My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Improvement District No. 51 - East Stockton Sanitary Sewer Project- Contract Drawings for South Collection System - Schedule E
PublicWorks
>
VAULT MAPS
>
References
>
Improvement District No. 51 - East Stockton Sanitary Sewer Project
>
Improvement District No. 51 - East Stockton Sanitary Sewer Project- Contract Drawings for South Collection System - Schedule E
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/27/2025 9:11:50 AM
Creation date
1/24/2025 1:39:36 PM
Metadata
Fields
Template:
Reference
Ref Doc Name
Improvement District No. 51 - East Stockton Sanitary Sewer Project- Contract Drawings for South Collection System - Schedule E
Non-Public Works
Yes
Division Submitted By
Design Engineering
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
151
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
MAR51-1 STREET <br />SONORA STREET <br />HOBART AVENUE <br />L AFAYETTE STREET <br />WASH/A/GTON STREET <br />M/CLER AVENUE <br />NOTE.' <br />ALL CULVERTS /2" UON. <br />ALL LATERALS ON WE5T S/OE <br />TO GO UNDER 42" STORM ORA/N <br />F <br />WA G KER G A NE <br />Ffn <br />lu <br />30PAVEMENT <br />PROFILE <br />30 <br />r <br />a5.0-09047 <br />�X 54 O <br />24 IF -8"5=0.003S—�f....92" <br />O <br />ZO267 <br />L <br />Lf <br />DESIGN DEPTH 9 FT. <br />•ESIGN DEPTH 8 YT. 20'8$ £ ._ <br />20 <br />/S <br />/9.24 NORTK SOUTH <br />Z0. 59 EAST 20, 50 NORTH ¢` SOUTH <br />v <br />/9../9 E/!ST WEST... <br />/S <br />Z <br />/0 <br />3 <br />- ;- <br />- __ — _• <br />/0 <br />5 o <br />- <br />- _ <br />ku —.-m _" _ a • <br />5 <br />' <br />ha • <br />ZZ <br />y.. • • 3 <br />- _.. <br />.... a <br />R - E <br />�' Q <br />y- <br />a <br />r <br />E <br />t <br />� <br />t <br />/Z <br />DATE: <br />SCALE: IV. I''50; 1 1-S' _ <br />■ <br />DESIGNED: C.5. PARKER BY: <br />DRAWN: L.A. MA[/N DATE: 4.25.84 R.C.Em 32717 <br />CHECKED: O.T SCNULTES COUNTY OF ( ■ <br />PROJ. ENGR.: R.R Remev BY: <br />BY DATE REVISIONS DATE: 7 0'84 R.GE_ <br />/S /G /7 /8 <br />GEORGE S. NOLTE AND ASSOCIATES <br />CIVIL AND ENVIRONMENTAL ENGINEERS III PLANNERS • SURVEYORS <br />SAN JOSE • WALNUT CREEK • SACRAMENTO SAN DIEGO <br />14081287-34M 14151934.8M (91614485= 17141278.9392 <br />SHEET <br />OF 151 SHEETS <br />JOB NO. <br />2181— 83— <br />
The URL can be used to link to this page
Your browser does not support the video tag.