Laserfiche WebLink
GOLDEN GATE AVENUE <br />AL/CE STREET <br />WINOSOR A VENUE <br />25 <br />20 <br />/5 <br />/0 <br />0 <br />MINER A VENUE <br />NOTES I. LATERALS ON SOUTH SIDE <br />TO BE TYPE SHR PER <br />SPECIFICATIONS <br />2 TAP EXISTING I2"SS IN EIGHT <br />LOCATIONS PER SEWER TAP <br />DETAIL. <br />3. TIE-IN TO EX, MANHOLES <br />PER DETAILS. <br />PAVEMENT PROFILE <br />} 4 <br />EN. /2" S \� <br />34/2 <br />ZS <br />20 <br />/5 <br />/0 <br />5 <br />0 <br />/3 /4 /S /6 / 7 /8 /9 ZO 2/ 2 2 Z3 24 <br />DATE: <br />GEORGE S. NOLTE AND ASSOCIATES <br />BY: <br />■ <br />GEORGE S. NOLTE AND ASSOCIATES <br />CIVIL AND ENVIRONMENTAL ENGINEERS III •SURVEYORS <br />SAN JOSE • WALNUT CREEK • SACRAMENTO • SAN DIEGO <br />(�081287-3400 (415( 934-HOBO 1918) �48-5Q20 (714) 278.9392 <br />-EAST STOCKTON SANITARY SEWER PROJECT- <br />SOUTH COLLECTION SYSTEM - SCHEDULE E <br />MINER AVENUE S T A 1 3+0 0 TO 2 4+0 0 <br />SHEET <br />131 <br />OF 11 SHEETS <br />SCALE: H./'•50, V. I'•5' <br />DESIGNED: C.S PARKER. <br />DATE: 4,25-84 R.C.E 32717 <br />DRAWN: PVC./ENSEN. <br />COUNTY OF SAN JOAQUIN <br />CHECKED: O. T SCHUL TES <br />JOB NO. <br />2181- 83- <br />PROJ. ENGR.: R. R. HE/H <br />B <br />DATE: 7 40.8 4 R.C.E. I7 4 2 <br />BY <br />DATE <br />REVISIONS <br />