Project
Thornton Road Resurfacing
Limits
DeBroggi Road to 3,000' North of State Route 12
Year
2023
Project Engineer
Emmanuel Salcedo
Roads Worked
Thornton Rd.
Red Lines
Yes
Project #
222222
Districts
District 4
Supplemental fields
Cross Ref
SP7791 - SP7801
Type
Resurfacing
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
SIGNALIZATION NOTES: <br />1. Contractor shall verify location and depth of existing Caltrans detectors, conduits, pull boxes and other <br />electrical facilities before using tools or equipment that may damage those facilities or interfere with an <br />electrical system. Caltrans is not part of Underground Service Alert (USA). <br />2. Contractor shall notify the Caltrans Engineer prior to performing any work that will affect the existing traffic <br />signal operation. An advance notice of at least 3 working days is required. <br />3. All loops shall be installed and tested prior to final layer of new pavement. <br />4. Start the operational test of the system on any day except Monday, Friday or the day before a holiday. <br />Notify the Engineer two weeks before starting the test. <br />5. If adding new conductors or removing existing conductors, remove all conductors, clean the conduit under <br />Section 87- 1.03A, and pull all conductors in the conduit as 1 unit. Existing underground conduit to be <br />incorporated into a new system must be cleaned with a mandrel or cylindrical wire brush and blown out with <br />compressed air. <br />6. Locations of controller, conduits, pull boxes and other equipment shown on these plans are approximate and <br />may be changed to suit field conditions or as directed by the Engineer. <br />7. All utilities shown on these plans are approximate only. The contractor shall verify overhead and underground <br />clearance with all affected utilities prior to the start of work. <br />8. Place Type D stop bar loops 1 foot from limit line with 10' spacing between Type A loops. <br />9. Inductive loop conductors must be Type 2. <br />10. Loop detector lead --in cables (DLC) must be Type B. <br />11. Slots must be filled with hot —melt rubberized asphalt sealant. <br />12. The depth of the loop sealant above the top of the uppermost loop conductor in the sawed slots must be 2 <br />inches, minimum. <br />13. Use Method B to insulate a splice. <br />14, To be supplemented by the 2022 Caltrans Standard Plans, Standard Specifications and all Revisions. <br />Cosrreehme By <br />No Cfw Wass <br />Any Parson UWM This DnnuMg sA«dd Vbft <br />feting The Site Ol Nbrk <br />Type A Type A Type A Type D <br />Loop Splicing Diagram 1—Type D, 3—Type A connected to 1—DLC. <br />When 2—DLCs are used, Isolate the 1—Type D, Series the 3—Type A. <br />COUNTY OF SAN JOA UIN NO SCALE SIGNALIZATION NOTES AND THORNTON ROAD RESURFACING Sheet No. <br />Q DETAIL (DeBroggi Way to 3,000' North of State Route 12) 3 of 11 <br />DRAWN BY DATE PROJECT ENGINEER DATE CHECKED DATE <br />Scott Yamada 10/2023 �7"Oeeje sd&C a 11/2023 qa"(& 11/2023 <br />