My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Improvement District No. 51 - East Stockton Sanitary Sewer Project- Contract Drawings for South Collection System - Schedule E
PublicWorks
>
VAULT MAPS
>
References
>
Improvement District No. 51 - East Stockton Sanitary Sewer Project
>
Improvement District No. 51 - East Stockton Sanitary Sewer Project- Contract Drawings for South Collection System - Schedule E
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/27/2025 9:11:50 AM
Creation date
1/24/2025 1:39:36 PM
Metadata
Fields
Template:
Reference
Ref Doc Name
Improvement District No. 51 - East Stockton Sanitary Sewer Project- Contract Drawings for South Collection System - Schedule E
Non-Public Works
Yes
Division Submitted By
Design Engineering
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
151
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
W/NOSOR AVENUE <br />b <br />' <br />goo <br />DATE: <br />SCALE: H. 1'=50; V 7 -E <br />DESIGNED: C. S PARKER <br />DRAWN: W. C. ✓ENSEN <br />CHECKED: O. T. SCHULTEB <br />PROD. ENGR.: R. R. HEIHE1 <br />BROADWAY AVENUE <br />H/GHWA Y <br />99 <br />NOTES: I. LATERALS ON SOUTH SIDE TO <br />BE TYPE SHR PER SPECIFICATION <br />2. TAP EXIST111IG 12' SS /N N1NE <br />LOCATIONS PER SEWER TAP <br />DETAIL. <br />3. T/E- /N TO EX. MH PER DETAILS. <br />MINER A VENUE <br />W <br />U <br />PPAVEMENT PROFILE' <br />V <br />a <br />24 25 <br />REVISIONS <br />27 28 29 30 3/ 32 33 <br />GEORGE S. NOLTE ANO ASSOCIATES <br />BY: le ■■ GEORGE S. NOLTE AND ASSOCIATES <br />DATE: 4.25 Ei4 R.D.E 32717 CIVIL AND ENVIRONMENTAL ENGINEERS • PLANNERS • SURVEYORS <br />COON F SAN JOAQU;N ■ SAN JOSE • WALNUT CREEK • SACRAMENTO SAN DIEGO <br />BY: <br />.— 7 - _ 0. ea . - � 1-7 a d 2 (4081287-3400 (415) 934 8060 (916144O M20 (7141 278. 02 <br />— EAST STOCKTON SANITARY SEWER PROJECT — <br />SOUTH COLLECTION SYSTEM — SCHEDULE E <br />MINER AVENUE STA 24+00 TO 33+00 <br />25 <br />20 <br />/5 <br />i0 <br />5 <br />0 <br />SHEET <br />132 <br />OF 151 SHEETS <br />JOB NO. <br />2181- 83- <br />
The URL can be used to link to this page
Your browser does not support the video tag.