Laserfiche WebLink
zzi 1 <br />F- :A FEDERAL PROJECT No. <br />EARL SHEET <br />SHEETS <br />L.V. No <br />STATE E°ER PR yE _'- <br />CALIF7 5-907 CQ "phase 2"10 LIO, <br />Roadway cut before <br />R' rEE_"'°" <br />SNEE. I `°T,._ <br />J <br />EXCAVATION BACKFILL EXCAVATION BACKFILL Bridge Construction <br />Sub rade <br />X SJ 907_ ) LO-1 10 <br />Subgrade <br />Original Ground III,New Embankment Approval Recommended <br />Original Ground f --J Ong. Ground <br />Pipe Pipe <br />1 Assistant State Highway Engineer–Bridges <br />Ditch at Flow LineChannel <br />Excavation p <br />Subgrade 1 <br />I -4 1 III--+IIF- Embankment in place <br />an a igNiway gineer-Operations <br />PIPE HEADWALLS structure excavation is made Approved AUQust 17 1953 <br />PIPE IN TRENCH I <br />a e HignWaf ngmeerCivil weer License 2084 <br />Slope or D I \ D <br />Subgrade <br />Subgrade To Accompany Plans Doted/1//e_-27,19SS <br />Roadwa Em Cine t \ <br />l \I'r\ Orig. Ground <br />I -- <br />or Cut Slope a 1 III <br />See Notes <br />DACIAD <br />n I <br />New Embankmen <br />Orig. Ground a-° Ong. Ground <br />II <br />or Subgradeor Subgrade <br />X B li jll II u <br />PIPE IN NEW EMBANKMENT <br />top of pipe <br />a• <br />o,,tl ., .;.. <br />I I 1_ <br />Height of Top of Embankment Before Excavating For Pipe <br />Shall Be As Follows:- <br />For pipe 24" or less dia: 6aabov <br />For C.M.P. over 24"to 90"dia:30'above bottom of pipe <br />B PLAN <br />For C.M.P. over 90'dla 1/3 point of dia. above bottom of pipe RETAINING WALLS I <br />For R.C.P. over 24dia: 30 above bottom of pipe I I I <br />BACKFILLForfieldassembledplateculvert: 1/3 point of dia. above.bottom Toe of Embankment EXCAVATION <br />4ARdwy <br />e Slope <br />of pipe <br />Structure Backfill 6"Above Top of Pipe I I <br />Subgrad <br />I I <br />Culvert <br />Rdwy Emb.I I Ground surface at time <br />PIPES RODS 81 DEADMEN I excavation is <br />madeExceptUnderdrainsaDowndrainsIB EXCAVATION BACKFILL <br />P <br />EXCAVATION BACKFILL Roadway Excavation Ori .Ground <br />S o: <br />ongGroa <br />und <br />Subgrade Orig. Groun <br />Original Ground <br />PLAN OF WING WALL <br />Da. <br />y <br />vr <br />SECTION B_ <br />SECTION A—A <br />EXCAVATION RoadwayBACKFILL <br />Embonkment ® Rdwy. Emb. <br />Side Slope <br />CULVERT IN TRENCH Orig. Ground e' FInw I or Subgrade ° <br />e< Ground surface at time structure Subgrade <br />excavation is made <br />A <br />I I' I--- 1' I- I I'I---4 I'I•.-- D.° nOrig Ground <br />aSubgradeSECTIONA—A <br />Top of Bo Roa y o toadway EmbankmeFlt <br />mbankmOn o <br />Rdwy. Excavation <br />e <br />7.. <br />Roadway Orig. GroundEmbankment Subgrade <br />Culvert,, Subgrade <br />DFIg. Ground d,., 0 4 °.i w '.e : o.a'' ba n'..;:. L •Sa .:$£5.., <br />d <br />Roadway Excavation <br />I1 I I I•r— <br />CULVERT IN EMBANKMENT <br />I <br />SECTION D—D <br />e,,.r,;:. SECTION C—C <br />Orig. Ground Ditch <br />Excavation <br />Flaw Line <br />BRIDGE ABUTMENTS & ADJOINING WING WALLS <br />Paving Notch <br />g <br />SECTION B—B LEGENDSubgrade <br />Roadway Embankment <br />WING WALLSrOrigroundo; <br />Structure Excavation <br />T • I' I' f I' <br />Structure Backfill <br />GRADE TOP CULVERT Ditch 81 Channel Excavation <br />BOX CULVERTS EXCAVATION BACKFILL EXCAVATION BACKFILL Roadway Embankment <br />Roadway Excavation <br />r <br />F Embankment or Note : Subgrade shall be lowest subgrade as <br />A Original Ground defined in the Standard Specifications <br />Embankment or Embankmen or <br />Original Ground <br />Embankment or 1 <br />g Original Ground Original Ground STATE OF CALIFORNIA <br />4" DEPARTMENT OF PUBLIC WORKS <br />Orig. Ground <br />Const. Joint <br />a ;:DIVISION OF HIGHWAYS <br />Channel or Ori Gr. Channel or Ori •Gr, x I'g Const. Joint <br />Ditch 81 Channel Ditch & Channel e <br />ExcavationExcavation I <br />o.a <br />Top limit of structure excavation and backfill is original Top limit of structure excavation and backfill is original STRUCTURE EXCAVATION AND <br />ground if channel is not excavated <br />ground if channel is not excavated <br />SLOPE PAVING <br />STRUCTURE BACKFILL <br />MONOLITHIC CONCRETE SLOPE PAVING, RIPRAP CONCRETES 0 <br />r <br />SCALE: BRIDGE: FILE:DRAWING: a <br />Revised: 5-19-55 Revised: 10-1-54 Revised 2-19-54 A 62 <br />Key on Retaining Walls Title <br />a <br />Coping