My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Improvement District No. 51 - East Stockton Sanitary Sewer Project- Contract Drawings for South Collection System - Schedule E
PublicWorks
>
VAULT MAPS
>
References
>
Improvement District No. 51 - East Stockton Sanitary Sewer Project
>
Improvement District No. 51 - East Stockton Sanitary Sewer Project- Contract Drawings for South Collection System - Schedule E
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/27/2025 9:11:50 AM
Creation date
1/24/2025 1:39:36 PM
Metadata
Fields
Template:
Reference
Ref Doc Name
Improvement District No. 51 - East Stockton Sanitary Sewer Project- Contract Drawings for South Collection System - Schedule E
Non-Public Works
Yes
Division Submitted By
Design Engineering
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
151
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
HORNER AVENUE <br />CAR/NEL/A AVENUE <br />AROM-E AVENUE <br />MARSH STREET <br />SONORA STREET <br />HOBART AVENUE <br />NOTFALL CULVERTS <br />/2" L/OV <br />ALL LATERALS ON 7'1/E WE57- <br />S/DE TO GO UNDER 60-1 54" <br />STORM DRAIN <br />WALKER LANE <br />z4.1 <br />Q Q o F <br />o <br />W v �,. <br />° Q ^ 0 A h O <br />Y OV Q OQ NZ <br />n N <br />30 + <br />p e ^ p ti PAVEMENT PROFILE + h 30 <br />_ I I U <br />25 �— U b �- I 25 <br />Ex/57. 54" D EXIST. 54" O <br />Ex/sT 60"9 /07 LF- 8" <br />20 — — v35 S=B�t7 LF-B" <br />DESIGN DEPTH S FT. S• �' 0035 'ZO <br />DESIGN DEPTH 10 PT, DESIGN DEPTH9 FT. <br />/9.97 WEST \ /9.33 NORTH 2O.22 20.27 EAST 20.98 <br />CONSTRUCT 2 MN 20. / EAST, <br />15 CONNECTION 20. /3 NOKTN W /5 <br />2 <br />v <br />l0 27o cF /o" s=o.aozs 28z cF-/o" s=o.00zs <br />DESIGN DEPTH 19 FT. ~ <br />DESIGN DEPTH 20 FT. <br />9.34 WEST 9.39 00.77 /0.82 EAST <br />S O°W �j vW o° 5 <br />2 Q � <br />�Q U, �Q h <br />h n wt vt V un h <br />wzt o W <br />Z <br />Q2 <br />O / 2 3 4 5 G 7 8 9 /0 /l /2 /3 /4 /S /G <br />DATE: GEORGE S. NOLTE AND ASSOCIATES SHEET <br />SCALE: H/"•50', V.,":5' _ BY: �j � ■I1■ GEORGE S. NOLTE AND ASSOCIATES —EAST STOCKTON SANITARY SEWER PROJECT— 84 <br />DESIGNED: C.S. PARKER DATEA25.84 R,C,E 32717 <br />DRAWN: L.A. MAUIV COUNT"F SAN JOAQULN CIVIL AND ENVIRONMENTAL ENGINEERS •PLANNERS •SURVEYORS SOUTH COLLECTION SYSTEM -SCHEDULE E OF ls_i SHEETS <br />CHECKED: D. T. SCNUL TES SAN JOSE • WALNUT CREEK • SACRAMENTO SAN DIEGO <br />JOB N0. <br />DATE: <br />PROD. ENGR.:R,R.1/E/NEN A 408 287.3400 14151934.OW 19181445M20 17141278.9392 <br />ev DATE REVISIONS 7' B4 R.C.E. /7 6z WALKER LANE STA 0 00 TO 16+00 2181-83— <br />
The URL can be used to link to this page
Your browser does not support the video tag.