Laserfiche WebLink
PRASTATE FEDERAL PROJECT NO.FISCAL SHE" TOTAL <br />DIV.NO. YEAR NO. SNEETS <br />7 CALIF. S- 907 (i)d-I J`P a 9 10 <br />a Widen for Pedestrian Y roYw <br />Walkway when required <br />3 - 2"x 6"x 20-0' Rail <br />T. `°`".' Roare "`.'°" <br />Bridge Curb I" Chamfer <br />8"x8"x 5'-4"Post t) <br />Shoulder Line <br />X S J 907 10 <br />12d Nails <br />AW Y Y y J Approval Recomm n <br />34" x 14" Carriage bolts 2 x W'Carriage bolts ev As 'Slant state Highway Enginee <br />with cut washers with cut washers Dike <br />10• 20'30'40 <br />a 50'60 lb' 80 Appd SeotemhPr 71950 <br />X Edge of Pavement <br />wM. <br />w" In I I f <br />ti.(`b <br />f' n <br />I I state Highway Engineer Civil .license Ne 2084 <br />C I I <br />accompanyr ri/7P_ 2 7 /9SSCi., <br />6 <br />l_J c__J L J <br />Y=W 6'_B" 1 N 1--1'r6" To accompany plans dried <br />FRONT ELEVATION I I <br />4 Rail W = Offset from bridge curb to edge of shoulder <br />l <br />I L = Length of guard rail <br />X = Distance from beginning of guard rail at bridge 3/ <br />4"Cut washer Cut washers TAPER FOR SPEED CHANGE LANES <br />in Y = Offset at each t Joint Joint SIDE ELEVATION ON CONTINUOUSLY CURBED MEDIANSn:.:. epost <br />W e 1e <br />D 44- .a, <br />tt <br />6 `; <br />Edge of Pavement arg _______ __ <br />T <br />Base Line Parallel to Pav_ementt E <br />01 a Y Countersunk full depth 12 d Nails Joint A C D - - - <br />ry X W=3'W=4' W=5' W=6' W= 7' W=8' PLAN TangentUrb <br />SECTION AA 10 0.12 0.11 0.08 0.07 0.06 0.06 LAMINATED GUARD RAILING C' <br />X Offset mounting on curb at 20 0.48 0.44 0.31 0.30 0.23 0.22 AD Taper Length D' <br />end of bridge 30 1.08 1 .00 0.70 0.67 0.52 0.50 A B = BC = CD = 3 AD Width of Speed Change Lane is <br />40 1.92 1.78 1.25 1. 19 0.93 0.89 Traffic Ftow AB' & C'D' are Parabolic usually the same width as the <br />50 3.00 2.78 1.95 1.85 1 .45 1.39 Curb v Curves adjacent lane <br />2 lane highway_, <br />60 4.00 2.81 2.67 2.08 2.00 <br />The following table gives offsets from a BASE LINE parallel to703.83 3.63 2.83 2. <br />5 the EDGE OF PAVEMENT at intervals measured from point "A"80 S.Op 4.74 3.70 3.56 <br />90 6.00 4.69 4.50 Traffic Flow Add '•E" for measurements from edge of pavement. <br />Multi lane with median strip on 'bridge 100 5.79 5.56 10 12.5' 12.5' Offset from BASE LINE LENGTH OF TAPER , FEET <br />Z 110 7.00 6.72 90 120 150 180 240 27012018.00 Traffic Flow DD'=9' DD'= 10' DD 12'Offset from a of pavement = Y* a. DISTANCE FROM POINT A <br />Multi-lane with separate structures <br />P <br />0 0 0a)=Offset from pavement edge to top of bridge curb facezc'v <br />TYPICAL INSTALLATION OF METAL GUARD RAILING AT BRIDGES 0.14 0.16 0.19 7.5 10 12.5 15 20 22.5 <br />a-- <br />0.56 0.62 0.75 15 20 25 30 40 45 <br />Traffic Flow <br />1.27 1.41 1.69 22.5 30 37.5 45 60 67.5 <br />Chamfer <br />12» <br />SECTION 5'toIo' Yto10' 5' to B' 2.25 2.50 3.00 30 40 50 60 80 90 <br />e 4.50 5.00 6.00 45 60 75 90 120 135RaillReilStandardDoubleStripebyOthers ,i 2:1 Batter C 6.75 7.50 9.00 60 80 100 120 160 180 <br />7.73 8.59 10.31 67.5 90 112.5 135 180 202.5 <br />5" <br />H 6 ff 15.5 beam,5"std <br />2 8.44 9.38 11.25 75 100 125 150 200 225 <br />D'Paint BlacK1 • N a N o pipe with weather Variable 8.86 984 11.81 82.5 110 137.5 165 220 247.5vtightcap,or 60 lb. Iato20' <br />W Stencil Station 9.0 10.0 12.0 90 120 150 180 240 270 <br />in Black o E rail or equivalent 0.33' <br />N IV N section i Where Edge of Pavement is a curve, neither base line <br />Paint White,,,,,. aN N <br />4y1, nor taper between B' a C' will be atangent. Use proportional <br />ILA offsets from B' to C'm a <br />0.67 <br />The adopted offset "E"is usually 2'along outside edge of0.08' Rad. 4' 0.06' Rad. <br />Z co 45" pavement but may vary in some cases. <br />I"Chamfer 2 a 0.25 Max. <br />urwtNwW <br />v o. OA8' Rad. <br />x I P4 <br />rn SII I III <br />nI CROSS- SECTION SIDE- VIEW A I -A <br />cv <br />i i II I d Pick iii II i i iv a d A A <br />N I II I RAISED BARS w61 <br />ArteIOutHolessI , I <br />N ' I <br />III III II „ I 1 G c c <br />L-------'MA`L'I Wm L -----I <br />I <br />Irl i 1 <br />I II I u Note: Rail to be fastened to postTIMBERtIi <br />y1 po <br />o" DD W61 R <br />p n" n <br />FRONT REAR <br />as Per Manufacturert Instructions D D AI D D <br />Target Plate 8" Round Hole. Set post in position K,METAL CW61 R <br />C U LV ERT MARKERS and fill with ClassC"PCl~Max. a Aggregate <br />18 Gage Metal Frame POSTS FOR METAL GUARD RAILING z'Chamfer- <br />2 <br />b cp <br />1 c <br />s -+ wsl R PUBLIC ROAD INTERSECTION <br />X 8 Ref elctors <br />2„2,. <br />ear <br />wsl R with <br />Var. <br />I 18 Gage Metal Frame <br />3-3 Red Reflectors on Rt. R.12o, <br />of Traffic Flow or 2-3 Clear e Red Reflectors R= 120' <br />32'Reflectors on Lt.ofTraffic Flow CC RR°32'3"Yellow Reflectors120R= 'yin Q Red where shown on Plans <br />49 <br />37' R=120' <br />Bolts <br />i 18 Gauge N p o0 o 72 A <br />pv <br />113 <br />Metal Frame ir1 c'n a <br />m <br />Wel RA <br />A 1 <br />ii 100' <br />o iv in v Holes o A <br />Edge of Pavement <br />In <br />P <br />3"Yellow Reflectors <br />Holes co E U <br />A <br />X <br />To of Curb Red where shown <br />4"x4"S4S Timber Post Edge of Pavement <br />OD on plans <br />x Pavement <br />N t D 33' <br />x°D D <br />D WSIR <br />ID D <br />D <br />al <br />I i . .I . , iv b <br />R=25' R°25' <br />C <br />l I j l III AAA.i W61 R ~t a Var. <br />1 co <br />12 d Nails I III III yA Y vvY» <br />I o LEG END a GUIDE POSTS1IIIIIIIygyW,,y,, <br />III III n,Mi 'I annnAyl 1 _ I I 1 SII iii 1 zt ao Guide Post F T e Reflectors PRIVATE ROAD INTERSECTION <br />I I II er rte- -I- - . a x rl I d II I I i 0 <br />A YP <br />III 111 III j1 t I ,• •I 1 I x4x8Timber I II SII For details of I I N -AUnreflectorized Q Color Front Back <br />IQ III II II I I I I I I I I 11 O <br />1 I;' <br />Anchor Blocks 1,", i metal post see i i B Single 1% reflector A None None <br />L-------I_J LI 1 I It STATE OF CALIFORNIAILStGuidepostsIICThreeIclearreflectorsBClearI- Ids None <br />DEPARTMENT OF PUBLIC WORKSFRONTREARFRONTREARIICClear -1 <br />Note: Guide Post METAL TIMBER TIMBER METAL <br />D Single 3" clear reflector <br />E Clear 3-I " <br />None <br />L-----J ne DIVISION OF HIGHWAYS <br />pick out holes <br />CLEARANCE MARKERsameasculvertGUIDEPOSTSHORIZONTALREFLECTORUNITwslR DELINEATION OF TRAFFIC ISLANDS STANDARD STRUCTURES <br />c markers above. Type E shown. For Types A,B,CE D GUARD RAIL,GUIDE POSTS"ETC.See table at right <br />Jas <br />Revised 5-23-55 Revised 12-54 Revised 5-3-54 Revised 1-20-54 Revised 9-25-53 Revised 6.29-53 Revised 10.2-52 Revised 4-3-52 A-51 <br />Post for Metal Guard Railing Culvert Markers Pick out Holes Road In+ersections Reflectors 5peed Lanes Dike <br />T 2,1