Laserfiche WebLink
;AST STOCK TON SANITARY SEWER PROJECT <br />ASSEnSMENT AND HOOKUP INFORMATION <br />Page 2 <br />D. <br />E. <br />Hookup Policy (Continued ) <br />b. A final determination has been made of laterals eligible for grant cost <br />participation. Additional laterals are no longer fundable at project <br />cost ($132). <br />c. Additional laterals could be added during construction, provided <br />property owners would pay 100% of the cost up front. <br />d. Additional lateral cost during the construction phase is estimated to be <br />between $800 and $1,200, dependent upon the type of lateral requested. <br />e. After construction, additional laterals would be added by an <br />encroachment permit process. <br />The Public Works Department recommends additional lateral additions be <br />allowed, with work to be done by the contractor. A definite 100% payment <br />commitment date would be established after the property owner is notified <br />the contractor is working in their area. <br />After Construction <br />The City of Stockton will assume maintenance and operational responsibility <br />upon project completion. The City will have the authority to determine the <br />capacity of the system to accept new hookups from within and outside the <br />project area. <br />FE2-HI <br />