Laserfiche WebLink
LEGEND TRAFFIC THIS STAGE NOTES <br />ROADWAY WORK AREA THIS STAGE 1 . MAINTAIN TRAFFIC ALONG THE EXISTING ROADWAYS <br />1 . SEE CS-1 FOR CONSTRUCTION AREA SIGNS . <br />BRIDGE CONSTRUCTION AREA THIS STAGE <br />CONSTRUCTION THIS STAGE 2 . ALL SIGNS TO BE INSTALLED ON THE SIDE STREETS , AS SHOWN ON THE PAVEMENT DELINEATION & SIGN SHEETS , <br />SHALL BE IN-PLACE AFTER COMPLETING STAGE 1 AND PRIOR TO BEGINNING STAGE 2 . STRIPE TEMPORARY STOP <br />1 . 3" GAS LINE TO BE TAKEN OUT OF SERVICE IN STAGE 1 BY PG&E .BAR AND "STOP" MARKING ON SIDE STREETS UNTIL FINAL OVERLAY IS APPLIED . <br />CONSTRUCTION PEDESTRIAN AREA THIS STAGE <br />CONTRACTOR TO REMOVE EXIST 3" GAS LINE FROM BRIDGE . <br />2 . CONSTRUCT PAVEMENT STRUCTURAL SECTION FOR <br />3 . ALL TEMPORARY TRAFFIC STRIPES AND MARKINGS IN STAGES 1 , 2 & 3 SHALL BE PAINTED (2 COAT) . <br />DIRECTION OF TRAFFIC , THIS STAGE OF CONSTRUCTION VEHICLE TRAVEL IN STAGE 2 4 . ALL EXISTING AND TEMPORARY STRIPING AND MARKINGS THAT CONFLICT WITH NEW TEMPORARY STRIPING AND <br />NOT A MARKING , FOR REFERENCE ONLY) <br />3 . CONSTRUCT WEST SIDE OF PROPOSED BRIDGE <br />MARKINGS SHALL BE REMOVED DURING THE SAME WORK SHIFT . ALL STRIPING REMOVAL SHALL BE SAND-BLASTED <br />DETAIL NUMBER (SEE STD PLANS) - PAINTED <br />OR GROUND OFF . NO PAINTED REMOVALS ARE ACCEPTABLE . <br />25A <br />TRAFFIC STRIPE (2 - COAT) 4 . CONSTRUCT TEMPORARY PEDESTRIAN WALKWAY ALONG 5 . ALL EXISTING SPEED LIMIT SIGNS SHALL BE COVERED AND SPEED LIMIT PAVEMENT MARKINGS SHALL BE <br />WEST SIDE OF PROPOSED BRIDGE . 4 ' MIN WIDTH , REMOVED PRIOR TO BEGINNING STAGE 1 CONSTRUCTION . <br />0 TEMPORARY SURFACE MOUNTED CHANNELIZER ATTACH TO FALSEWORK <br />STA Line <br />6 . PEDESTRIAN TRAFFIC SHALL BE MAINTAINED ADJACENT TO THE WEST SIDE OF THE PROPOSED BRIDGE FOR STAGE 1 AND 2 <br />TEMPORARY CRASH CUSHION ARRAY TYPE ' TU11 ' AND TO THE EAST SIDE FOR STAGE 3 . SIGNS SHALL BE PROVIDED TO GUIDE PEDESTRIANS TO DETOUR WALKWAYS . <br />STAGE 1 STAGE 1 TRAFFIC 7 . ALL DIMENSIONS SHOWN FOR WIDTH OF WORK AREA ARE APPROXIMATE . <br />4 ' M I N CONSTRUCTION EXIST EXISTNVG BRDGE)EXIST <br />VARIES ETW ETW <br />3 ' -5" TO 4 ' -8" <br />27 '-0" 3 ' -4' 12 '-0" 12 '-0" 3 '-4" <br />3" GAS TO BE <br />TEMPORARILY <br />i- <br />O REMOVED BY PG&E <br />6" GAS <br />TEMPORARY <br />PEDESTRIAN STAGE 1 <br />WALKWAY <br />SECTION A—A STAGE 1 <br />NO SCALE <br />TEMPORARY RELOCATION OF <br />STREET LIGHT <br />I <br />I 0 <br />I <br />O <br />r I <br />TEMPORARY CONSTRUCTION FENCE <br />CZi <br />R/W A 4 ' MIN WALKWAY 31 . 8 ' <br />G <br />4 ' MIN <br />WALKWAY A.: <br />m <br />25 . 2 ' <br />EP - ATE EP c m <br />m <br />CONFORM <br />CONFORM <br />o a 1 0 <br />0 00o <br />0 0 0 <br />SURFACE MOUNTED <br />r __ 25 TYPI. j.. <br />12 ' ± EXIST EP <br />CHANNFLt= <br />LOWER SACRAMENTO ROAD 12 ' ± <br />CONTRACTOR TO MAINTAIN ACCESS <br />r k, R t1 <br />i { <br />AJf <br />MN <br />ufrecuonss ByChanges <br />F 1/" <br />c <br />EXISTEP7 ny Person UsingThle Drawing 5t101 d 1MMy <br />of ironrmaonn Rv ;nsnertino The Site Of WO* <br />R'W sc-1 <br />Qs0ESS1pNq <br />BEFORE EXCAVATING Revision Description Date By Approved <br />CALL U.S.A. MARK THOMAS & COMPANY, INC. <br />N F <br />DEPARTMENT OF PUBLIC WORKS <br />UNDERGROUND SERVICE ALERT ORIGINAL SCALE IN INCHES 7300 FOLSOM BOULEVARD, SUITE 203 370 <br />A <br />800-227-2600 SACRAMENTO CALIFORNIA 95826 <br />No. 35 <br />TOLL FREE <br />FOR REDUCED PLAN <br />916) 381-9100 Exp. 9/30/0 SAN JOAQUIN COUNTY, CALIFORNIA <br />2 WORKING DAYS BEFORE ALL <br />PLANNED WORK OPERATIONS 0 1 2 3 <br />IVT9TFOF \ <br />Fo\ <br />P <br />DRAWN BY DATESHEET TOTALPROJECTENGINEERDATECHECKEDDATEAPPROVALRECOMMENDEDDATE <br />COUNTY OF SAN JOAQUIN SCALE: 1 "=20 ' <br />STAGE CONSTRUCTION LOWER SACRAMENTO ROAD IMPROVEMENTS NO. SHEETSINGUI'EN 5 fo oa <br />J APPS 5/fo/oa C. ROCKWAY 5/o/oa PLANS — STAGE 1 TURNER ROAD TO WOODBRIDGE ROAD — PHASE 1 30 64 <br />FILE NAME DRAWER SHEET NO. ACAD REVISIONS DATE