROPER APPLICATION, CLEANING AND STORAGE OF POTENTIALLY HAZARDOUS MATERIALS, SUCH AS <br />PAINTS AND CHEMICALS, SHALL BE CONDUCTED TO PREVENT THE DISCHARGE OF POLLUTANTS. <br />21. WHEN UTILIZED, TEMPORARY RESTROOMS AND SANITARY FACILITIES SHALL BE LOCATED AND MAINTAINED <br />TO PREVENT THE DISCHARGE OF POLLUTANTS. <br />22. APPROPRIATED VEHICLE STORAGE, FUELING, MAINTENANCE AND CLEANING AREAS SHALL BE DESIGNATED <br />AND MAINTAINED TO PREVENT DISCHARGE OF POLLUTANTS. <br />23. IMPLEMENTATION OF THE RECOMMENDED EROSION CONTROL MEASURES AS SHOWN ON THESE PLANS <br />DOES NOT ENSURE COMPLIANCE WITH FEDERAL, STATE AND LOCAL LAWS, REGULATIONS AND <br />ORDINANCES. THE BURDEN OF COMPLIANCE RESTS SOLELY WITH THE OWNER AND DEVELOPER OF THE <br />PROJECT. <br />LEGEND <br />STORM DRAIN (SEE PLAN FOR SIZE) <br />- EXISTING DRAIN INLET <br />EXISTING STORM DRAIN <br />EXISTING STORM DRAIN MANHOLE <br />PROPOSED CURB INLET <br />PROPOSED DRAIN INLET <br />PROPOSED STORM DRAIN <br />0 -f PROPOSED STORM DRAIN MANHOLE <br />PLANAMETRICS <br />--------------- <br />_.,W. <br />CENTERLINEEASEMENT LINE <br />FLOW LINE <br />PROPERTY LINE <br />EXISTING UNDERGROUND ELECTRIC LINE <br />FENCE <br />LOCATION UNKNOWN <br />GRADE BREAK <br />BUILDING WALL <br />EXISTING CONTOUR <br />PROPOSED ASPHALT PAVING <br />1X2 VAULT <br />CHRISTY BOX <br />EXISTING TREE <br />EXISTING TREE TO BE REMOVED <br />DETAIL LETTER <br />2 SHEET NUMBER <br />ABBREVIATIONS <br />ENGINEERING <br />US Sonam Avenue <br />suite C <br />sates Ron Ca 95404 <br />TeL. (707) 544-0784 <br />F= (707) 544. W <br />Q Copyright 2012 <br />�o QROFESS lON4 <br />Sp<y�F'yG <br />ale. 30888 <br />EXP. 3-31-14 <br />C l V <br />F Fo <br />OF <br />CA <br />AB AGGREGATE BASE FG FINISH GRADE RCP REINFORCED CONCRETE PIPE <br />AD AREA DRAIN FIN FINISH LAYER REC RECORD <br />AC ASPHALT CONCRETE FDC FIRE DEPARTMENT SCH SCHEDULE <br />AFF ABOVE FINISH FLOOR FL FLOW LINE SD STORM DRAIN <br />AGG AGGREGATE FND FOUNDATION SAP SEE ARCHITECTURAL PLANS Q <br />BC BEGINNING OF CURB GALV GALVANIZED SAD SEE ARCHITECTURAL DRAWINGS 7 Uj <br />Z L <br />BLDG BUILDING G GROUND SED SEE ELECTRICAL DRAWINGS I <br />CB CATCH BASIN GB GRADE BREAK SJCO SAN JOAQUIN COUNTY 2 <br />CF CURB FACE GSM GALVANIZED SHEET METAL SPD SEE PLUMBING DRAWINGS LL <br />Q W <br />CL CENTER LINE IP IRON PIPE SPP SEE PLUMBING PLAN <br />CMU CONCRETE MASONRY UNIT(S) INV INVERT SSD SEE STRUCTURAL DRAWINGS .. O LL.. <br />CO CLEAN OUT LSCP LANDSCAPE SSPN SEE STRUCTURAL PLAN C) ^/ <br />COMP COMPACTION LF LINEAL FEET SLP SEE LANDSCAPE PLAN Z VVZ L^ <br />CONC CONCRETE MH MANHOLE SS SANITARY SEWER <br />CID CONTROL POINT MAX MAXIMUM SWK SIDEWALK W O <br />DIA or 0 DIAMETER MIN MINIMUM TB TOP OF BANK W <br />DW DRIVEWAY MSS METAL STORAGE SYSTEM TCS TOP OF CONCRETE SURFACE / C) <br />DWNSPT DOWN SPOUT MWP METAL WALL PANEL TC TOP OF CURB Uj / M <br />DI DRAIN INLET NO. NUMBER TCE TEMPORARY CONSTRUCTION EASEMENT J C`' Q co <br />EA EACH (N) NEW TG TOP OF GRATE <br />ELEC ELECTRICAL NIC NOT IN CONTRACT TOS TOP OF SLOPE " > �.-- <br />EC END OF CURVE NTS NOT TO SCALE TP TOP OF PAVEMENT U) U I <br />EG EXISTING GROUND OC ON CENTER TW TOP OF WALL Uj lid O <br />EL ELEVATION PCC PORTLAND CEMENT CONCRETE TYP TYPICAL U) ` ^ <br />EP EDGE OF PAVEMENT PD PLANTER DRAIN VC VERTICAL CURVE W M U <br />(E) EXISTING PDF POWER DRIVEN FASTENERS VEG VEGETATION 0 C)FEC FIRE EXTINGUISHER CABINET PVC POLYVINYL CHORIDE (L�L.11 <br />FX EXISTING FENCE R RADIUS z <br />FF FINISH FLOOR \\\\ G <br />STANDARD DRAWINGS <br />NEW IMPROVEMENTS ARE SUBJECT TO THE REQUIREMENTS OF THE SAN JOAQUIN COUNTY AND CALTRANS STANDARD <br />DRAWINGS LISTED BELOW. <br />SAN JOAQUIN COUNTY <br />DWG NO. DESCRIPTION <br />CW-R36 ADJUSTING STREET FACILITIES TO GRADE <br />R-17 DRIVEWAYS - RURAL, AG, & TEMP <br />R-25 STANDARD STREET SIGN DETAILS <br />R-29 TYPICAL TRENCH BACKFILL <br />CALTRANS <br />DWG NO, <br />DESCRIPTION <br />A20A <br />PAVEMENT MARKERS AND TRAFFIC LINES TYPICAL DETAILS <br />A20B <br />PAVEMENT MARKERS AND TRAFFIC LINES TYPICAL DETAILS <br />A20D <br />PAVEMENT MARKERS AND TRAFFIC LINES TYPICAL DETAILS <br />A24D <br />PAVEMENT MARKING WORDS <br />A24E <br />PAVEMENT MARKING WORDS & CROSSWALKS <br />Submittal / Revision <br />zh <br />0 <br />a <br />0 <br />0 <br />Job No: <br />06-1262 <br />Drawn By: <br />SGH <br />Checked By: <br />DS <br />Date: <br />2012-09-04 <br />Sheet Number <br />C-2 <br />'Q Q. MacArthur Drive Improvements\CiviAC1 - C5.dwg, C-2, 9/2T,'2012 2:48:53 PM <br />Q. <br />2 of 19 <br />