My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Improvement District No. 51 - East Stockton Sanitary Sewer Project- Contract Drawings for South Collection System - Schedule E
PublicWorks
>
VAULT MAPS
>
References
>
Improvement District No. 51 - East Stockton Sanitary Sewer Project
>
Improvement District No. 51 - East Stockton Sanitary Sewer Project- Contract Drawings for South Collection System - Schedule E
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/27/2025 9:11:50 AM
Creation date
1/24/2025 1:39:36 PM
Metadata
Fields
Template:
Reference
Ref Doc Name
Improvement District No. 51 - East Stockton Sanitary Sewer Project- Contract Drawings for South Collection System - Schedule E
Non-Public Works
Yes
Division Submitted By
Design Engineering
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
151
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
FILBERT STREET <br />SHASTA AVENUE <br />�a <br />a <br />4 <br />..- <br />,.�. <br />FILBERT 3T <br />O <br />.. .. ., <br />.. <br />ZS55 ` <br />v t@ <br />man <br />r <br />42"W <br />* A age f,•y �P 9 <br />d t <br />� r r <br />4S <br />� 3 <br />NOTES: <br />I) TAP EXISTING /Z" SEWER <br />IN r,4REE LOCATIONS ANO <br />IS "SEINER I A/ rWO LOCATIONS <br />PER SEWER TAP 0E TAIL . <br />2) LATERALS TO BE TYPE SNR <br />PER SPECIFICATIONS. <br />M WER A VENUE <br />W <br />v <br />C4 <br />U h <br />25 <br />z <br />s <br />a. ei <br />z <br />PAVEMENT PROFILE _. <br />I IW <br />ZS <br />20 <br />20 <br />/S <br />11 <br />_`i EX. b" S _ <br />—_ � — I I <br />/s <br />(• " 5 _ <br />Ex <br />/0 <br />I.. I <br />EX. 42, w <br />11 Ex. 4Z w <br />5 V <br />..:.. <br />0 <br />0 <br />0 / 2 3 4 5 6 7 8 9 /0 <br />DATE: <br />GEORGE S. NOLTE AND ASSOCIATES <br />BY: � <br />■ <br />■ <br />GEORGE S. NOLTE AND ASSOCIATES <br />CIVIL AND ENVIRONMENTAL ENGINEERS •PLANNERS •SURVEYORS <br />SAN JOSE • WALNUT CREEK • SACRAMENTO • SAN DIEGO <br />140812e1•3400 la i 5) s34.8060 lei el 448-5Q20 (714j 27e-9392 <br />—EAST STOCKTON SANITARY SEWER PROJECT— <br />SOUTH COLLECTION SYSTEM — SCHEDULE E <br />MINER AVENUE S T A 0+0 0 TO 13+0 O <br />SHEET <br />130 <br />OF 151 SHEETS <br />SCALE: H./""50; Y./"•5' <br />DESIGNED: C.S.PARKER <br />DATE:4 25-84 R.C.E 32717 <br />DRAWN: L.A.MAL/N <br />CHECKED: O.T.SC11&rfT <br />COUNTY <br />JOB NO. <br />2181— 83— <br />PROJ. ENGR.: R. R. NE/NEN <br />DA DATE: 7' o' B4 R.C.E. /7 io 2 <br />By <br />DATE <br />REVISIONS <br />
The URL can be used to link to this page
Your browser does not support the video tag.