My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
L782 - L845
PublicWorks
>
VAULT MAPS
>
Large Plans - LP
>
Drawer L
>
L782 thru
>
L782 - L845
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/31/2024 10:33:13 AM
Creation date
12/31/2024 10:26:20 AM
Metadata
Fields
Template:
Large Plans - LP
Project
Lower Sacramento Road Improvements ā(Phase 1 - WID Canal to Woodbridge Road)ā
Limits
Turner Road to Woodbridge Road
Year
2004
Project Engineer
A. Engel
Roads Worked
Lower Sacramento Rd.
Red Lines
Yes
Supplemental fields
Classification
Record Drawings
Cross Ref
L782 - L845
Type
Improvements
Document Relationships
Agusta Street (Woodbridge)
(Message)
Path:
\VAULT MAPS\*CARD CATALOG*\A
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
STA Line <br />TRAFFIC THIS STAGE <br />1 . SHIFT TRAFFIC ONTO NEW PAVEMENT AND BRIDGE 70 ' -0" <br />2 . SHIFT PEDESTRIAN TRAFFIC ONTO THE TEMPORARY PEDESTRIAN WALKWAY <br />38 ' -0" 32 '-0" <br />3 . PEDESTRIAN TRAFFIC TO CROSS ROADWAY AT ACADEMY STREET AND AUGUSTA STREET <br />2 '-0" STAGE 2 TRAFFIC <br />2 ā0 STAGE 2 <br />CONSTRUCTION <br />CONSTRUCTION THIS STAGE 11 ' -6" 11 ' -6" 43 ' -0" <br />1 . REMOVE OR GRIND EXISTING PAVEMENT AS NECESSARY <br />2 . PRIOR TO EXIST BRIDGE REMOVAL , PG&E TO RELOCATE 3" AND 6" GAS LINES 10 '-0" 13 '-0" 6 ' -0" 7 '-0" 1 '-0" <br />TO WEST SIDE OF PROPOSED BRIDGE <br />3 . REMOVE EXISTING BRIDGE <br />4 . CONSTRUCT EAST SIDE OF PROPOSED BRIDGE a®o <br />5 . CONSTRUCT CURB , GUTTER , SIDEWALK , DRIVEWAYS , I t s <br />ACCESS RAMPS AND PAVEMENT OVERLAY WITHIN WORK LIMITS <br />6 . CONSTRUCT RAISED MEDIAN ON BRIDGE L J <br />TEMPORARY BARRIER (TYPE K ) <br />7 . CONSTRUCT CONCRETE BARRIER TYPE 26 ON EAST SIDE SEE NOTE 2 <br />8 . COMPLETE CLOSURE POUR CLOSURE POUR SEE NOTE 2 <br />5 '-8" MAX REMOVE EXIST BRIDGE <br />STAGE 2 <br />SECTION A-A STAGE 2 <br />NO SCALE <br />CONSTRUCTION SIGN C18 & C17 STA 116+50 <br />PEDESTRIANS TO USE CROSSWALKS AT STA 105+40 PEDESTRIANS TO USE CROSSWALKS AT STA 118+75 nom <br />I Z <br />I <br />I I <br />O <br />r <br />Z i TEMPORARY CONSTRUCTION FENCE c <br />TEMPORARY PEDESTRIAN WALKWAY <br />4 ' MIN WALKWAY TEMPORARY BARRIER (TYPE K) m <br />cp <br />A <br />I 4 ' MIN <br />RAW SEE TRAFFIC THIS STAGE NOTE 3) Cg TE <br />4 ' MIN WALKWAY m <br />WALKWA <br />m 1 : 10 <br />m 11 . 5 ' 11 ' MIN <br />1 22 11 ' MIN <br />11 . 5 ' 11 ' MIN 27B <br />11 ' MIN <br />RE 1 1 2+ t ttctibns By <br />276 ORM <br />ter oG <br />3hOw Verify <br />Sl- <br />An + Person Tn <br />CONFORLOWERSACRAMENTOROAD M h,rrrtrith`, : ..gr u:tlF+t *hrSNS ns VNtarM <br />O <br />R43 CONTRACTOR TO MAINTAIN ACCESS <br />26 . 9 ' A 43 . 0 ' 37 . 8R/W <br />FLASHING ARROW SIGN 10 . 0 ' <br />CONSTRUCTION SIGN C18 & C17 STA 107+50 <br />R17 <br />00 00 00 R43 <br />0 0 0 <br />R17B <br />00 00 00 <br />FLASHING ARROW SIGN S C-2 <br />0 0 0 <br />V <br />0 0 0 <br />0 0 0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 pROVESSIONq/ <br />N⢠R <br />BEFORE EXCAVATING R m DesariptiDate By pBNoaa <br />ve <br />o \5 OC <br />L <br />FF <br />CALL U.S.A. MARK THOMAS & COMPANY, INC. DEPARTMENT OF PUBLIC WORKS <br />UNDERGROUND SERVICE ALERT ORIGINAL SCALE IN INCHES 7300 FOLSOM BOULEVARD, SUITE 203 No. 35 70 <br />10 <br />800-227-2600 FOR REDUCED PLAN SACRAMENTO, CALIFORNIA 95826 <br />TOLL FREE 916) 381-9100 Exp. 9/30/0 SAN JOAQUIN COUNTY, CALIFORNIA <br />2 WORKING DAYS BEFORE ALLsr9 CVL P <br />PLANNED WORK OPERATIONS 0 1 2 3 TF OF CAV F <br />DRAWN BY DATESHEET TOTAL <br />T. NCUI'EN 5 fo a <br />PROJECT ENGINEER DATE CHECKED DATE APPROVAL RECOMMENDED DATE <br />COUNTY OF SAN J OAQ U I N SCALE: 120 ' STAGE CONSTRUCTION LOWER SACRAMENTO ROAD IMPROVEMENTS NO. SHEETSo <br />J. APPS s/1% C. ROCKWAY 511010+ r s/4o¢ PLANS - STAGE 2 TURNER ROAD TO WOODBRIDGE ROAD - PHASE 1 31 64 <br />FILE NAME DRAWER I SHEET NO. ACAD REVISIONS DATE
The URL can be used to link to this page
Your browser does not support the video tag.