Laserfiche WebLink
TRAFFIC THIS STAGE <br />1 . SHIFT TRAFFIC TO ULTIMATE LOCATION <br />2 . SHIFT PEDESTRIAN TRAFFIC FROM TEMPORARY STA Line <br />PEDESTRIAN WALKWAY TO EAST SIDE OF BRIDGE <br />PROPOSED PROPOSED <br />CONSTRUCTION THIS STAGE <br />STAGE 3 TRAFFIC STAGE 3 TRAFFIC <br />ETW <br />1 '-0" 13 '-0" 6 '-0" <br />ETW <br />1 ,1 . REMOVE TEMPORARY PEDESTRIAN WALKWAY 13 '-0" 10 —0" 13 '-0"6 ' -0" 7 '-0"011 <br />2 . CONSTRUCT CURB , GUTTER , SIDEWALK , ACCESS RAMPS <br />AND DRIVEWAY RAMPS WITHIN WORK LIMITS <br />3 . CONSTRUCT CONCRETE BARRIER TYPE 26 ON THE WEST SIDE 2 ' -0" <br />4 . CONSTRUCT AESTHETIC RAILING AND PILASTERS — BOTH SIDES <br />0 <br />1C <br />NOTE <br />TEMPORARY BARRIER (TYPE K) <br />1 . USE PERMANENT STRIPING FOR TWO—WAY LEFT TURN LANE <br />AND NORTHBOUND STRIPING . <br />SECTION A—A STAGE 3 <br />NO SCALE <br />i <br />n Z <br />1 I <br />a I <br />O j <br />I Z I I <br />I CD <br />A <br />R/Wd0lS TYPE K) <br />dOlSxxGATE <br />TAP <br />m <br />O <br />0 <br />O00O <br />1 2 ' CONTRACTOR TO MAINTAIN ACCESS <br />27B <br />r <br />T _M N._ <br />wit--- <br />LOWER SACRAMENTO ROAD 12 ' <br />I <br />6 ' <br />rl <br />R/W - <br />CA: <br />j F RAW <br />orrectiom BY <br />mac-} Changes <br />at k 2 <br />DFtog Sh <br />r, <br />fould <br />VetMY <br />C//_a,ry Person <br />rno cit. n<Wr<rk <br />V VIsnrmsationrVmspectinc <br />QROFESSIONq/BEFORE EXCAVATING nevis on O <br />No. <br />Description Date By ApprovedCALL <br />SERVICE MARK THOMAS & COMPANY, INC. DEPARTMENT OF PUBLIC WORKSUNDERGROUNDSERVICEALERTORIGINALSCALEININCHES <br />7300 FOLSOM BOULEVARD, SUITE 203800-227-2600 <br />No. 35370 <br />TOLL FREE FOR REDUCED PLAN SACRAMENTO, CALIFORNIA 95826 <br />2 WORKING DAYS BEFORE ALL 916) 381-9100 Ezp. 9 30 05 SAN JOAQUIN COUNTY, CALIFORNIA <br />sf CIVIL PPLANNEDWORKOPERATIONS0123119TFOFCAVF <br />DRAWN BY DATE PROJECT ENGINEER DATE CHECKED DATE APPROVAL RECOMMENDED DATE <br />E32 M <br />T. NCUYEN s 1'0 oa <br />COUNTY 0 F SAN J OAQ U I N SCALE: i "-20 ' STAGE CONSTRUCTION LOWER SACRAMENTO ROAD IMPROVEMENTSJ. APPS 5/10/04 C. ROCKWAY 5/10/04or,,,',.fo uo s1,,>PLANS — STAGE 3 TURNER ROAD TO WOODBRIDGE ROAD — PHASE 1FILENAMEDRAWERSHEETN0. ACAD REVISIONS DATE